X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494010113C00

Well Details

Well ID: 0494010113C00
Loading map...
Location: C0/13-01-049-01W4/0
Location Alias: C0/13-01-49-01 W4M
Location Alias 2: C0/13-01-049-01 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 01
Section: 01
County/Municipality: County of Vermilion River
Well Name: TIDAL CAN CHIEF LDC LLOYD 13C-1-49-1
Operator Name: Murphy Oil Company Ltd.
License Number: 0017806
License Date: 1959-09-24
License Status: RecCertified
Spud Date: 1960-07-08
Final Drill Date: 1960-07-14
Well Total Depth: 597.40 m
Surface Hole Latitude: 53.204335
Surface Hole Longitude: -110.028362

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-09-24 Obtained License
1960-07-14 Finished Drilling
1960-07-14 Production Casing Operation Performed
1960-07-14 Well Mode changed to Drilled and Cased
1960-08-24 Perforation Treatment Performed - Bullet Perforation
1960-10-07 Perforation Treatment Performed - Cement Squeeze
1960-10-17 Perforation Treatment Performed - Jet Perforation
1960-11-10 Perforation Treatment Performed - Cement Squeeze
1960-11-23 Perforation Treatment Performed - Jet Perforation
1960-12-03 Well Began Production
1960-12-03 Well Fluid changed to Crude Oil
1960-12-03 Well Mode changed to Pumping
1961-07-31 Perforation Treatment Performed - Bullet Perforation
1974-08-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1974-08-22 Well Abandoned
1974-08-22 Well Fluid changed to Crude Oil
1974-08-22 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-08-24 Bullet Perforation 575.50 576.70 13
1960-10-07 Cement Squeeze 575.50 576.70 0
1960-10-17 Perforation 576.10 577.30 13
1960-11-10 Cement Squeeze 576.10 577.30 0
1960-11-23 Perforation 576.10 577.30 30
1961-07-31 Bullet Perforation 575.50 576.10 13
1961-07-31 Bullet Perforation 576.10 577.30 7
1974-08-22 Packing Device Capped w/Cement 566.90 566.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0

For data sources see[5]

References