X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485082113020

Well Details

Well ID: 0485082113020
Loading map...
Location: 02/13-21-048-08W5/0
Location Alias: 02/13-21-48-08 W5M
Location Alias 2: 02/13-21-048-08 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 08
Section: 21
County/Municipality: Brazeau County
Well Name: BAYTEX HZ 102 PEMBINA 13-21-48-8
Operator Name: Baytex Energy Ltd.
License Number: 0433648
License Date: 2011-05-19
License Status: Issued
Spud Date: 2011-07-15
Final Drill Date: 2011-07-27
Well Total Depth: 3259.00 m
Surface Hole Latitude: 53.158528
Surface Hole Longitude: -115.095537

For data sources see[1][2]

Well History

Date Event
2011-05-19 Obtained License
2011-07-17 Surface Casing Operation Performed
2011-07-18 Well Log Performed
2011-07-19 Direction Drilling Operation Performed - Horizontal
2011-07-21 Intermediate Casing Operation Performed
2011-07-22 Well Log Performed
2011-07-27 Finished Drilling
2011-07-27 Well Mode changed to Drilled and Cased
2011-07-29 Production Casing Operation Performed
2011-07-30 Perforation Treatment Performed - Open-Hole Completion
2011-07-30 Rig Released
2011-09-16 Perforation Treatment Performed - Jet Perforation
2011-09-20 Perforation Treatment Performed - Cement Squeeze
2011-09-23 Perforation Treatment Performed - Jet Perforation
2011-09-24 Perforation Treatment Performed - Cement Squeeze
2011-10-26 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-15 Well Log Performed
2011-11-26 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-26 Well Began Production
2011-11-26 Well Fluid changed to Crude Oil
2011-11-26 Well Mode changed to Flowing
2013-11-01 Well Fluid changed to Crude Oil
2013-11-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-07-19 1185.80 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-07-30 Open Hole/Barefoot Completion 3251.00 3259.00 0
2011-09-16 Perforation 497.00 499.00 17
2011-09-20 Cement Squeeze 497.00 499.00 0
2011-09-23 Perforation 428.00 430.00 26
2011-09-24 Cement Squeeze 428.00 430.00 0
2011-10-26 Multi-Stage Fracture 1855.40 3250.00 0
2011-11-26 Multi-Stage Fracture 1738.60 3250.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 862 0.0 0.0 0.0
2012 8558 0.0 0.0 0.0
2013 8487 0.0 0.0 0.0
2014 7768 0.0 0.0 0.0
2015 8211 0.0 0.0 0.0
2016 7603 0.0 0.0 0.0
2017 8290 0.0 0.0 0.0
2018 8361 0.0 0.0 0.0
2019 8482 0.0 0.0 0.0
2020 2006 0.0 0.0 0.0

For data sources see[6]

References