If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485082703000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.165295,"lon":-115.107602,"icon":""}]} |
Location: 00/03-27-048-08W5/0 | |
Location Alias: 00/03-27-48-08 W5M | |
Location Alias 2: 00/03-27-048-08 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 08 | |
Section: 27 | |
County/Municipality: Brazeau County | |
Well Name: INPLAY OIL PEMBINA 3-27-48-8 | |
Operator Name: InPlay Oil Corp. | |
License Number: 0416049 | |
License Date: 2009-12-22 | |
License Status: Issued | |
Spud Date: 2010-01-03 | |
Final Drill Date: 2010-01-16 | |
Well Total Depth: 2657.00 m | |
Surface Hole Latitude: 53.165295 | |
Surface Hole Longitude: -115.107602 |
Date | Event |
---|---|
2009-12-22 | Obtained License |
2010-01-05 | Surface Casing Operation Performed |
2010-01-08 | Direction Drilling Operation Performed - Horizontal |
2010-01-11 | Intermediate Casing Operation Performed |
2010-01-11 | Well Log Performed |
2010-01-12 | Well Log Performed |
2010-01-16 | Finished Drilling |
2010-01-16 | Well Log Performed |
2010-01-16 | Well Mode changed to Drilled and Cased |
2010-01-17 | Liner Casing Operation Performed |
2010-01-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-01-18 | Rig Released |
2010-01-21 | Perforation Treatment Performed - Open-Hole Completion |
2010-02-14 | Well Began Production |
2010-02-14 | Well Fluid changed to Crude Oil |
2010-02-14 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-01-08 | 1295.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-01-18 | Multi-Stage Fracture | 2617.60 | 2617.70 | 0 |
2010-01-21 | Open Hole/Barefoot Completion | 1733.00 | 2657.00 | 0 |
2010-01-18 | Multi-Stage Fracture | 2515.20 | 2515.30 | 0 |
2010-01-18 | Multi-Stage Fracture | 2408.80 | 2408.90 | 0 |
2010-01-18 | Multi-Stage Fracture | 2314.00 | 2314.10 | 0 |
2010-01-18 | Multi-Stage Fracture | 2202.80 | 2202.90 | 0 |
2010-01-18 | Multi-Stage Fracture | 2096.60 | 2096.70 | 0 |
2010-01-18 | Multi-Stage Fracture | 2003.40 | 2003.50 | 0 |
2010-01-18 | Multi-Stage Fracture | 1894.20 | 1894.30 | 0 |
2010-01-18 | Multi-Stage Fracture | 1796.40 | 1796.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 7549 | 0.0 | 0.0 | 0.0 |
2011 | 8341 | 0.0 | 0.0 | 0.0 |
2012 | 8705 | 0.0 | 0.0 | 0.0 |
2013 | 8695 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8356 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]