If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485090602020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.106626,"lon":-115.296612,"icon":""}]} |
Location: 02/02-06-048-09W5/0 | |
Location Alias: 02/02-06-48-09 W5M | |
Location Alias 2: 02/02-06-048-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 09 | |
Section: 06 | |
County/Municipality: Brazeau County | |
Well Name: DAYLIGHT PEMBINA 2-6-48-9 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0315717 | |
License Date: 2004-10-01 | |
License Status: Abandoned | |
Spud Date: 2004-11-01 | |
Final Drill Date: 2004-11-29 | |
Well Total Depth: 2895.00 m | |
Surface Hole Latitude: 53.106626 | |
Surface Hole Longitude: -115.296612 |
Date | Event |
---|---|
2004-10-01 | Obtained License |
2004-11-04 | Surface Casing Operation Performed |
2004-11-24 | Well Log Performed |
2004-11-25 | Intermediate Casing Operation Performed |
2004-11-29 | Finished Drilling |
2004-11-29 | Well Log Performed |
2004-11-29 | Well Mode changed to Drilled and Cased |
2004-11-30 | Liner Casing Operation Performed |
2004-12-01 | Rig Released |
2004-12-11 | Well Log Performed |
2004-12-13 | Perforation Treatment Performed - Jet Perforation |
2004-12-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2005-09-01 | Well Began Production |
2005-09-01 | Well Fluid changed to Crude Oil |
2005-09-01 | Well Mode changed to Flowing |
2006-11-02 | Perforation Treatment Performed - Cement Squeeze |
2006-11-05 | Well Log Performed |
2006-11-06 | Perforation Treatment Performed - Jet Perforation |
2006-11-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2006-11-08 | Well Log Performed |
2006-12-22 | Well Began Injection |
2006-12-22 | Well Fluid changed to Water |
2006-12-22 | Well Type changed to Injection |
2009-05-27 | Well Log Performed |
2009-05-28 | Well Log Performed |
2009-05-31 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-05-31 | Plug Back Performed |
2009-05-31 | Well Fluid changed to Water |
2009-05-31 | Well Mode changed to Abandoned and Whipstocked |
2009-05-31 | Well Type changed to Injection |
2009-06-03 | Well Log Performed |
2019-10-21 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2004-12-13 | Perforation | 2813.50 | 2818.00 | 17 |
2004-12-15 | Acid Treatment | 2813.50 | 2818.00 | 0 |
2006-11-02 | Cement Squeeze | 2813.50 | 2818.00 | 0 |
2006-11-06 | Perforation | 2828.00 | 2833.50 | 17 |
2006-11-07 | Acid Treatment | 2828.00 | 2833.50 | 0 |
2009-05-31 | Packing Device Capped w/Cement | 2623.30 | 2813.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 2482 | 0.0 | 0.0 | 0.0 |
2006 | 4636 | 0.0 | 0.0 | 0.0 |
2007 | 0 | 0.0 | 0.0 | 0.0 |
2008 | 0 | 0.0 | 0.0 | 0.0 |
2009 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]