X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485162711002

Well Details

Well ID: 0485162711002
Loading map...
Location: 00/11-27-048-16W5/2
Location Alias: 00/11-27-48-16 W5M
Location Alias 2: 00/11-27-048-16 W5/02
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 16
Section: 27
County/Municipality: Yellowhead County
Well Name: SEAGULL PECO 11-27-48-16
Operator Name: Canadian Natural Resources Limited
License Number: 0059378
License Date: 1976-07-26
License Status: Suspension
Spud Date: 1976-08-29
Final Drill Date: 1976-10-04
Well Total Depth: 3186.70 m
Surface Hole Latitude: 53.173173
Surface Hole Longitude: -116.261210

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-07-26 Obtained License
1976-09-26 Lost Circulation Occurred
1976-10-04 Finished Drilling
1976-10-04 Well Log Performed
1976-10-04 Well Mode changed to Drilled and Cased
1976-10-08 Production Casing Operation Performed
1976-10-17 Perforation Treatment Performed - Jet Perforation
1976-10-18 Perforation Treatment Performed - Cement Squeeze
1976-11-14 Perforation Treatment Performed - Jet Perforation
1976-11-30 Perforation Treatment Performed - Fractured
1977-04-15 Perforation Treatment Performed - Fractured
1997-03-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-03-15 Well Log Performed
1997-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-03-16 Perforation Treatment Performed - Jet Perforation
1997-03-16 Well Log Performed
1997-03-17 Perforation Treatment Performed - Cement Squeeze
1997-03-18 Perforation Treatment Performed - Jet Perforation
1997-03-18 Well Log Performed
1997-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-03-19 Perforation Treatment Performed - Cement Squeeze
1997-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-03-20 Perforation Treatment Performed - Cement Squeeze
1997-03-21 Perforation Treatment Performed - Cement Squeeze
1997-03-27 Perforation Treatment Performed - Jet Perforation
1997-03-27 Well Log Performed
1997-03-28 Perforation Treatment Performed - Jet Perforation
1997-03-28 Well Log Performed
1997-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-04-05 Perforation Treatment Performed - Fractured
1997-04-24 Well Began Production
1997-04-24 Well Fluid changed to Gas
1997-04-24 Well Mode changed to Flowing
1997-06-12 Perforation Treatment Performed - Jet Perforation
1997-06-12 Well Log Performed
1997-06-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-06-14 Perforation Treatment Performed - Cement Squeeze
1997-06-15 Perforation Treatment Performed - Jet Perforation
1997-06-15 Perforation Treatment Performed - Remedial Casing
1997-06-25 Perforation Treatment Performed - Jet Perforation
1997-06-25 Well Log Performed
1997-06-26 Perforation Treatment Performed - Cement Squeeze
1997-07-17 Well Log Performed
2008-06-30 Well Fluid changed to Gas
2008-06-30 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-10-17 Perforation 3151.60 3152.20 26
1997-03-17 Cement Squeeze 2495.00 2495.30 0
1997-03-18 Perforation 2463.00 2463.50 14
1997-03-18 Perforation 2402.00 2403.00 14
1997-03-18 Perforation 2050.00 2050.50 14
1997-03-18 Perforation 1905.00 1906.00 14
1997-03-19 Acid Treatment 2463.00 2463.50 0
1997-03-19 Cement Squeeze 2463.00 2463.50 0
1997-03-20 Acid Treatment 2050.00 2050.50 0
1997-03-20 Cement Squeeze 2050.00 2050.50 0
1997-03-21 Cement Squeeze 1900.00 1906.00 0
1976-10-18 Cement Squeeze 3151.60 3152.20 0
1997-03-27 Perforation 2425.00 2427.00 20
1997-03-28 Perforation 2409.00 2414.00 18
1997-03-28 Perforation 2451.50 2454.50 18
1997-03-29 Acid Treatment 2409.00 2454.50 0
1997-04-05 Fracture 2409.00 2454.50 0
1997-06-12 Perforation 1250.00 1250.30 24
1997-06-14 Acid Treatment 1250.00 1250.30 0
1997-06-14 Cement Squeeze 1250.00 1250.30 0
1997-06-15 Perforation 600.00 600.30 80
1997-06-15 Remedial Casing Cementing 600.00 600.30 0
1976-11-14 Perforation 3026.70 3029.70 7
1997-06-25 Perforation 1999.00 2005.00 16
1997-06-26 Cement Squeeze 1999.00 2005.00 0
1976-11-30 Fracture 3026.70 3029.70 0
1977-04-15 Fracture 3026.70 3029.70 0
1997-03-15 Packing Device Capped w/Cement 2987.50 2995.50 0
1997-03-16 Perforation 2495.00 2495.30 13
1997-03-16 Perforation 1900.00 1900.30 13
1997-03-16 Acid Treatment 2495.00 2495.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 3598 0.0 0.0 0.0
1998 5387 0.0 0.0 0.0
1999 6929 0.0 0.0 0.0
2000 6646 0.0 0.0 0.0
2001 5705 0.0 0.0 0.0
2002 6872 0.0 0.0 0.0
2003 8706 0.0 0.0 0.0
2004 8534 0.0 0.0 0.0
2005 8399 0.0 0.0 0.0
2006 5951 0.0 0.0 0.0
2007 3384 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1976-09-26 Lost Circulation 3032.20 3057.70

For data sources see[6]

References