X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485072402000

Well Details

Well ID: 0485072402000
Loading map...
Location: 00/02-24-048-07W5/0
Location Alias: 00/02-24-48-07 W5M
Location Alias 2: 00/02-24-048-07 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 07
Section: 24
County/Municipality: Brazeau County
Well Name: CALPINE PEMBINA 2-24-48-7
Operator Name: Calpine Canada Resources Company
License Number: 0016623
License Date: 1959-01-27
License Status: RecCertified
Spud Date: 1959-03-02
Final Drill Date: 1959-03-10
Well Total Depth: 1484.40 m
Surface Hole Latitude: 53.150573
Surface Hole Longitude: -114.888466

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-01-27 Obtained License
1959-03-10 Finished Drilling
1959-03-10 Production Casing Operation Performed
1959-03-10 Well Mode changed to Drilled and Cased
1959-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-03-16 Perforation Treatment Performed - Fractured
1959-03-16 Perforation Treatment Performed - Jet Perforation
1959-03-23 Well Began Production
1959-03-23 Well Fluid changed to Crude Oil
1959-03-23 Well Mode changed to Flowing
1962-11-14 Well Fluid changed to Crude Oil
1962-11-14 Well Mode changed to Pumping
1965-01-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-11-30 Perforation Treatment Performed - Acid Wash - No Pressure
1965-11-30 Perforation Treatment Performed - Fractured
1973-07-14 Perforation Treatment Performed - Cement Plug
1973-07-14 Well Abandoned
1973-07-14 Well Fluid changed to Crude Oil
1973-07-14 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-03-16 Perforation 1453.30 1454.50 13
1959-03-16 Acid Treatment 1453.30 1454.50 0
1959-03-16 Fracture 1453.30 1454.50 0
1965-01-25 Acid Treatment 1453.30 1454.50 0
1965-11-30 Acid Wash 1453.30 1454.50 0
1965-11-30 Fracture 1453.30 1454.50 0
1973-07-14 Cement Plug 1428.00 1471.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8399 0.0 0.0 0.0
1968 8591 0.0 0.0 0.0

For data sources see[5]

References