X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494110310000

Well Details

Well ID: 0494110310000
Loading map...
Location: 00/10-03-049-11W4/0
Location Alias: 00/10-03-49-11 W4M
Location Alias 2: 00/10-03-049-11 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 11
Section: 03
County/Municipality: County of Minburn No. 27
Well Name: PINE CLIFF VIK-KINS 10-3-49-11
Operator Name: Pine Cliff Energy Ltd.
License Number: 0047835
License Date: 1973-10-26
License Status: Issued
Spud Date: 1973-11-11
Final Drill Date: 1973-11-16
Well Total Depth: 762.00 m
Surface Hole Latitude: 53.200948
Surface Hole Longitude: -111.527687

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-10-26 Obtained License
1973-11-16 Finished Drilling
1973-11-16 Lost Circulation Occurred
1973-11-18 Production Casing Operation Performed
1974-03-29 Perforation Treatment Performed - Jet Perforation
1974-03-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-05-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1974-05-30 Perforation Treatment Performed - Jet Perforation
1974-05-30 Well Mode changed to Drilled and Cased
1974-05-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1974-05-31 Perforation Treatment Performed - Jet Perforation
1974-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-06-19 Perforation Treatment Performed - Fractured
1975-06-25 Well Began Production
1975-06-25 Well Fluid changed to Gas
1975-06-25 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-03-29 Perforation 723.00 724.50 7
1974-03-30 Acid Treatment 723.00 724.50 0
1974-05-30 Packing Device Capped w/Cement 709.00 716.30 0
1974-05-30 Perforation 621.50 623.00 7
1974-05-31 Packing Device Capped w/Cement 609.90 617.20 0
1974-05-31 Perforation 581.60 584.60 7
1974-06-19 Acid Treatment 581.60 584.60 0
1974-06-19 Fracture 581.60 584.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 2626 0.0 0.0 0.0
1976 7197 0.0 0.0 0.0
1977 856 0.0 0.0 0.0
1978 2966 0.0 0.0 0.0
1979 2555 0.0 0.0 0.0
1980 4811 0.0 0.0 0.0
1981 5922 0.0 0.0 0.0
1982 3081 0.0 0.0 0.0
1983 3700 0.0 0.0 0.0
1984 2679 0.0 0.0 0.0
1985 4208 0.0 0.0 0.0
1986 4833 0.0 0.0 0.0
1987 2883 0.0 0.0 0.0
1988 1197 0.0 0.0 0.0
1989 2182 0.0 0.0 0.0
1990 3781 0.0 0.0 0.0
1991 4056 0.0 0.0 0.0
1992 1897 0.0 0.0 0.0
1993 3654 0.0 0.0 0.0
1994 2646 0.0 0.0 0.0
1995 2492 0.0 0.0 0.0
1996 5977 0.0 0.0 0.0
1997 6255 0.0 0.0 0.0
1998 4431 0.0 0.0 0.0
1999 5977 0.0 0.0 0.0
2000 8306 0.0 0.0 0.0
2001 8318 0.0 0.0 0.0
2002 8587 0.0 0.0 0.0
2003 8652 0.0 0.0 0.0
2004 8755 0.0 0.0 0.0
2005 8207 0.0 0.0 0.0
2006 8244 0.0 0.0 0.0
2007 8471 0.0 0.0 0.0
2008 8500 0.0 0.0 0.0
2009 8567 0.0 0.0 0.0
2010 8400 0.0 0.0 0.0
2011 7942 0.0 0.0 0.0
2012 2517 0.0 0.0 0.0
2013 4721 0.0 0.0 0.0
2014 4797 0.0 0.0 0.0
2015 4984 0.0 0.0 0.0
2016 8382 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1973-11-16 Lost Circulation 748.30 748.30

For data sources see[6]

References