If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485083308040 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.182974,"lon":-115.126284,"icon":""}]} |
Location: 04/08-33-048-08W5/0 | |
Location Alias: 04/08-33-48-08 W5M | |
Location Alias 2: 04/08-33-048-08 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 08 | |
Section: 33 | |
County/Municipality: Brazeau County | |
Well Name: INPLAY OIL HZ 104 PEMBINA 8-33-48-8 | |
Operator Name: InPlay Oil Corp. | |
License Number: 0481475 | |
License Date: 2016-11-16 | |
License Status: Issued | |
Spud Date: 2016-12-11 | |
Final Drill Date: 2016-12-18 | |
Well Total Depth: 3153.00 m | |
Surface Hole Latitude: 53.182974 | |
Surface Hole Longitude: -115.126284 |
Date | Event |
---|---|
2016-11-16 | Obtained License |
2016-12-13 | Surface Casing Operation Performed |
2016-12-14 | Direction Drilling Operation Performed - Deviate |
2016-12-15 | Direction Drilling Operation Performed - Horizontal |
2016-12-18 | Finished Drilling |
2016-12-18 | Well Log Performed |
2016-12-18 | Well Mode changed to Drilled and Cased |
2016-12-19 | Production Casing Operation Performed |
2016-12-19 | Rig Released |
2017-01-12 | Well Log Performed |
2017-01-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-01-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-02-11 | Well Began Production |
2017-02-11 | Well Fluid changed to Crude Oil |
2017-02-11 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2016-12-12 | Bonanza Drilling Inc. | 6 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2016-12-14 | 1217.00 | Deviate (5 - 79 degrees) |
2016-12-15 | 1693.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-01-24 | Multi-Stage Fracture | 3123.80 | 3124.00 | 0 |
2017-01-24 | Multi-Stage Fracture | 2861.60 | 2861.80 | 0 |
2017-01-24 | Multi-Stage Fracture | 2833.30 | 2833.50 | 0 |
2017-01-24 | Multi-Stage Fracture | 2805.10 | 2805.30 | 0 |
2017-01-24 | Multi-Stage Fracture | 2776.80 | 2777.00 | 0 |
2017-01-24 | Multi-Stage Fracture | 2748.60 | 2748.80 | 0 |
2017-01-24 | Multi-Stage Fracture | 2720.40 | 2720.60 | 0 |
2017-01-24 | Multi-Stage Fracture | 2692.10 | 2692.30 | 0 |
2017-01-24 | Multi-Stage Fracture | 2663.90 | 2664.10 | 0 |
2017-01-24 | Multi-Stage Fracture | 2635.60 | 2635.80 | 0 |
2017-01-24 | Multi-Stage Fracture | 2607.60 | 2607.80 | 0 |
2017-01-24 | Multi-Stage Fracture | 3092.90 | 3093.10 | 0 |
2017-01-24 | Multi-Stage Fracture | 2579.30 | 2579.50 | 0 |
2017-01-24 | Multi-Stage Fracture | 2551.10 | 2551.30 | 0 |
2017-01-24 | Multi-Stage Fracture | 2522.80 | 2523.00 | 0 |
2017-01-25 | Multi-Stage Fracture | 2494.60 | 2494.80 | 0 |
2017-01-25 | Multi-Stage Fracture | 2468.80 | 2469.00 | 0 |
2017-01-25 | Multi-Stage Fracture | 2439.90 | 2440.10 | 0 |
2017-01-25 | Multi-Stage Fracture | 2411.70 | 2411.90 | 0 |
2017-01-25 | Multi-Stage Fracture | 2383.40 | 2383.60 | 0 |
2017-01-25 | Multi-Stage Fracture | 2355.80 | 2356.00 | 0 |
2017-01-25 | Multi-Stage Fracture | 2326.90 | 2327.10 | 0 |
2017-01-24 | Multi-Stage Fracture | 3061.90 | 3062.10 | 0 |
