X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485123315020

Well Details

Well ID: 0485123315020
Loading map...
Location: 02/15-33-048-12W5/0
Location Alias: 02/15-33-48-12 W5M
Location Alias 2: 02/15-33-048-12 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 12
Section: 33
County/Municipality: Yellowhead County
Well Name: RIDGEBACK HZ 102 BRAZR 15-33-48-12
Operator Name: Ridgeback Resources Inc.
License Number: 0491626
License Date: 2018-10-25
License Status: Issued
Spud Date: 2019-11-20
Final Drill Date: 2019-11-27
Well Total Depth: 4268.00 m
Surface Hole Latitude: 53.170469
Surface Hole Longitude: -115.687172

For data sources see[1][2]

Well History

Date Event
2018-10-25 Obtained License
2019-11-20 Drill To LD
2019-11-20 Surface Casing Operation Performed
2019-11-22 Direction Drilling Operation Performed - Deviate
2019-11-23 Direction Drilling Operation Performed - Horizontal
2019-11-27 Finished Drilling
2019-11-27 Well Log Performed
2019-11-27 Well Mode changed to Drilled and Cased
2019-11-28 Perforation Treatment Performed - Open-Hole Completion
2019-11-28 Production Casing Operation Performed
2019-11-28 Rig Released
2020-02-25 Perforation Treatment Performed - Multi-Stage Fracture
2020-02-26 Perforation Treatment Performed - Multi-Stage Fracture
2020-03-14 Well Began Production
2020-03-14 Well Fluid changed to Crude Oil
2020-03-14 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-11-20 Horizon Drilling Inc. 39 Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-11-22 1615.90 Deviate (5 - 79 degrees)
2019-11-23 2029.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-11-28 Open Hole/Barefoot Completion 4265.00 4268.00 0
2020-02-25 Multi-Stage Fracture 3934.30 3934.40 0
2020-02-25 Multi-Stage Fracture 3894.70 3894.80 0
2020-02-25 Multi-Stage Fracture 3867.10 3867.20 0
2020-02-25 Multi-Stage Fracture 3826.60 3826.70 0
2020-02-25 Multi-Stage Fracture 3787.60 3787.70 0
2020-02-25 Multi-Stage Fracture 3747.20 3747.30 0
2020-02-25 Multi-Stage Fracture 3720.60 3720.70 0
2020-02-25 Multi-Stage Fracture 3680.60 3680.70 0
2020-02-25 Multi-Stage Fracture 3641.60 3641.70 0
2020-02-25 Multi-Stage Fracture 3601.90 3602.00 0
2020-02-25 Multi-Stage Fracture 4229.70 4229.80 0
2020-02-25 Multi-Stage Fracture 3562.50 3562.60 0
2020-02-25 Multi-Stage Fracture 3523.90 3524.00 0
2020-02-25 Multi-Stage Fracture 3496.30 3496.40 0
2020-02-25 Multi-Stage Fracture 3455.30 3455.40 0
2020-02-25 Multi-Stage Fracture 3415.70 3415.80 0
2020-02-25 Multi-Stage Fracture 3375.90 3376.00 0
2020-02-26 Multi-Stage Fracture 3348.10 3348.20 0
2020-02-26 Multi-Stage Fracture 3309.80 3309.90 0
2020-02-26 Multi-Stage Fracture 3269.00 3269.10 0
2020-02-26 Multi-Stage Fracture 3240.90 3241.00 0
2020-02-25 Multi-Stage Fracture 4203.40 4203.50 0
2020-02-26 Multi-Stage Fracture 3199.30 3199.40 0
2020-02-26 Multi-Stage Fracture 3159.20 3159.30 0
2020-02-26 Multi-Stage Fracture 3119.40 3119.50 0
2020-02-26 Multi-Stage Fracture 3091.50 3091.60 0
2020-02-26 Multi-Stage Fracture 3051.20 3051.30 0
2020-02-26 Multi-Stage Fracture 3012.90 3013.00 0
2020-02-26 Multi-Stage Fracture 2971.40 2971.50 0
2020-02-26 Multi-Stage Fracture 2931.00 2931.10 0
2020-02-26 Multi-Stage Fracture 2903.70 2903.80 0
2020-02-26 Multi-Stage Fracture 2863.30 2863.40 0
2020-02-25 Multi-Stage Fracture 4161.80 4161.90 0
2020-02-26 Multi-Stage Fracture 2821.70 2821.80 0
2020-02-26 Multi-Stage Fracture 2793.50 2793.60 0
2020-02-26 Multi-Stage Fracture 2752.20 2752.30 0
2020-02-26 Multi-Stage Fracture 2711.50 2711.60 0
2020-02-26 Multi-Stage Fracture 2684.50 2684.60 0
2020-02-26 Multi-Stage Fracture 2644.60 2644.70 0
2020-02-26 Multi-Stage Fracture 2604.20 2604.30 0
2020-02-26 Multi-Stage Fracture 2563.80 2563.90 0
2020-02-26 Multi-Stage Fracture 2536.80 2536.90 0
2020-02-26 Multi-Stage Fracture 2495.00 2495.10 0
2020-02-25 Multi-Stage Fracture 4122.00 4122.10 0
2020-02-26 Multi-Stage Fracture 2454.10 2454.20 0
2020-02-26 Multi-Stage Fracture 2426.10 2426.20 0
2020-02-26 Multi-Stage Fracture 2384.40 2384.50 0
2020-02-26 Multi-Stage Fracture 2342.40 2342.50 0
2020-02-26 Multi-Stage Fracture 2314.60 2314.70 0
2020-02-26 Multi-Stage Fracture 2273.10 2273.20 0
2020-02-26 Multi-Stage Fracture 2231.30 2231.40 0
2020-02-26 Multi-Stage Fracture 2203.60 2203.70 0
2020-02-26 Multi-Stage Fracture 2162.10 2162.20 0
2020-02-26 Multi-Stage Fracture 2121.90 2122.00 0
2020-02-25 Multi-Stage Fracture 4081.50 4081.60 0
2020-02-26 Multi-Stage Fracture 2080.70 2080.80 0
2020-02-26 Multi-Stage Fracture 2052.60 2052.70 0
2020-02-25 Multi-Stage Fracture 4054.10 4054.20 0
2020-02-25 Multi-Stage Fracture 4012.60 4012.70 0
2020-02-25 Multi-Stage Fracture 3973.80 3973.90 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 534 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-11-28 No Incident Encountered 0.00 0.00
2020-03-01 No Incident Encountered 0.00 0.00

For data sources see[8]

References