X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485121916000

Well Details

Well ID: 0485121916000
Loading map...
Location: 00/16-19-048-12W5/0
Location Alias: 00/16-19-48-12 W5M
Location Alias 2: 00/16-19-048-12 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 12
Section: 19
County/Municipality: Yellowhead County
Well Name: BACCALIEU HZ BRAZR 16-19-48-12
Operator Name: Baccalieu Energy Inc.
License Number: 0467163
License Date: 2014-06-09
License Status: Issued
Spud Date: 2014-06-25
Final Drill Date: 2014-07-08
Well Total Depth: 3491.00 m
Surface Hole Latitude: 53.147462
Surface Hole Longitude: -115.735312

For data sources see[1][2]

Well History

Date Event
2014-06-09 Obtained License
2014-06-26 Surface Casing Operation Performed
2014-06-29 Direction Drilling Operation Performed - Deviate
2014-06-30 Direction Drilling Operation Performed - Horizontal
2014-07-02 Intermediate Casing Operation Performed
2014-07-02 Well Log Performed
2014-07-08 Finished Drilling
2014-07-08 Well Log Performed
2014-07-08 Well Mode changed to Drilled and Cased
2014-07-10 Liner Casing Operation Performed
2014-07-10 Rig Released
2014-09-04 Perforation Treatment Performed - Multi-Stage Fracture
2014-09-06 Well Began Production
2014-09-06 Well Fluid changed to Crude Oil
2014-09-06 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-06-26 Ensign Drilling Inc. 544 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-06-29 1737.00 Deviate (5 - 79 degrees)
2014-06-30 2085.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-09-04 Multi-Stage Fracture 3459.90 3460.00 0
2014-09-04 Multi-Stage Fracture 2816.60 2816.70 0
2014-09-04 Multi-Stage Fracture 2742.50 2742.60 0
2014-09-04 Multi-Stage Fracture 2668.50 2668.60 0
2014-09-04 Multi-Stage Fracture 2594.40 2594.50 0
2014-09-04 Multi-Stage Fracture 2520.40 2520.50 0
2014-09-04 Multi-Stage Fracture 2446.70 2446.80 0
2014-09-04 Multi-Stage Fracture 2372.20 2372.30 0
2014-09-04 Multi-Stage Fracture 2299.50 2299.60 0
2014-09-04 Multi-Stage Fracture 2225.40 2225.50 0
2014-09-04 Multi-Stage Fracture 2151.30 2151.40 0
2014-09-04 Multi-Stage Fracture 3398.30 3398.40 0
2014-09-04 Multi-Stage Fracture 3324.30 3324.40 0
2014-09-04 Multi-Stage Fracture 3254.40 3254.50 0
2014-09-04 Multi-Stage Fracture 3182.00 3182.10 0
2014-09-04 Multi-Stage Fracture 3108.40 3108.50 0
2014-09-04 Multi-Stage Fracture 3036.20 3036.30 0
2014-09-04 Multi-Stage Fracture 2963.80 2963.90 0
2014-09-04 Multi-Stage Fracture 2890.60 2890.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-09-04 2014-09-04 1,964 2,668 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 83.0181 N/A
Sand (20/40) Ottawa Canyon Aluminum Oxide 1344-28-1 100 4.5016 N/A
Crystalline silica. quartz 14808-60-7 100 4.5016 N/A
Iron Oxide 1309-37-1 100 4.5016 N/A
Titanium Oxide 13463-67-7 100 4.5016 N/A
Sand (30/50) Canyon Aluminum Oxide 1344-28-1 100 7.717 N/A
Crystalline silica. quartz 14808-60-7 100 7.717 N/A
Iron Oxide 1309-37-1 100 7.717 N/A
Titanium Oxide 13463-67-7 100 7.7171 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0112 N/A
Water 7732-18-5 100 0.0112 N/A
CAN-1911 Clay Stabilizer Canyon Clay Control 1.6-Hexandiamine. dihydrochloride 6055-52-3 100 0.1814 N/A
Water 7732-18-5 100 0.1814 N/A
Nitrogen Gas Canyon Energizing Fluid Nitrogen 7727-37-9 100 4.3947 N/A
Non-hazardous base ingredient(s) Not Available 100 4.3947 N/A
CAN-2056 Gellant (G50 Microtox EC50) Canyon Gelling Agent Ammonium Chloride 12125-02-9 100 0.0948 N/A
Hydrotreated Kerosene 64742-47-8 100 0.0948 N/A
Water 7732-18-5 100 0.0948 N/A
CAN-2403 nanoFLO Canyon Surfactant Ethanol 64-17-5 100 0.0807 N/A
Methanol 67-56-1 100 0.0807 N/A
Terpenes and Terpenoids. sweet orange-oil 68647-72-3 100 0.0807 N/A
Water 7732-18-5 100 0.0807 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-07-16 2014-07-26 Groundwater - Non-saline less than or equal to 150m deep 1219
2014-07-16 2014-08-10 Groundwater - Non-saline less than or equal to 150m deep 972
2014-08-07 2014-08-08 Surface Water - River 476

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 2351 0.0 0.0 0.0
2015 8354 0.0 0.0 0.0
2016 8634 0.0 0.0 0.0
2017 8493 0.0 0.0 0.0
2018 8111 0.0 0.0 0.0
2019 8644 0.0 0.0 0.0
2020 2104 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-07-10 No Incident Encountered 0.00 0.00
2014-09-19 No Incident Encountered 0.00 0.00

For data sources see[10]

References