X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485122705000

Well Details

Well ID: 0485122705000
Loading map...
Location: 00/05-27-048-12W5/0
Location Alias: 00/05-27-48-12 W5M
Location Alias 2: 00/05-27-048-12 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 12
Section: 27
County/Municipality: Yellowhead County
Well Name: WELTON BRAZR 5-27-48-12
Operator Name: Zargon Oil & Gas Ltd.
License Number: 0125867
License Date: 1987-02-17
License Status: Suspension
Spud Date: 1987-03-08
Final Drill Date: 1987-05-14
Well Total Depth: 3177.00 m
Surface Hole Latitude: 53.166499
Surface Hole Longitude: -115.678434

For data sources see[1][2]

Well History

Date Event
1987-02-17 Obtained License
1987-03-12 Surface Casing Operation Performed
1987-03-27 Direction Drilling Operation Performed - Deviate
1987-04-20 Well Log Performed
1987-04-21 Intermediate Casing Operation Performed
1987-04-21 Lost Circulation Occurred
1987-04-23 Well Log Performed
1987-04-25 Well Log Performed
1987-04-29 Drill Stem Test Performed
1987-05-02 Lost Circulation Occurred
1987-05-06 Lost Circulation Occurred
1987-05-14 Finished Drilling
1987-05-14 Well Log Performed
1987-05-14 Well Mode changed to Drilled and Cased
1987-05-15 Well Log Performed
1987-05-16 Well Log Performed
1987-05-18 Liner Casing Operation Performed
1987-05-20 Rig Released
1987-05-20 Well Log Performed
1987-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-06-13 Perforation Treatment Performed - Jet Perforation
1987-06-13 Well Log Performed
1987-06-14 Perforation Treatment Performed - Cement Squeeze
1987-06-20 Well Log Performed
1987-06-21 Perforation Treatment Performed - Jet Perforation
1987-06-21 Well Log Performed
1987-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-06-23 Perforation Treatment Performed - Cement Squeeze
1987-06-29 Perforation Treatment Performed - Jet Perforation
1987-07-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-07-02 Well Began Production
1987-07-02 Well Fluid changed to Crude Oil
1987-07-02 Well Mode changed to Flowing
1987-10-02 Perforation Treatment Performed - Jet Perforation
1987-10-02 Well Log Performed
1987-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-05-17 Well Log Performed
1989-10-20 Well Log Performed
1989-11-06 Well Log Performed
1989-11-08 Perforation Treatment Performed - Cement Squeeze
1989-11-19 Well Fluid changed to Crude Oil
1989-11-19 Well Mode changed to Pumping
1990-11-09 Well Log Performed
1990-11-15 Perforation Treatment Performed - Jet Perforation
1990-11-16 Well Log Performed
1990-11-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-05-15 Perforation Treatment Performed - Jet Perforation
1999-05-16 Perforation Treatment Performed - Jet Perforation
2002-01-27 Well Fluid changed to Crude Oil
2002-01-27 Well Mode changed to Closed
2004-04-07 Well Fluid changed to Crude Oil
2004-04-07 Well Mode changed to Pumping
2010-06-01 Well Fluid changed to Crude Oil
2010-06-01 Well Mode changed to Suspended
2010-12-01 Well Fluid changed to Crude Oil
2010-12-01 Well Mode changed to Pumping
2012-03-20 Well Fluid changed to Crude Oil
2012-03-20 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1987-03-27 2109.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-06-13 Perforation 1906.50 1907.50 13
1987-10-02 Perforation 3072.00 3078.00 13
1987-10-02 Perforation 3079.50 3084.00 13
1987-10-04 Acid Treatment 3072.00 3105.80 0
1989-11-08 Cement Squeeze 3072.00 3078.00 0
1990-11-15 Perforation 3101.00 3102.00 20
1990-11-15 Perforation 3103.00 3104.00 20
1990-11-15 Perforation 3105.00 3105.70 20
1990-11-15 Perforation 3107.00 3108.00 20
1990-11-15 Perforation 3109.00 3110.00 20
1990-11-15 Perforation 3111.00 3112.00 20
1987-06-13 Acid Treatment 1906.50 1907.50 0
1990-11-15 Perforation 3113.00 3114.00 20
1990-11-18 Acid Treatment 3101.00 3114.00 0
1999-05-15 Perforation 3085.00 3095.00 20
1999-05-15 Perforation 3073.00 3083.00 20
1999-05-16 Perforation 3060.00 3070.00 20
1999-05-16 Perforation 3050.00 3060.00 20
1987-06-14 Cement Squeeze 1906.50 1907.50 0
1987-06-21 Perforation 1380.00 1380.80 13
1987-06-22 Acid Treatment 1380.00 1380.80 0
1987-06-23 Cement Squeeze 1380.00 1380.80 0
1987-06-29 Perforation 3091.80 3105.80 13
1987-07-02 Acid Treatment 3091.80 3105.80 0
1987-10-02 Perforation 3086.00 3090.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 2665 0.0 0.0 0.0
1988 5188 0.0 0.0 0.0
1989 4497 0.0 0.0 0.0
1990 6358 0.0 0.0 0.0
1991 7321 0.0 0.0 0.0
1992 5379 0.0 0.0 0.0
1993 7123 0.0 0.0 0.0
1994 8168 0.0 0.0 0.0
1995 8605 0.0 0.0 0.0
1996 8475 0.0 0.0 0.0
1997 7491 0.0 0.0 0.0
1998 5625 0.0 0.0 0.0
1999 4663 0.0 0.0 0.0
2000 5759 0.0 0.0 0.0
2001 684 0.0 0.0 0.0
2004 6254 0.0 0.0 0.0
2005 8602 0.0 0.0 0.0
2006 3296 0.0 0.0 0.0
2007 8006 0.0 0.0 0.0
2008 8050 0.0 0.0 0.0
2009 5477 0.0 0.0 0.0
2010 384 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1987-04-21 Lost Circulation 3000.00 3000.00
1987-05-02 Lost Circulation 3057.00 3057.00
1987-05-06 Lost Circulation 3074.60 3074.60

For data sources see[7]

References