X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494101313000

Well Details

Well ID: 0494101313000
Loading map...
Location: 00/13-13-049-10W4/0
Location Alias: 00/13-13-49-10 W4M
Location Alias 2: 00/13-13-049-10 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 10
Section: 13
County/Municipality: County of Minburn No. 27
Well Name: POC VIK-KINS 13-13-49-10
Operator Name: Perpetual Operating Corp.
License Number: 0093000
License Date: 1981-10-28
License Status: RecCertified
Spud Date: 1981-11-09
Final Drill Date: 1981-11-12
Well Total Depth: 819.00 m
Surface Hole Latitude: 53.230861
Surface Hole Longitude: -111.340074

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-10-28 Obtained License
1981-11-12 Finished Drilling
1981-11-13 Production Casing Operation Performed
1981-11-15 Well Mode changed to Drilled and Cased
1981-12-04 Perforation Treatment Performed - Jet Perforation
1982-11-19 Well Began Production
1982-11-19 Well Fluid changed to Gas
1982-11-19 Well Mode changed to Flowing
1995-01-01 Well Fluid changed to Gas
1995-01-01 Well Mode changed to Suspended
1998-03-17 Well Fluid changed to Gas
1998-03-17 Well Mode changed to Flowing
1998-03-31 Well Fluid changed to Gas
1998-03-31 Well Mode changed to Suspended
2000-06-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-06-08 Plug Back Performed
2000-06-14 Well Log Performed
2000-06-15 Perforation Treatment Performed - Jet Perforation
2000-06-16 Perforation Treatment Performed - Remedial Casing
2000-06-18 Perforation Treatment Performed - Jet Perforation
2000-06-20 Perforation Treatment Performed - Remedial Casing
2000-06-22 Well Abandoned
2000-06-22 Well Fluid changed to Gas
2000-06-22 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-12-04 Perforation 622.80 623.80 8
2000-06-08 Packing Device Capped w/Cement 604.00 612.00 0
2000-06-15 Perforation 465.50 466.00 13
2000-06-16 Remedial Casing Cementing 465.50 466.00 0
2000-06-18 Perforation 230.00 231.00 13
2000-06-20 Remedial Casing Cementing 230.00 231.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 1028 0.0 0.0 0.0
1983 1745 0.0 0.0 0.0
1984 5270 0.0 0.0 0.0
1985 5335 0.0 0.0 0.0
1986 4979 0.0 0.0 0.0
1987 2137 0.0 0.0 0.0
1988 4831 0.0 0.0 0.0
1989 4451 0.0 0.0 0.0
1990 3816 0.0 0.0 0.0
1991 4869 0.0 0.0 0.0
1992 3452 0.0 0.0 0.0
1993 1986 0.0 0.0 0.0
1994 2603 0.0 0.0 0.0
1998 336 0.0 0.0 0.0

For data sources see[5]

References