X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494010103000

Well Details

Well ID: 0494010103000
Loading map...
Location: 00/03-01-049-01W4/0
Location Alias: 00/03-01-49-01 W4M
Location Alias 2: 00/03-01-049-01 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 01
Section: 01
County/Municipality: County of Vermilion River
Well Name: MOBIL-GC ET AL LLOYD WW 3D-1-49-1
Operator Name: ExxonMobil Canada Ltd.
License Number: 0097114
License Date: 1982-08-23
License Status: RecCertified
Spud Date: 1982-09-04
Final Drill Date: 1982-09-06
Well Total Depth: 685.00 m
Surface Hole Latitude: 53.193582
Surface Hole Longitude: -110.020512

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-08-23 Obtained License
1982-09-06 Finished Drilling
1982-09-07 Production Casing Operation Performed
1982-09-07 Well Mode changed to Drilled and Cased
1982-10-01 Perforation Treatment Performed - Jet Perforation
1983-03-08 Well Mode changed to Drilled and Cased
1984-08-24 Well Began Injection
1984-08-24 Well Fluid changed to Water
1984-08-24 Well Type changed to Disposal
1988-09-01 Well Fluid changed to Water
1988-09-01 Well Mode changed to Suspended
1988-09-01 Well Type changed to Disposal
1990-09-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-09-14 Plug Back Performed
1990-09-14 Well Abandoned
1990-09-14 Well Fluid changed to Water
1990-09-14 Well Mode changed to Abandoned
1990-09-14 Well Type changed to Disposal
1994-10-26 Perforation Treatment Performed - Jet Perforation
1994-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-10-29 Perforation Treatment Performed - Remedial Casing
1995-06-08 Perforation Treatment Performed - Jet Perforation
1996-06-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-06-08 Perforation Treatment Performed - Remedial Casing
1996-06-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-06-12 Perforation Treatment Performed - Abrasa-Jet Perforation
1996-06-12 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-10-01 Perforation 659.00 668.00 13
1996-06-09 Packing Device Capped w/Cement 397.00 405.00 0
1996-06-12 Hydra Jet Perforation 328.00 328.00 0
1996-06-12 Remedial Casing Cementing 328.00 328.00 0
1990-09-14 Packing Device Capped w/Cement 640.00 650.00 0
1994-10-26 Perforation 409.50 410.70 13
1994-10-26 Perforation 422.00 423.20 13
1994-10-29 Acid Treatment 409.50 423.20 0
1994-10-29 Remedial Casing Cementing 409.50 423.20 0
1995-06-08 Perforation 531.20 532.20 14
1996-06-08 Remedial Casing Cementing 531.20 532.20 0
1996-06-08 Packing Device Capped w/Cement 460.00 519.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0

For data sources see[5]

References