If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485082609000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.165157,"lon":-115.067696,"icon":""}]} |
Location: 00/09-26-048-08W5/0 | |
Location Alias: 00/09-26-48-08 W5M | |
Location Alias 2: 00/09-26-048-08 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 08 | |
Section: 26 | |
County/Municipality: Brazeau County | |
Well Name: DAYLIGHT PEMBINA 9-26-48-8 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0384991 | |
License Date: 2007-11-15 | |
License Status: Suspension | |
Spud Date: 2007-11-25 | |
Final Drill Date: 2007-12-18 | |
Well Total Depth: 2960.00 m | |
Surface Hole Latitude: 53.165157 | |
Surface Hole Longitude: -115.067696 |
Date | Event |
---|---|
2007-11-15 | Obtained License |
2007-11-26 | Surface Casing Operation Performed |
2007-12-01 | Direction Drilling Operation Performed - Deviate |
2007-12-14 | Well Log Performed |
2007-12-16 | Intermediate Casing Operation Performed |
2007-12-18 | Finished Drilling |
2007-12-18 | Well Mode changed to Drilled and Cased |
2007-12-19 | Well Log Performed |
2007-12-20 | Liner Casing Operation Performed |
2007-12-22 | Rig Released |
2008-01-11 | Well Log Performed |
2008-01-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2008-01-17 | Perforation Treatment Performed - Jet Perforation |
2008-01-17 | Well Log Performed |
2008-01-19 | Well Log Performed |
2008-09-01 | Well Began Production |
2008-09-01 | Well Fluid changed to Crude Oil |
2008-09-01 | Well Mode changed to Pumping |
2008-10-01 | Well Fluid changed to Crude Oil |
2008-10-01 | Well Mode changed to Gas Lift |
2011-10-01 | Well Fluid changed to Crude Oil |
2011-10-01 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2007-12-01 | 817.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-01-17 | Perforation | 2900.00 | 2905.00 | 20 |
2008-01-17 | Acid Treatment | 2900.00 | 2905.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 1514 | 0.0 | 0.0 | 0.0 |
2009 | 689 | 0.0 | 0.0 | 0.0 |
2010 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[6]