X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485080211020

Well Details

Well ID: 0485080211020
Loading map...
Location: 02/11-02-048-08W5/0
Location Alias: 02/11-02-48-08 W5M
Location Alias 2: 02/11-02-048-08 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 08
Section: 02
County/Municipality: Brazeau County
Well Name: BONTERRA 102 HZ PEMBINA 11-2-48-8
Operator Name: Bonterra Energy Corp.
License Number: 0482340
License Date: 2017-01-11
License Status: Issued
Spud Date: 2017-01-19
Final Drill Date: 2017-01-24
Well Total Depth: 3307.00 m
Surface Hole Latitude: 53.129828
Surface Hole Longitude: -115.071575

For data sources see[1][2]

Well History

Date Event
2017-01-11 Obtained License
2017-01-20 Direction Drilling Operation Performed - Deviate
2017-01-20 Surface Casing Operation Performed
2017-01-22 Direction Drilling Operation Performed - Horizontal
2017-01-24 Finished Drilling
2017-01-24 Well Log Performed
2017-01-24 Well Mode changed to Drilled and Cased
2017-01-25 Production Casing Operation Performed
2017-01-25 Rig Released
2017-03-11 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-12 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-12 Well Began Production
2017-03-12 Well Fluid changed to Crude Oil
2017-03-12 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-01-19 Ironhand Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-01-20 556.40 Deviate (5 - 79 degrees)
2017-01-22 1753.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-03-11 Multi-Stage Fracture 3234.60 3236.50 0
2017-03-12 Multi-Stage Fracture 2790.20 2792.10 0
2017-03-12 Multi-Stage Fracture 2739.70 2741.60 0
2017-03-12 Multi-Stage Fracture 2689.30 2691.20 0
2017-03-12 Multi-Stage Fracture 2639.10 2641.00 0
2017-03-12 Multi-Stage Fracture 2588.10 2590.00 0
2017-03-12 Multi-Stage Fracture 2538.10 2540.00 0
2017-03-12 Multi-Stage Fracture 2487.70 2489.60 0
2017-03-12 Multi-Stage Fracture 2437.20 2439.10 0
2017-03-12 Multi-Stage Fracture 2386.70 2388.60 0
2017-03-12 Multi-Stage Fracture 2336.40 2338.30 0
2017-03-11 Multi-Stage Fracture 3195.60 3197.50 0
2017-03-12 Multi-Stage Fracture 2286.10 2288.00 0
2017-03-12 Multi-Stage Fracture 2235.20 2237.10 0
2017-03-12 Multi-Stage Fracture 2185.30 2187.20 0
2017-03-12 Multi-Stage Fracture 2134.70 2136.60 0
2017-03-12 Multi-Stage Fracture 2084.60 2086.50 0
2017-03-12 Multi-Stage Fracture 2034.70 2036.60 0
2017-03-12 Multi-Stage Fracture 1984.20 1986.10 0
2017-03-12 Multi-Stage Fracture 1934.40 1936.30 0
2017-03-12 Multi-Stage Fracture 1883.60 1885.50 0
2017-03-12 Multi-Stage Fracture 1832.90 1834.80 0
2017-03-11 Multi-Stage Fracture 3144.60 3146.50 0
2017-03-12 Multi-Stage Fracture 1781.80 1783.70 0
2017-03-11 Multi-Stage Fracture 3093.80 3095.70 0
2017-03-12 Multi-Stage Fracture 3043.30 3045.20 0
2017-03-12 Multi-Stage Fracture 2992.40 2994.30 0
2017-03-12 Multi-Stage Fracture 2942.00 2943.90 0
2017-03-12 Multi-Stage Fracture 2891.50 2893.40 0
2017-03-12 Multi-Stage Fracture 2840.90 2842.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-03-11 2017-03-12 1,584 3,264 N/A
2 2017-03-11 2017-03-11 1,584 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 87.2092 N/A
Sand - Tier 2 (20/40) Trican silica crystalline 14808-60-7 100 8.7411 N/A
Sand - Tier 2 (30/50) Trican silica crystalline 14808-60-7 100 3.8739 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0103 N/A
2-mercaptoethanol 60-24-2 100 0.0103 N/A
dibromoacetonitrile 3252-43-5 100 0.0103 N/A
non-hazardous ingredients Not Available 100 0.0103 N/A
sodium bromide 7647-15-6 100 0.0103 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0931 N/A
water Not Available 100 0.0931 N/A
GNE-2 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0444 N/A
propylene glycol 57-55-6 100 0.0444 N/A
GFR-5D Trican Friction Reducer anionic polyacrylamide Not Available 100 0.026 N/A
2 WBO-2 Trican Breaker sodium persulfate 7775-27-1 100 0.0033 N/A
WG-111LA Trican Gelling Agent fumaric acid 110-17-8 100 0.0447 N/A
guar gum 9000-30-0 100 0.0447 N/A
solvent naphtha (petroleum). heavy aliphatic 64742-96-7 100 0.0447 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-03-10 2017-03-11 Surface Water - Runoff 3377

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 6716 0.0 0.0 0.0
2018 8727 0.0 0.0 0.0
2019 8109 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-01-25 No Incident Encountered 0.00 0.00
2017-03-12 No Incident Encountered 0.00 0.00

For data sources see[10]

References