If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485122612000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.170243,"lon":-115.631734,"icon":""}]} |
Location: 00/12-26-048-12W5/0 | |
Location Alias: 00/12-26-48-12 W5M | |
Location Alias 2: 00/12-26-048-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 12 | |
Section: 26 | |
County/Municipality: Yellowhead County | |
Well Name: RIDGEBACK PEMBINA 12-26-48-12 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0468205 | |
License Date: 2014-07-18 | |
License Status: Issued | |
Spud Date: 2014-08-08 | |
Final Drill Date: 2014-08-24 | |
Well Total Depth: 3701.00 m | |
Surface Hole Latitude: 53.170243 | |
Surface Hole Longitude: -115.631734 |
Date | Event |
---|---|
2014-07-18 | Obtained License |
2014-08-10 | Surface Casing Operation Performed |
2014-08-11 | Direction Drilling Operation Performed - Deviate |
2014-08-18 | Direction Drilling Operation Performed - Horizontal |
2014-08-24 | Finished Drilling |
2014-08-24 | Well Log Performed |
2014-08-24 | Well Mode changed to Drilled and Cased |
2014-08-25 | Well Log Performed |
2014-08-26 | Production Casing Operation Performed |
2014-08-27 | Perforation Treatment Performed - Open-Hole Completion |
2014-08-27 | Rig Released |
2014-10-03 | Well Log Performed |
2014-10-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-10-15 | Well Began Production |
2014-10-15 | Well Fluid changed to Crude Oil |
2014-10-15 | Well Mode changed to Flowing |
2014-10-18 | Well Log Performed |
2014-11-26 | Well Fluid changed to Crude Oil |
2014-11-26 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-08-08 | Precision Drilling Corporation | 403 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-08-11 | 1598.00 | Deviate (5 - 79 degrees) |
2014-08-18 | 2121.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-08-27 | Open Hole/Barefoot Completion | 3695.00 | 3701.00 | 0 |
2014-10-13 | Multi-Stage Fracture | 3102.80 | 3102.90 | 0 |
2014-10-13 | Multi-Stage Fracture | 3057.80 | 3057.90 | 0 |
2014-10-13 | Multi-Stage Fracture | 2968.10 | 2968.20 | 0 |
2014-10-13 | Multi-Stage Fracture | 2906.60 | 2906.70 | 0 |
2014-10-13 | Multi-Stage Fracture | 2833.20 | 2833.30 | 0 |
2014-10-13 | Multi-Stage Fracture | 2759.00 | 2759.10 | 0 |
2014-10-13 | Multi-Stage Fracture | 2698.30 | 2698.40 | 0 |
2014-10-13 | Multi-Stage Fracture | 2637.00 | 2637.10 | 0 |
2014-10-13 | Multi-Stage Fracture | 2552.90 | 2553.00 | 0 |
2014-10-13 | Multi-Stage Fracture | 2480.50 | 2480.60 | 0 |
2014-10-13 | Multi-Stage Fracture | 3656.00 | 3656.10 | 0 |
2014-10-13 | Multi-Stage Fracture | 2395.00 | 2395.10 | 0 |
2014-10-13 | Multi-Stage Fracture | 2335.70 | 2335.80 | 0 |
2014-10-13 | Multi-Stage Fracture | 2274.70 | 2274.80 | 0 |
2014-10-13 | Multi-Stage Fracture | 2213.50 | 2213.60 | 0 |
2014-10-13 | Multi-Stage Fracture | 3588.30 | 3588.40 | 0 |
2014-10-13 | Multi-Stage Fracture | 3499.40 | 3499.50 | 0 |
2014-10-13 | Multi-Stage Fracture | 3455.20 | 3455.30 | 0 |
2014-10-13 | Multi-Stage Fracture | 3383.60 | 3383.70 | 0 |
2014-10-13 | Multi-Stage Fracture | 3308.50 | 3308.60 | 0 |
2014-10-13 | Multi-Stage Fracture | 3250.20 | 3250.30 | 0 |
2014-10-13 | Multi-Stage Fracture | 3175.40 | 3175.50 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-10-13 | 2014-10-13 | 1,974 | 3,588 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 83.4148 | N/A | |||
20/40 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 2.709 | N/A | ||
30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 4.7136 | N/A | ||
40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 4.8006 | N/A | ||
DWP-962 | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0139 | N/A | |
Water | 7732-18-5 | 100 | 0.0146 | N/A | ||||
DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.1913 | N/A | |
DWP-949 | Calfrac | Demulsifier | Ethoxylated alcohols | 8300 | 100 | 0.0876 | N/A | |
Ethoxylated phenolic resin | 8300 | 100 | 0.0897 | N/A | ||||
Isobutyl ketone | 8300 | 100 | 0.0878 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.1058 | N/A | ||||
Organic acid salts 1 | 8300 | 100 | 0.0876 | N/A | ||||
Organic acid salts 2 | 8300 | 100 | 0.0887 | N/A | ||||
Organic acid salts 3 | 8300 | 100 | 0.0897 | N/A | ||||
Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 7.0905 | N/A | |
DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.091 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-10-04 | 2014-10-06 | Surface Water - Runoff | 2155 |
2014-10-05 | 2014-10-06 | Recycled Fracturing Water (treated at well site) | 1422 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 1259 | 0.0 | 0.0 | 0.0 |
2015 | 8568 | 0.0 | 0.0 | 0.0 |
2016 | 8699 | 0.0 | 0.0 | 0.0 |
2017 | 8716 | 0.0 | 0.0 | 0.0 |
2018 | 8709 | 0.0 | 0.0 | 0.0 |
2019 | 8677 | 0.0 | 0.0 | 0.0 |
2020 | 2161 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-08-20 | No Incident Encountered | 0.00 | 0.00 |
2014-10-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]