X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494250512002

Well Details

Well ID: 0494250512002
Loading map...
Location: 00/12-05-049-25W4/2
Location Alias: 00/12-05-49-25 W4M
Location Alias 2: 00/12-05-049-25 W4/02
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 25
Section: 05
County/Municipality: Leduc County
Well Name: SASKOIL ET AL LEDUC 12-5-49-25
Operator Name: CNOOC Petroleum North America ULC
License Number: 0113993
License Date: 1985-03-15
License Status: RecCertified
Spud Date: 1985-03-20
Final Drill Date: 1985-03-21
Well Total Depth: 1618.00 m
Surface Hole Latitude: 53.202019
Surface Hole Longitude: -113.631956

For data sources see[1][2]

Well History

Date Event
1985-03-15 Obtained License
1985-03-21 Finished Drilling
1985-03-21 Perforation Treatment Performed - Open-Hole Completion
1985-03-21 Rig Released
1985-03-21 Well Mode changed to Drilled and Cased
1985-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-04-28 Well Log Performed
1985-05-05 Liner Casing Operation Performed
1985-05-05 Perforation Treatment Performed - Cement Squeeze
1985-05-07 Perforation Treatment Performed - Open-Hole Completion
1985-05-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-05-12 Well Began Injection
1985-05-12 Well Fluid changed to Water
1985-05-12 Well Type changed to Disposal
1990-10-17 Well Log Performed
1990-10-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-10-21 Perforation Treatment Performed - Cement Plug
1990-10-21 Plug Back Performed
1990-10-21 Well Fluid changed to Water
1990-10-21 Well Mode changed to Abandoned
1990-10-21 Well Type changed to Disposal
1990-10-22 Perforation Treatment Performed - Jet Perforation
1990-10-22 Perforation Treatment Performed - Remedial Casing
1990-10-23 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-03-21 Open Hole/Barefoot Completion 1587.40 1595.00 0
1985-03-22 Acid Treatment 1587.40 1595.00 0
1985-05-05 Cement Squeeze 1587.40 1595.00 0
1985-05-07 Open Hole/Barefoot Completion 1607.00 1618.00 0
1985-05-08 Acid Treatment 1607.00 1618.00 0
1990-10-21 Packing Device Capped w/Cement 1574.00 1582.00 0
1990-10-21 Cement Plug 863.50 1200.00 0
1990-10-22 Perforation 247.00 248.00 13
1990-10-22 Remedial Casing Cementing 247.00 248.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0

For data sources see[5]

References