X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485111914000

Well Details

Well ID: 0485111914000
Loading map...
Location: 00/14-19-048-11W5/0
Location Alias: 00/14-19-48-11 W5M
Location Alias 2: 00/14-19-048-11 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 11
Section: 19
County/Municipality: Yellowhead County
Well Name: RIDGEBACK HZ PEMBINA 14-19-48-11
Operator Name: Ridgeback Resources Inc.
License Number: 0491019
License Date: 2018-09-20
License Status: Issued
Spud Date: 2018-11-08
Final Drill Date: 2018-11-18
Well Total Depth: 4502.00 m
Surface Hole Latitude: 53.159827
Surface Hole Longitude: -115.639590

For data sources see[1][2]

Well History

Date Event
2018-09-20 Obtained License
2018-11-09 Surface Casing Operation Performed
2018-11-10 Direction Drilling Operation Performed - Deviate
2018-11-12 Direction Drilling Operation Performed - Horizontal
2018-11-12 Well Log Performed
2018-11-17 Well Log Performed
2018-11-18 Finished Drilling
2018-11-18 Well Log Performed
2018-11-18 Well Mode changed to Drilled and Cased
2018-11-19 Perforation Treatment Performed - Open-Hole Completion
2018-11-19 Production Casing Operation Performed
2018-11-19 Rig Released
2019-08-10 Perforation Treatment Performed - Multi-Stage Fracture
2019-08-11 Perforation Treatment Performed - Multi-Stage Fracture
2019-08-12 Perforation Treatment Performed - Multi-Stage Fracture
2019-08-25 Well Began Production
2019-08-25 Well Fluid changed to Crude Oil
2019-08-25 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-11-08 Nabors Drilling Canada Limited 15 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-11-10 1468.10 Deviate (5 - 79 degrees)
2018-11-12 2141.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-11-19 Open Hole/Barefoot Completion 4491.00 4502.00 0
2019-08-10 Multi-Stage Fracture 4097.00 4097.10 0
2019-08-10 Multi-Stage Fracture 4056.00 4056.10 0
2019-08-10 Multi-Stage Fracture 4015.00 4015.10 0
2019-08-10 Multi-Stage Fracture 3974.00 3974.10 0
2019-08-10 Multi-Stage Fracture 3933.00 3933.10 0
2019-08-10 Multi-Stage Fracture 3892.00 3892.10 0
2019-08-11 Multi-Stage Fracture 3851.00 3851.10 0
2019-08-11 Multi-Stage Fracture 3810.00 3810.10 0
2019-08-11 Multi-Stage Fracture 3769.00 3769.10 0
2019-08-11 Multi-Stage Fracture 3728.00 3728.10 0
2019-08-10 Multi-Stage Fracture 4425.00 4425.10 0
2019-08-11 Multi-Stage Fracture 3687.00 3687.10 0
2019-08-11 Multi-Stage Fracture 3646.00 3646.10 0
2019-08-11 Multi-Stage Fracture 3605.00 3605.10 0
2019-08-11 Multi-Stage Fracture 3564.00 3564.10 0
2019-08-11 Multi-Stage Fracture 3523.00 3523.10 0
2019-08-11 Multi-Stage Fracture 3482.00 3482.10 0
2019-08-11 Multi-Stage Fracture 3441.00 3441.10 0
2019-08-11 Multi-Stage Fracture 3400.00 3400.10 0
2019-08-11 Multi-Stage Fracture 3359.00 3359.10 0
2019-08-11 Multi-Stage Fracture 3318.00 3318.10 0
2019-08-10 Multi-Stage Fracture 4384.00 4384.10 0
2019-08-11 Multi-Stage Fracture 3277.00 3277.10 0
2019-08-11 Multi-Stage Fracture 3236.00 3236.10 0
2019-08-11 Multi-Stage Fracture 3195.00 3195.10 0
2019-08-11 Multi-Stage Fracture 3154.00 3154.10 0
2019-08-11 Multi-Stage Fracture 3113.00 3113.10 0
2019-08-11 Multi-Stage Fracture 3072.00 3072.10 0
2019-08-11 Multi-Stage Fracture 3031.00 3031.10 0
2019-08-11 Multi-Stage Fracture 2990.00 2990.10 0
2019-08-12 Multi-Stage Fracture 2949.00 2949.10 0
2019-08-12 Multi-Stage Fracture 2908.00 2908.10 0
2019-08-10 Multi-Stage Fracture 4343.00 4343.10 0
2019-08-12 Multi-Stage Fracture 2867.00 2867.10 0
2019-08-12 Multi-Stage Fracture 2826.00 2826.10 0
2019-08-12 Multi-Stage Fracture 2785.00 2785.10 0
2019-08-12 Multi-Stage Fracture 2744.00 2744.10 0
2019-08-12 Multi-Stage Fracture 2703.00 2703.10 0
2019-08-12 Multi-Stage Fracture 2662.00 2662.10 0
2019-08-12 Multi-Stage Fracture 2621.00 2621.10 0
2019-08-12 Multi-Stage Fracture 2580.00 2580.10 0
2019-08-12 Multi-Stage Fracture 2539.00 2539.10 0
2019-08-12 Multi-Stage Fracture 2498.00 2498.10 0
2019-08-10 Multi-Stage Fracture 4302.00 4302.10 0
2019-08-12 Multi-Stage Fracture 2457.00 2457.10 0
2019-08-12 Multi-Stage Fracture 2416.00 2416.10 0
2019-08-12 Multi-Stage Fracture 2375.00 2375.10 0
2019-08-12 Multi-Stage Fracture 2334.00 2334.10 0
2019-08-12 Multi-Stage Fracture 2293.00 2293.10 0
2019-08-12 Multi-Stage Fracture 2252.00 2252.10 0
2019-08-12 Multi-Stage Fracture 2211.00 2211.10 0
2019-08-10 Multi-Stage Fracture 4261.00 4261.10 0
2019-08-10 Multi-Stage Fracture 4220.00 4220.10 0
2019-08-10 Multi-Stage Fracture 4179.00 4179.10 0
2019-08-10 Multi-Stage Fracture 4138.00 4138.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-08-10 2019-08-12 1,947 9,341 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric Acid 7647-01-0 100 0.6132 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.6108 N/A
Water 7732-18-5 100 95.4829 N/A
40/70 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 4.517 N/A
ELECIDE - 2L Element Bactericide/Biocide 2-Dibromo. 3-Nitrilopropionamide 10222-01-2 100 0.0097 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0097 N/A
ELEBR-4 Element Breaker Ammonium persulfate 7727-54-0 100 0.0086 N/A
ELECC-1 Element Clay Control 2-Hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.0926 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0926 N/A
ELEHV-3 Element Friction Reducer Hydrotreated light paraffinic distillate 64742-55-8 100 0.1196 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.1196 N/A
ELEFE-3 Element Surfactant Isopropyl alcohol 67-63-0 100 0.092 N/A
Methanol 67-56-1 100 0.092 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.092 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-08-10 2019-08-12 Surface Water - River 9559
2019-08-10 2019-08-10 Central Water Distribution Facility 59

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 3150 0.0 0.0 0.0
2020 2122 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-11-19 No Incident Encountered 0.00 0.00
2019-08-15 No Incident Encountered 0.00 0.00

For data sources see[10]

References