If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485083309020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.182975,"lon":-115.126583,"icon":""}]} |
Location: 02/09-33-048-08W5/0 | |
Location Alias: 02/09-33-48-08 W5M | |
Location Alias 2: 02/09-33-048-08 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 08 | |
Section: 33 | |
County/Municipality: Brazeau County | |
Well Name: INPLAY OIL HZ 102 PEMBINA 9-33-48-8 | |
Operator Name: InPlay Oil Corp. | |
License Number: 0481476 | |
License Date: 2016-11-16 | |
License Status: Issued | |
Spud Date: 2016-12-19 | |
Final Drill Date: 2016-12-31 | |
Well Total Depth: 3242.00 m | |
Surface Hole Latitude: 53.182975 | |
Surface Hole Longitude: -115.126583 |
Date | Event |
---|---|
2016-11-16 | Obtained License |
2016-12-20 | Surface Casing Operation Performed |
2016-12-27 | Direction Drilling Operation Performed - Deviate |
2016-12-29 | Direction Drilling Operation Performed - Horizontal |
2016-12-31 | Finished Drilling |
2016-12-31 | Well Log Performed |
2016-12-31 | Well Mode changed to Drilled and Cased |
2017-01-01 | Production Casing Operation Performed |
2017-01-02 | Rig Released |
2017-01-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-01-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-02-11 | Well Began Production |
2017-02-11 | Well Fluid changed to Crude Oil |
2017-02-11 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2016-12-19 | Bonanza Drilling Inc. | 6 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2016-12-27 | 562.00 | Deviate (5 - 79 degrees) |
2016-12-29 | 1776.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-01-26 | Multi-Stage Fracture | 3212.80 | 3213.00 | 0 |
2017-01-26 | Multi-Stage Fracture | 2834.60 | 2834.80 | 0 |
2017-01-27 | Multi-Stage Fracture | 2792.50 | 2792.70 | 0 |
2017-01-27 | Multi-Stage Fracture | 2750.40 | 2750.60 | 0 |
2017-01-27 | Multi-Stage Fracture | 2708.20 | 2708.40 | 0 |
2017-01-27 | Multi-Stage Fracture | 2666.20 | 2666.40 | 0 |
2017-01-27 | Multi-Stage Fracture | 2624.10 | 2624.30 | 0 |
2017-01-27 | Multi-Stage Fracture | 2582.00 | 2582.20 | 0 |
2017-01-27 | Multi-Stage Fracture | 2539.90 | 2540.10 | 0 |
2017-01-27 | Multi-Stage Fracture | 2497.80 | 2498.00 | 0 |
2017-01-27 | Multi-Stage Fracture | 2455.80 | 2456.00 | 0 |
2017-01-26 | Multi-Stage Fracture | 3171.40 | 3171.60 | 0 |
2017-01-27 | Multi-Stage Fracture | 2413.80 | 2414.00 | 0 |
2017-01-27 | Multi-Stage Fracture | 2385.50 | 2385.70 | 0 |
2017-01-27 | Multi-Stage Fracture | 2354.70 | 2354.90 | 0 |
2017-01-27 | Multi-Stage Fracture | 2323.90 | 2324.10 | 0 |
2017-01-27 | Multi-Stage Fracture | 2281.80 | 2282.00 | 0 |
2017-01-27 | Multi-Stage Fracture | 2239.80 | 2240.00 | 0 |
2017-01-27 | Multi-Stage Fracture | 2198.00 | 2198.20 | 0 |
2017-01-27 | Multi-Stage Fracture | 2156.00 | 2156.20 | 0 |
2017-01-27 | Multi-Stage Fracture | 2114.00 | 2114.20 | 0 |
2017-01-27 | Multi-Stage Fracture | 2072.00 | 2072.20 | 0 |
2017-01-26 | Multi-Stage Fracture | 3128.70 | 3128.90 | 0 |
2017-01-27 | Multi-Stage Fracture | 2030.00 | 2030.20 | 0 |
2017-01-27 | Multi-Stage Fracture | 1988.00 | 1988.20 | 0 |
2017-01-27 | Multi-Stage Fracture | 1946.00 | 1946.20 | 0 |
2017-01-27 | Multi-Stage Fracture | 1903.90 | 1904.10 | 0 |
2017-01-27 | Multi-Stage Fracture | 1861.70 | 1861.90 | 0 |
2017-01-26 | Multi-Stage Fracture | 3086.70 | 3086.90 | 0 |
2017-01-26 | Multi-Stage Fracture | 3044.80 | 3045.00 | 0 |
2017-01-26 | Multi-Stage Fracture | 3000.90 | 3001.10 | 0 |
2017-01-26 | Multi-Stage Fracture | 2960.90 | 2961.00 | 0 |
2017-01-26 | Multi-Stage Fracture | 2918.90 | 2919.10 | 0 |
2017-01-26 | Multi-Stage Fracture | 2876.80 | 2877.00 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-01-26 | 2017-01-27 | 1,545 | 2,977 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 83.7491 | N/A | |||
Sand - Tier 2 (20/40) | Trican | silica crystalline | 14808-60-7 | 100 | 16.0127 | N/A | ||
AQUCAR DB20 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0099 | N/A | |
2-mercaptoethanol | 60-24-2 | 100 | 0.0099 | N/A | ||||
dibromoacetonitrile | 3252-43-5 | 100 | 0.0099 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0099 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0099 | N/A | ||||
CC-8 | Trican | Clay Control | choline chloride | 67-48-1 | 100 | 0.1566 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.1566 | N/A | ||||
DF-2W | Trican | Defoamer | non-hazardous ingredients | Not Available | 100 | 0.0043 | N/A | |
propylene glycol | 57-55-6 | 100 | 0.0043 | N/A | ||||
GFR-5D | Trican | Friction Reducer | anionic polyacrylamide | Not Available | 100 | 0.0251 | N/A | |
S-17W | Trican | Surfactant | ethylene/propylene oxide polymer | Not Available | 100 | 0.042 | N/A | |
methanol | 67-56-1 | 100 | 0.042 | N/A | ||||
water | Not Available | 100 | 0.042 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-01-19 | 2017-01-26 | Surface Water - Runoff | 3091 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 7759 | 0.0 | 0.0 | 0.0 |
2018 | 8551 | 0.0 | 0.0 | 0.0 |
2019 | 8747 | 0.0 | 0.0 | 0.0 |
2020 | 2055 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-01-02 | No Incident Encountered | 0.00 | 0.00 |
2017-01-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]