X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485121603003

Well Details

Well ID: 0485121603003
Loading map...
Location: 00/03-16-048-12W5/3
Location Alias: 00/03-16-48-12 W5M
Location Alias 2: 00/03-16-048-12 W5/03
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 12
Section: 16
County/Municipality: Yellowhead County
Well Name: CVE BRAZR 3-16-48-12
Operator Name: Cenovus Energy Inc.
License Number: 0411842
License Date: 2009-08-14
License Status: Issued
Spud Date: 2010-08-31
Final Drill Date: 2010-08-31
Well Total Depth: 3233.00 m
Surface Hole Latitude: 53.134272
Surface Hole Longitude: -115.704024

For data sources see[1][2]

Well History

Date Event
2009-08-14 Obtained License
2010-08-31 Finished Drilling
2010-08-31 Rig Released
2010-08-31 Well Mode changed to Drilled and Cased
2010-10-28 Perforation Treatment Performed - Jet Perforation
2010-10-30 Perforation Treatment Performed - Fractured
2010-11-07 Perforation Treatment Performed - Jet Perforation
2010-11-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-11-17 Perforation Treatment Performed - Jet Perforation
2010-11-17 Plug Back Performed
2010-11-25 Perforation Treatment Performed - Fractured
2010-11-25 Well Fluid changed to Gas
2010-11-25 Well Mode changed to Testing
2010-11-30 Well Fluid changed to Gas
2010-11-30 Well Mode changed to Test Completed
2010-12-23 Well Began Production
2010-12-23 Well Fluid changed to Gas
2010-12-23 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-10-28 Perforation 2505.00 2507.00 17
2010-10-28 Perforation 2525.50 2527.50 17
2010-10-30 Fracture 2505.00 2527.50 0
2010-11-07 Perforation 2317.00 2319.00 17
2010-11-07 Perforation 2331.00 2333.00 17
2010-11-17 Perforation 2317.00 2319.00 17
2010-11-17 Perforation 2331.00 2333.00 17
2010-11-17 Packing Device Capped w/Cement 2489.00 2497.00 0
2010-11-25 Fracture 2317.00 2333.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 215 0.0 0.0 0.0
2011 8270 0.0 0.0 0.0
2012 7882 0.0 0.0 0.0
2013 8194 0.0 0.0 0.0
2014 6772 0.0 0.0 0.0
2015 8381 0.0 0.0 0.0
2016 5958 0.0 0.0 0.0
2017 7756 0.0 0.0 0.0
2018 7050 0.0 0.0 0.0
2019 5928 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References