X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485122305000

Well Details

Well ID: 0485122305000
Loading map...
Location: 00/05-23-048-12W5/0
Location Alias: 00/05-23-48-12 W5M
Location Alias 2: 00/05-23-048-12 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 12
Section: 23
County/Municipality: Yellowhead County
Well Name: RIDGEBACK HZ PEMBINA 5-23-48-12
Operator Name: Ridgeback Resources Inc.
License Number: 0494860
License Date: 2019-06-14
License Status: Amended
Spud Date: 2019-08-29
Final Drill Date: 2019-09-04
Well Total Depth: 4220.00 m
Surface Hole Latitude: 53.152652
Surface Hole Longitude: -115.622313

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-08-29 Horizon Drilling Inc. 39 Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2019-09-01 1665.20 Deviate (5 - 79 degrees)
2019-09-02 2145.90 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-09-07 Open Hole/Barefoot Completion 4216.00 4220.00 0
2019-09-19 Multi-Stage Fracture 3812.40 3812.50 0
2019-09-19 Multi-Stage Fracture 3772.90 3773.00 0
2019-09-19 Multi-Stage Fracture 3720.00 3720.10 0
2019-09-19 Multi-Stage Fracture 3670.00 3670.10 0
2019-09-19 Multi-Stage Fracture 3630.10 3630.20 0
2019-09-19 Multi-Stage Fracture 3576.90 3577.00 0
2019-09-19 Multi-Stage Fracture 3523.40 3523.50 0
2019-09-19 Multi-Stage Fracture 3481.10 3481.20 0
2019-09-19 Multi-Stage Fracture 3428.50 3428.60 0
2019-09-19 Multi-Stage Fracture 3386.50 3386.60 0
2019-09-18 Multi-Stage Fracture 4204.60 4204.70 0
2019-09-19 Multi-Stage Fracture 3330.90 3331.00 0
2019-09-19 Multi-Stage Fracture 3288.50 3288.60 0
2019-09-19 Multi-Stage Fracture 3246.40 3246.50 0
2019-09-19 Multi-Stage Fracture 3191.10 3191.20 0
2019-09-19 Multi-Stage Fracture 3149.20 3149.30 0
2019-09-19 Multi-Stage Fracture 3093.50 3093.60 0
2019-09-19 Multi-Stage Fracture 3052.70 3052.80 0
2019-09-19 Multi-Stage Fracture 2997.10 2997.20 0
2019-09-19 Multi-Stage Fracture 2955.00 2955.10 0
2019-09-19 Multi-Stage Fracture 2899.70 2899.80 0
2019-09-18 Multi-Stage Fracture 4157.40 4157.50 0
2019-09-19 Multi-Stage Fracture 2857.30 2857.40 0
2019-09-19 Multi-Stage Fracture 2801.60 2801.70 0
2019-09-19 Multi-Stage Fracture 2760.60 2760.70 0
2019-09-19 Multi-Stage Fracture 2706.60 2706.70 0
2019-09-19 Multi-Stage Fracture 2664.60 2664.70 0
2019-09-19 Multi-Stage Fracture 2610.40 2610.50 0
2019-09-19 Multi-Stage Fracture 2568.40 2568.50 0
2019-09-19 Multi-Stage Fracture 2514.30 2514.40 0
2019-09-19 Multi-Stage Fracture 2472.90 2473.00 0
2019-09-19 Multi-Stage Fracture 2430.70 2430.80 0
2019-09-18 Multi-Stage Fracture 4104.20 4104.30 0
2019-09-19 Multi-Stage Fracture 2375.30 2375.40 0
2019-09-19 Multi-Stage Fracture 2322.30 2322.40 0
2019-09-19 Multi-Stage Fracture 2282.90 2283.00 0
2019-09-19 Multi-Stage Fracture 2229.60 2229.70 0
2019-09-19 Multi-Stage Fracture 2189.30 2189.40 0
2019-09-19 Multi-Stage Fracture 2147.60 2147.70 0
2019-09-18 Multi-Stage Fracture 4050.70 4050.80 0
2019-09-18 Multi-Stage Fracture 4010.70 4010.80 0
2019-09-18 Multi-Stage Fracture 3957.40 3957.50 0
2019-09-18 Multi-Stage Fracture 3917.50 3917.60 0
2019-09-18 Multi-Stage Fracture 3865.10 3865.20 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-09-18 2019-09-19 1,988 6,306 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 94.9488 N/A
40/70 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 5.0511 N/A
ELECIDE - 2L Element Bactericide/Biocide 2-Dibromo. 3-Nitrilopropionamide 10222-01-2 100 0.0101 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0101 N/A
ELEBR-4 Element Breaker Ammonium persulfate 7727-54-0 100 0.0103 N/A
ELECC-1 Element Clay Control 2-Hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.0963 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0963 N/A
ELEHV-3 Element Friction Reducer Hydrotreated light paraffinic distillate 64742-55-8 100 0.0531 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0531 N/A
ELEFE-3 Element Surfactant Isopropyl alcohol 67-63-0 100 0.0963 N/A
Methanol 67-56-1 100 0.0963 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0963 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-09-17 2019-09-19 Surface Water - River 7007

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 1963 0.0 0.0 0.0
2020 2075 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-09-07 No Incident Encountered 0.00 0.00
2019-09-25 No Incident Encountered 0.00 0.00

For data sources see[9]

References