If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485093106030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.187933,"lon":-115.299887,"icon":""}]} |
Location: 03/06-31-048-09W5/0 | |
Location Alias: 03/06-31-48-09 W5M | |
Location Alias 2: 03/06-31-048-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 09 | |
Section: 31 | |
County/Municipality: Brazeau County | |
Well Name: DAYLIGHT PEMBINA 6-31-48-9 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0337904 | |
License Date: 2005-09-09 | |
License Status: Abandoned | |
Spud Date: 2005-09-27 | |
Final Drill Date: 2005-11-05 | |
Well Total Depth: 2983.00 m | |
Surface Hole Latitude: 53.187933 | |
Surface Hole Longitude: -115.299887 |
Date | Event |
---|---|
2005-09-09 | Obtained License |
2005-10-02 | Surface Casing Operation Performed |
2005-10-05 | Direction Drilling Operation Performed - Deviate |
2005-10-31 | Well Log Performed |
2005-11-01 | Intermediate Casing Operation Performed |
2005-11-05 | Finished Drilling |
2005-11-05 | Perforation Treatment Performed - Open-Hole Completion |
2005-11-05 | Well Log Performed |
2005-11-05 | Well Mode changed to Drilled and Cased |
2005-11-06 | Perforation Treatment Performed - Cement Plug |
2005-11-06 | Plug Back Performed |
2005-11-06 | Well Log Performed |
2005-11-06 | Well Mode changed to Abandoned Zone |
2005-11-07 | Rig Released |
2013-09-16 | Well Log Performed |
2013-09-17 | Well Log Performed |
2013-09-18 | Perforation Treatment Performed - Jet Perforation |
2013-09-18 | Well Log Performed |
2013-09-19 | Perforation Treatment Performed - Remedial Casing |
2013-09-20 | Well Log Performed |
2013-09-21 | Well Log Performed |
2013-09-28 | Well Log Performed |
2013-09-29 | Well Log Performed |
2013-09-30 | Perforation Treatment Performed - Jet Perforation |
2013-09-30 | Well Log Performed |
2013-10-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2013-10-01 | Perforation Treatment Performed - Remedial Casing |
2013-10-03 | Well Log Performed |
2013-10-04 | Perforation Treatment Performed - Jet Perforation |
2013-10-04 | Well Log Performed |
2013-10-05 | Perforation Treatment Performed - Remedial Casing |
2013-10-13 | Well Log Performed |
2013-10-15 | Perforation Treatment Performed - Jet Perforation |
2013-10-15 | Well Log Performed |
2013-10-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2013-10-16 | Perforation Treatment Performed - Remedial Casing |
2013-10-18 | Perforation Treatment Performed - Jet Perforation |
2013-10-18 | Well Log Performed |
2013-10-19 | Perforation Treatment Performed - Remedial Casing |
2013-10-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2013-10-22 | Perforation Treatment Performed - Jet Perforation |
2013-10-22 | Well Log Performed |
2013-10-23 | Perforation Treatment Performed - Remedial Casing |
2013-11-01 | Perforation Treatment Performed - Jet Perforation |
2013-11-01 | Well Log Performed |
2013-11-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2013-11-02 | Perforation Treatment Performed - Remedial Casing |
2013-11-04 | Well Log Performed |
2013-11-05 | Well Log Performed |
2013-11-16 | Perforation Treatment Performed - Jet Perforation |
2013-11-16 | Well Log Performed |
2013-11-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2013-11-17 | Perforation Treatment Performed - Remedial Casing |
2013-11-21 | Well Abandoned |
2013-11-21 | Well Mode changed to Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2005-10-05 | 714.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-11-05 | Open Hole/Barefoot Completion | 2866.90 | 2983.00 | 0 |
2013-10-15 | Perforation | 864.00 | 865.00 | 20 |
2013-10-16 | Remedial Casing Cementing | 864.00 | 865.00 | 0 |
2013-10-16 | Packing Device Capped w/Cement | 848.40 | 859.00 | 0 |
2013-10-18 | Perforation | 734.00 | 735.00 | 21 |
2013-10-19 | Remedial Casing Cementing | 734.00 | 735.00 | 0 |
2013-10-22 | Packing Device Capped w/Cement | 721.00 | 729.00 | 0 |
2013-10-22 | Perforation | 625.50 | 627.50 | 34 |
2013-10-23 | Remedial Casing Cementing | 625.50 | 627.50 | 0 |
2013-11-01 | Perforation | 625.50 | 626.50 | 21 |
2013-11-02 | Acid Treatment | 625.50 | 626.50 | 0 |
2005-11-06 | Cement Plug | 2841.00 | 2983.00 | 0 |
2013-11-02 | Remedial Casing Cementing | 625.50 | 626.50 | 0 |
2013-11-16 | Perforation | 89.00 | 90.00 | 21 |
2013-11-17 | Remedial Casing Cementing | 89.00 | 90.00 | 0 |
2013-11-17 | Packing Device Capped w/Cement | 72.00 | 84.00 | 0 |
2013-09-18 | Perforation | 698.00 | 700.00 | 20 |
2013-09-19 | Remedial Casing Cementing | 698.00 | 700.00 | 0 |
2013-09-30 | Perforation | 1083.00 | 1085.00 | 20 |
2013-10-01 | Remedial Casing Cementing | 1083.00 | 1085.00 | 0 |
2013-10-01 | Packing Device Capped w/Cement | 1070.00 | 1078.00 | 0 |
2013-10-04 | Perforation | 625.50 | 627.50 | 20 |
2013-10-05 | Remedial Casing Cementing | 625.50 | 627.50 | 0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-11-21 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]