X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485112904000

Well Details

Well ID: 0485112904000
Loading map...
Location: 00/04-29-048-11W5/0
Location Alias: 00/04-29-48-11 W5M
Location Alias 2: 00/04-29-048-11 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 11
Section: 29
County/Municipality: Brazeau County
Well Name: VEI HZ PEMBINA 4-29-48-11
Operator Name: Vermilion Energy Inc.
License Number: 0486347
License Date: 2017-11-16
License Status: Issued
Spud Date: 2017-12-02
Final Drill Date: 2017-12-15
Well Total Depth: 3876.00 m
Surface Hole Latitude: 53.162202
Surface Hole Longitude: -115.565031

For data sources see[1][2]

Well History

Date Event
2017-11-16 Obtained License
2017-12-03 Surface Casing Operation Performed
2017-12-05 Direction Drilling Operation Performed - Deviate
2017-12-07 Direction Drilling Operation Performed - Horizontal
2017-12-15 Finished Drilling
2017-12-15 Well Log Performed
2017-12-15 Well Mode changed to Drilled and Cased
2017-12-16 Production Casing Operation Performed
2017-12-16 Well Log Performed
2017-12-17 Rig Released
2018-01-01 Well Log Performed
2018-01-06 Well Log Performed
2018-01-07 Perforation Treatment Performed - Open-Hole Completion
2018-01-08 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-09 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-18 Well Log Performed
2018-02-16 Well Began Production
2018-02-16 Well Fluid changed to Gas
2018-02-16 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-12-02 Ironhand Drilling Inc. 3 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-12-05 1282.00 Deviate (5 - 79 degrees)
2017-12-07 2526.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-01-07 Open Hole/Barefoot Completion 3871.00 3876.00 0
2018-01-08 Multi-Stage Fracture 3278.90 3279.00 0
2018-01-08 Multi-Stage Fracture 3210.30 3210.40 0
2018-01-08 Multi-Stage Fracture 3141.50 3141.60 0
2018-01-09 Multi-Stage Fracture 3072.80 3072.90 0
2018-01-09 Multi-Stage Fracture 2991.10 2991.20 0
2018-01-09 Multi-Stage Fracture 2922.50 2922.60 0
2018-01-09 Multi-Stage Fracture 2853.70 2853.80 0
2018-01-09 Multi-Stage Fracture 2786.20 2786.30 0
2018-01-09 Multi-Stage Fracture 2717.70 2717.80 0
2018-01-09 Multi-Stage Fracture 2648.90 2649.00 0
2018-01-08 Multi-Stage Fracture 3819.60 3819.70 0
2018-01-09 Multi-Stage Fracture 2606.80 2606.90 0
2018-01-08 Multi-Stage Fracture 3771.90 3772.00 0
2018-01-08 Multi-Stage Fracture 3690.00 3690.10 0
2018-01-08 Multi-Stage Fracture 3622.10 3622.20 0
2018-01-08 Multi-Stage Fracture 3553.20 3553.30 0
2018-01-08 Multi-Stage Fracture 3484.80 3484.90 0
2018-01-08 Multi-Stage Fracture 3416.50 3416.60 0
2018-01-08 Multi-Stage Fracture 3347.70 3347.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-01-08 2018-01-09 2,451 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water (Including Mix Water Supplied by Client)* Not Available 100 82.121 N/A
YF125Flex. N002 Schlumberger Quartz. Crystalline silica 14808-60-7 100 14.4794 N/A
YF125Flex. N002 Schlumberger Energizing Fluid 2-hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.046 N/A
Acetic acid 64-19-7 100 0.0017 N/A
Amines. dicoco alkylmethyl 61788-62-3 100 0 N/A
Diammonium peroxodisulphate 7727-54-0 100 0.0049 N/A
Dicoco dimethyl quaternary ammonium chloride 61789-77-3 100 0.0004 N/A
Glycerol 56-81-5 100 0.0183 N/A
Guar gum 9000-30-0 100 0.2471 N/A
Magnesium silicate hydrate (talc) 14807-96-6 100 0 N/A
Methanol 67-56-1 100 0.0072 N/A
N-Coco. 1.3-diaminopropane di-acetate 61791-64-8 100 0.0039 N/A
Nitrogen. liquid form 7727-37-9 100 3.769 N/A
Non-crystalline silica (impurity) 7631-86-9 100 0.0006 N/A
poly(tetrafluoroethylene) 9002-84-0 100 0 N/A
Polyethylene glycol monohexyl ether 31726-34-8 100 0.0051 N/A
Potassium borate 1332-77-0 100 0.0564 N/A
Potassium hydroxide 1310-58-3 100 0.0208 N/A
Propan-2-ol 67-63-0 100 0 N/A
Vinylidene chloride/methylacrylate copolymer 25038-72-6 100 0.001 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-12-24 2018-01-09 Groundwater - Non-saline less than or equal to 150m deep 3645

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 6885 0.0 0.0 0.0
2019 8497 0.0 0.0 0.0
2020 2152 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-12-17 No Incident Encountered 0.00 0.00
2018-01-24 No Incident Encountered 0.00 0.00

For data sources see[10]

References