X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494251604003

Well Details

Well ID: 0494251604003
Loading map...
Location: 00/04-16-049-25W4/3
Location Alias: 00/04-16-49-25 W4M
Location Alias 2: 00/04-16-049-25 W4/03
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 25
Section: 16
County/Municipality: Leduc County
Well Name: MEC LEDUC-WB 4-16-49-25
Operator Name: NEP Canada ULC
License Number: 0099491
License Date: 1982-12-02
License Status: Abandoned
Spud Date: 1983-02-24
Final Drill Date: 1983-03-12
Well Total Depth: 1614.00 m
Surface Hole Latitude: 53.223954
Surface Hole Longitude: -113.608274

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-12-02 Obtained License
1983-03-12 Finished Drilling
1983-03-12 Well Log Performed
1983-03-12 Well Mode changed to Drilled and Cased
1983-03-14 Production Casing Operation Performed
1983-03-22 Perforation Treatment Performed - Jet Perforation
1983-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-03-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-08-19 Perforation Treatment Performed - Jet Perforation
1983-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-09-16 Perforation Treatment Performed - Cement Squeeze
1983-09-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-01-23 Perforation Treatment Performed - Jet Perforation
1984-01-23 Well Log Performed
1984-01-25 Perforation Treatment Performed - Cement Squeeze
1984-01-26 Perforation Treatment Performed - Jet Perforation
1984-01-31 Perforation Treatment Performed - Jet Perforation
1984-02-01 Well Log Performed
1984-02-02 Perforation Treatment Performed - Fractured
1984-02-10 Perforation Treatment Performed - Cement Squeeze
1984-02-13 Perforation Treatment Performed - Cement Squeeze
1984-06-02 Perforation Treatment Performed - Jet Perforation
1984-06-02 Well Log Performed
1984-06-03 Perforation Treatment Performed - Fractured
1985-01-29 Perforation Treatment Performed - Fractured
1991-11-23 Perforation Treatment Performed - Jet Perforation
1991-11-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-12-03 Perforation Treatment Performed - Cement Squeeze
1991-12-03 Plug Back Performed
1997-01-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-01-08 Perforation Treatment Performed - Jet Perforation
1997-01-08 Plug Back Performed
1997-01-08 Well Log Performed
1997-01-11 Well Began Production
1997-01-11 Well Fluid changed to Crude Oil
1997-01-11 Well Mode changed to Pumping
1998-07-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-07-12 Plug Back Performed
1998-11-30 Well Fluid changed to Crude Oil
1998-11-30 Well Mode changed to Suspended
1998-12-11 Well Abandoned
1998-12-11 Well Fluid changed to Crude Oil
1998-12-11 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-03-22 Perforation 1577.00 1578.50 13
1983-03-25 Acid Treatment 1577.00 1600.00 0
1983-08-19 Perforation 1538.80 1541.80 13
1983-08-31 Acid Treatment 1538.80 1541.80 0
1983-09-16 Cement Squeeze 1538.80 1541.80 0
1983-09-19 Acid Treatment 1578.50 1594.50 0
1984-01-23 Perforation 1360.00 1363.00 13
1984-01-25 Cement Squeeze 1360.00 1363.00 0
1984-01-26 Perforation 1318.00 1320.00 13
1984-01-31 Perforation 1329.00 1332.00 13
1984-02-02 Fracture 1318.00 1320.00 0
1983-03-22 Perforation 1588.00 1589.00 13
1984-02-10 Cement Squeeze 1318.00 1363.00 0
1984-02-13 Cement Squeeze 1360.00 1363.00 0
1984-06-02 Perforation 1539.00 1542.00 13
1984-06-03 Fracture 1539.00 1542.00 0
1985-01-29 Fracture 1577.00 1600.00 0
1991-11-23 Perforation 1357.00 1360.00 13
1991-11-28 Acid Treatment 1357.00 1360.00 0
1991-12-03 Cement Squeeze 1357.00 1360.00 0
1997-01-08 Packing Device Capped w/Cement 1522.00 1530.00 0
1997-01-08 Perforation 1318.00 1321.00 13
1983-03-22 Perforation 1586.00 1597.50 13
1998-07-12 Packing Device Capped w/Cement 1302.00 1310.00 0
1983-03-22 Perforation 1584.50 1585.50 13
1983-03-22 Perforation 1590.00 1591.50 13
1983-03-22 Perforation 1592.00 1593.00 13
1983-03-22 Perforation 1593.50 1594.50 13
1983-03-22 Perforation 1599.00 1600.00 13
1983-03-23 Acid Treatment 1577.00 1600.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 2600 0.0 0.0 0.0

For data sources see[5]

References