X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494082106004

Well Details

Well ID: 0494082106004
Loading map...
Location: 00/06-21-049-08W4/4
Location Alias: 00/06-21-49-08 W4M
Location Alias 2: 00/06-21-049-08 W4/04
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 08
Section: 21
County/Municipality: County of Minburn No. 27
Well Name: SPL MANN 6-21-49-8
Operator Name: Spur Petroleum Ltd.
License Number: 0100346
License Date: 1983-01-28
License Status: Issued
Spud Date: 1983-02-12
Final Drill Date: 1983-02-15
Well Total Depth: 814.00 m
Surface Hole Latitude: 53.240793
Surface Hole Longitude: -111.119279

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-01-28 Obtained License
1983-02-14 Drill Stem Test Performed
1983-02-15 Finished Drilling
1983-02-15 Well Mode changed to Drilled and Cased
1983-02-19 Drill Stem Test Performed
1983-02-20 Production Casing Operation Performed
1983-06-02 Perforation Treatment Performed - Jet Perforation
1983-06-04 Perforation Treatment Performed - Cement Squeeze
1983-06-07 Perforation Treatment Performed - Jet Perforation
2007-12-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-12-18 Plug Back Performed
2007-12-18 Well Log Performed
2010-03-07 Perforation Treatment Performed - Jet Perforation
2010-03-07 Well Log Performed
2010-03-08 Perforation Treatment Performed - Jet Perforation
2010-06-22 Perforation Treatment Performed - Fractured
2010-09-01 Well Began Production
2010-09-01 Well Fluid changed to Shale Gas Only
2010-09-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-06-02 Perforation 779.00 781.00 13
1983-06-04 Cement Squeeze 779.00 781.00 0
1983-06-07 Perforation 773.00 776.00 13
2007-12-18 Packing Device Capped w/Cement 756.00 764.00 0
2007-12-18 Packing Device Capped w/Cement 742.00 750.00 0
2010-03-07 Perforation 613.50 615.00 20
2010-03-08 Perforation 477.00 480.00 13
2010-06-22 Fracture 477.00 480.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 2893 0.0 0.0 0.0
2011 8654 0.0 0.0 0.0
2012 8735 0.0 0.0 0.0
2013 8739 0.0 0.0 0.0
2014 8539 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8639 0.0 0.0 0.0
2017 8707 0.0 0.0 0.0
2018 7539 0.0 0.0 0.0
2019 5968 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[5]

References