2017-01-25 | Multi-Stage Fracture | 2298.70 | 2298.90 | 0 |
2017-01-25 | Multi-Stage Fracture | 2270.40 | 2270.60 | 0 |
2017-01-25 | Multi-Stage Fracture | 2242.70 | 2242.90 | 0 |
2017-01-25 | Multi-Stage Fracture | 2214.50 | 2214.70 | 0 |
2017-01-25 | Multi-Stage Fracture | 2186.20 | 2186.40 | 0 |
2017-01-25 | Multi-Stage Fracture | 2157.90 | 2158.10 | 0 |
2017-01-25 | Multi-Stage Fracture | 2130.30 | 2130.50 | 0 |
2017-01-25 | Multi-Stage Fracture | 2102.00 | 2102.20 | 0 |
2017-01-25 | Multi-Stage Fracture | 2073.80 | 2074.00 | 0 |
2017-01-25 | Multi-Stage Fracture | 2045.70 | 2045.90 | 0 |
2017-01-24 | Multi-Stage Fracture | 3031.00 | 3031.20 | 0 |
2017-01-25 | Multi-Stage Fracture | 2017.40 | 2017.60 | 0 |
2017-01-25 | Multi-Stage Fracture | 1989.20 | 1989.40 | 0 |
2017-01-25 | Multi-Stage Fracture | 1960.90 | 1961.10 | 0 |
2017-01-25 | Multi-Stage Fracture | 1932.70 | 1932.90 | 0 |
2017-01-25 | Multi-Stage Fracture | 1904.40 | 1904.60 | 0 |
2017-01-25 | Multi-Stage Fracture | 1876.10 | 1876.30 | 0 |
2017-01-25 | Multi-Stage Fracture | 1847.90 | 1848.10 | 0 |
2017-01-25 | Multi-Stage Fracture | 1819.60 | 1819.80 | 0 |
2017-01-24 | Multi-Stage Fracture | 3002.80 | 3003.00 | 0 |
2017-01-24 | Multi-Stage Fracture | 2974.50 | 2974.70 | 0 |
2017-01-24 | Multi-Stage Fracture | 2946.30 | 2946.50 | 0 |
2017-01-24 | Multi-Stage Fracture | 2918.20 | 2918.40 | 0 |
2017-01-24 | Multi-Stage Fracture | 2890.60 | 2890.80 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-01-24 | 2017-01-25 | 1,548 | 4,433 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 85.6904 | N/A | |||
Sand - Tier 2 (20/40) | Trican | silica crystalline | 14808-60-7 | 100 | 14.0659 | N/A | ||
AQUCAR DB20 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0101 | N/A | |
2-mercaptoethanol | 60-24-2 | 100 | 0.0101 | N/A | ||||
dibromoacetonitrile | 3252-43-5 | 100 | 0.0102 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0101 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0101 | N/A | ||||
CC-8 | Trican | Clay Control | choline chloride | 67-48-1 | 100 | 0.1602 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.1602 | N/A | ||||
DF-2W | Trican | Defoamer | non-hazardous ingredients | Not Available | 100 | 0.0044 | N/A | |
propylene glycol | 57-55-6 | 100 | 0.0044 | N/A | ||||
GFR-5D | Trican | Friction Reducer | anionic polyacrylamide | Not Available | 100 | 0.0257 | N/A | |
S-17W | Trican | Surfactant | ethylene/propylene oxide polymer | Not Available | 100 | 0.043 | N/A | |
methanol | 67-56-1 | 100 | 0.043 | N/A | ||||
water | Not Available | 100 | 0.043 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-01-19 | 2017-01-26 | Surface Water - Runoff | 2803 |
2017-01-19 | 2017-01-26 | Surface Water - Runoff | 3000 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 7690 | 0.0 | 0.0 | 0.0 |
2018 | 8551 | 0.0 | 0.0 | 0.0 |
2019 | 8037 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-12-19 | No Incident Encountered | 0.00 | 0.00 |
2017-01-24 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]