X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494200313000

Well Details

Well ID: 0494200313000
Loading map...
Location: 00/13-03-049-20W4/0
Location Alias: 00/13-03-49-20 W4M
Location Alias 2: 00/13-03-049-20 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 20
Section: 03
County/Municipality: Camrose County
Well Name: PARA JOAM 13-3-49-20
Operator Name: Paramount Resources Ltd.
License Number: 0238323
License Date: 2000-06-09
License Status: RecCertified
Spud Date: 2000-07-07
Final Drill Date: 2000-07-11
Well Total Depth: 1185.00 m
Surface Hole Latitude: 53.206311
Surface Hole Longitude: -112.854081

For data sources see[1][2]

Well History

Date Event
2000-06-09 Obtained License
2000-07-09 Surface Casing Operation Performed
2000-07-11 Finished Drilling
2000-07-12 Well Log Performed
2000-07-13 Production Casing Operation Performed
2000-07-13 Rig Released
2000-07-13 Well Mode changed to Drilled and Cased
2000-08-09 Perforation Treatment Performed - Jet Perforation
2000-08-09 Well Log Performed
2000-08-10 Perforation Treatment Performed - Jet Perforation
2000-08-10 Well Log Performed
2000-08-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-11-06 Well Began Production
2000-11-06 Well Fluid changed to Gas
2000-11-06 Well Mode changed to Flowing
2000-12-11 Well Fluid changed to Gas
2000-12-11 Well Mode changed to Suspended
2009-03-17 Well Log Performed
2009-03-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-18 Perforation Treatment Performed - Jet Perforation
2009-03-18 Plug Back Performed
2009-03-18 Well Fluid changed to Gas
2009-03-18 Well Log Performed
2009-03-18 Well Mode changed to Abandoned Zone
2009-03-19 Perforation Treatment Performed - Jet Perforation
2009-03-19 Well Log Performed
2009-03-20 Perforation Treatment Performed - Cement Squeeze
2009-03-24 Perforation Treatment Performed - Jet Perforation
2009-03-25 Perforation Treatment Performed - Cement Squeeze
2009-08-28 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-08-09 Perforation 1164.00 1165.00 18
2009-03-20 Cement Squeeze 555.00 556.00 0
2009-03-24 Perforation 476.00 477.00 13
2009-03-25 Cement Squeeze 476.00 477.00 0
2000-08-10 Perforation 1135.00 1138.50 18
2000-08-14 Acid Treatment 1135.00 1138.50 0
2009-03-18 Packing Device Capped w/Cement 1154.00 1162.00 0
2009-03-18 Packing Device Capped w/Cement 1125.00 1133.00 0
2009-03-18 Perforation 553.00 553.30 24
2009-03-19 Perforation 555.00 555.30 14
2009-03-19 Perforation 555.00 556.00 14
2009-03-20 Cement Squeeze 553.00 553.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 669 0.0 0.0 0.0

For data sources see[5]

References