X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485083211020

Well Details

Well ID: 0485083211020
Loading map...
Location: 02/11-32-048-08W5/0
Location Alias: 02/11-32-48-08 W5M
Location Alias 2: 02/11-32-048-08 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 08
Section: 32
County/Municipality: Brazeau County
Well Name: ARC HZ 102 PEMBINA 11-32-48-8
Operator Name: ARC Resources Ltd.
License Number: 0470597
License Date: 2014-10-14
License Status: Amended
Spud Date: 2014-12-10
Final Drill Date: 2014-12-20
Well Total Depth: 4005.00 m
Surface Hole Latitude: 53.203396
Surface Hole Longitude: -115.166984

For data sources see[1][2]

Well History

Date Event
2014-10-14 Obtained License
2014-12-11 Surface Casing Operation Performed
2014-12-12 Direction Drilling Operation Performed - Deviate
2014-12-13 Direction Drilling Operation Performed - Horizontal
2014-12-15 Intermediate Casing Operation Performed
2014-12-20 Finished Drilling
2014-12-20 Well Log Performed
2014-12-20 Well Mode changed to Drilled and Cased
2014-12-21 Liner Casing Operation Performed
2014-12-21 Perforation Treatment Performed - Open-Hole Completion
2014-12-22 Rig Released
2015-11-09 Well Log Performed
2015-11-19 Perforation Treatment Performed - Multi-Stage Fracture
2015-11-20 Perforation Treatment Performed - Multi-Stage Fracture
2015-12-08 Well Began Production
2015-12-08 Well Fluid changed to Crude Oil
2015-12-08 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-12-10 Excalibur Drilling Ltd. 9 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-12-12 890.40 Deviate (5 - 79 degrees)
2014-12-13 1840.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-12-21 Open Hole/Barefoot Completion 4004.00 4005.00 0
2015-11-19 Multi-Stage Fracture 3410.50 3410.60 0
2015-11-19 Multi-Stage Fracture 3343.60 3343.70 0
2015-11-19 Multi-Stage Fracture 3275.20 3275.30 0
2015-11-19 Multi-Stage Fracture 3219.20 3219.30 0
2015-11-19 Multi-Stage Fracture 3151.00 3151.10 0
2015-11-19 Multi-Stage Fracture 3081.80 3081.90 0
2015-11-19 Multi-Stage Fracture 3011.40 3011.50 0
2015-11-19 Multi-Stage Fracture 2943.30 2943.40 0
2015-11-20 Multi-Stage Fracture 2860.10 2860.20 0
2015-11-20 Multi-Stage Fracture 2791.80 2791.90 0
2015-11-19 Multi-Stage Fracture 3982.50 3982.60 0
2015-11-20 Multi-Stage Fracture 2722.30 2722.40 0
2015-11-20 Multi-Stage Fracture 2655.20 2655.30 0
2015-11-20 Multi-Stage Fracture 2593.40 2593.50 0
2015-11-20 Multi-Stage Fracture 2524.60 2524.70 0
2015-11-20 Multi-Stage Fracture 2445.60 2445.70 0
2015-11-20 Multi-Stage Fracture 2376.30 2376.40 0
2015-11-20 Multi-Stage Fracture 2321.70 2321.80 0
2015-11-20 Multi-Stage Fracture 2250.70 2250.80 0
2015-11-20 Multi-Stage Fracture 2181.80 2181.90 0
2015-11-20 Multi-Stage Fracture 2113.60 2113.70 0
2015-11-19 Multi-Stage Fracture 3908.90 3909.00 0
2015-11-20 Multi-Stage Fracture 2031.40 2031.50 0
2015-11-20 Multi-Stage Fracture 1961.80 1961.90 0
2015-11-19 Multi-Stage Fracture 3842.90 3843.00 0
2015-11-19 Multi-Stage Fracture 3758.90 3759.00 0
2015-11-19 Multi-Stage Fracture 3688.20 3688.30 0
2015-11-19 Multi-Stage Fracture 3619.70 3619.80 0
2015-11-19 Multi-Stage Fracture 3550.10 3550.20 0
2015-11-19 Multi-Stage Fracture 3480.60 3480.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-11-19 2015-11-20 1,558 4,122 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 86.6697 N/A
20/40 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 8.8604 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 3.5546 N/A
50/140 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 0.6448 N/A
DWP-962 Calfrac Bactericide/Biocide Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) 55566-30-8 100 0.0143 N/A
Water 7732-18-5 100 0.0149 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0856 N/A
DWP-621 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0815 N/A
DWP-967 Calfrac Surfactant 2-Propanol 67-63-0 100 0.0909 N/A
Polyol 9171 100 0.0932 N/A
Quaternary Amine Compound 9171 100 0.0923 N/A
Surfactant 1 9171 100 0.0909 N/A
Surfactant 2 9171 100 0.0932 N/A
Terpenes and Terpenoids. sweet orange oil 68647-72-3 100 0.0909 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-11-20 2015-11-20 Surface Water - Runoff 3956

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 575 0.0 0.0 0.0
2016 8596 0.0 0.0 0.0
2017 8261 0.0 0.0 0.0
2018 8374 0.0 0.0 0.0
2019 8639 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-12-22 No Incident Encountered 0.00 0.00
2015-11-27 No Incident Encountered 0.00 0.00

For data sources see[10]

References