X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485111112000

Well Details

Well ID: 0485111112000
Loading map...
Location: 00/12-11-048-11W5/0
Location Alias: 00/12-11-48-11 W5M
Location Alias 2: 00/12-11-048-11 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 11
Section: 11
County/Municipality: Brazeau County
Well Name: DAYLIGHT HZ PEMBINA 12-11-48-11
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0423203
License Date: 2010-09-03
License Status: Issued
Spud Date: 2010-10-05
Final Drill Date: 2010-10-28
Well Total Depth: 3292.00 m
Surface Hole Latitude: 53.128886
Surface Hole Longitude: -115.486939

For data sources see[1][2]

Well History

Date Event
2010-09-03 Obtained License
2010-10-08 Surface Casing Operation Performed
2010-10-10 Well Log Performed
2010-10-11 Direction Drilling Operation Performed - Horizontal
2010-10-13 Well Log Performed
2010-10-15 Well Log Performed
2010-10-20 Intermediate Casing Operation Performed
2010-10-28 Finished Drilling
2010-10-28 Well Log Performed
2010-10-28 Well Mode changed to Drilled and Cased
2010-11-02 Liner Casing Operation Performed
2010-11-03 Rig Released
2010-11-13 Well Log Performed
2010-11-22 Perforation Treatment Performed - Multi-Stage Fracture
2010-12-01 Well Began Production
2010-12-01 Well Fluid changed to Crude Oil
2010-12-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-10-11 1550.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-11-22 Multi-Stage Fracture 3266.60 3266.70 0
2010-11-22 Multi-Stage Fracture 2597.50 2597.60 0
2010-11-22 Multi-Stage Fracture 2518.90 2519.00 0
2010-11-22 Multi-Stage Fracture 2453.00 2453.10 0
2010-11-22 Multi-Stage Fracture 2374.60 2374.70 0
2010-11-22 Multi-Stage Fracture 2302.30 2302.40 0
2010-11-22 Multi-Stage Fracture 2233.40 2233.50 0
2010-11-22 Multi-Stage Fracture 2164.10 2164.20 0
2010-11-22 Multi-Stage Fracture 2082.10 2082.20 0
2010-11-22 Multi-Stage Fracture 2003.00 2003.10 0
2010-11-22 Multi-Stage Fracture 3179.50 3179.60 0
2010-11-22 Multi-Stage Fracture 3097.50 3097.60 0
2010-11-22 Multi-Stage Fracture 3030.80 3030.90 0
2010-11-22 Multi-Stage Fracture 2961.40 2961.50 0
2010-11-22 Multi-Stage Fracture 2882.30 2882.40 0
2010-11-22 Multi-Stage Fracture 2825.80 2825.90 0
2010-11-22 Multi-Stage Fracture 2746.30 2746.40 0
2010-11-22 Multi-Stage Fracture 2677.30 2677.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 633 0.0 0.0 0.0
2011 8229 0.0 0.0 0.0
2012 7510 0.0 0.0 0.0
2013 8449 0.0 0.0 0.0
2014 8007 0.0 0.0 0.0
2015 7681 0.0 0.0 0.0
2016 8664 0.0 0.0 0.0
2017 8513 0.0 0.0 0.0
2018 7961 0.0 0.0 0.0
2019 8689 0.0 0.0 0.0
2020 2147 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-11-22 No Incident Encountered 0.00 0.00

For data sources see[7]

References