X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485071603000

Well Details

Well ID: 0485071603000
Loading map...
Location: 00/03-16-048-07W5/0
Location Alias: 00/03-16-48-07 W5M
Location Alias 2: 00/03-16-048-07 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 07
Section: 16
County/Municipality: Brazeau County
Well Name: ARC HZ PEMBINA 3-16-48-7
Operator Name: ARC Resources Ltd.
License Number: 0432241
License Date: 2011-03-10
License Status: Issued
Spud Date: 2011-08-24
Final Drill Date: 2011-09-01
Well Total Depth: 2465.00 m
Surface Hole Latitude: 53.133743
Surface Hole Longitude: -114.981905

For data sources see[1][2]

Well History

Date Event
2011-03-10 Obtained License
2011-08-25 Surface Casing Operation Performed
2011-08-27 Direction Drilling Operation Performed - Horizontal
2011-08-30 Intermediate Casing Operation Performed
2011-09-01 Finished Drilling
2011-09-01 Well Log Performed
2011-09-01 Well Mode changed to Drilled and Cased
2011-09-02 Liner Casing Operation Performed
2011-09-03 Rig Released
2011-09-25 Well Log Performed
2011-10-01 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-01 Perforation Treatment Performed - Open-Hole Completion
2011-10-31 Well Began Production
2011-10-31 Well Fluid changed to Crude Oil
2011-10-31 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-27 1035.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-01 Multi-Stage Fracture 1644.00 1749.50 0
2011-10-01 Multi-Stage Fracture 1753.00 1869.50 0
2011-10-01 Multi-Stage Fracture 1874.00 1979.00 0
2011-10-01 Multi-Stage Fracture 1983.00 2087.00 0
2011-10-01 Multi-Stage Fracture 2090.50 2184.70 0
2011-10-01 Multi-Stage Fracture 2200.00 2307.00 0
2011-10-01 Multi-Stage Fracture 2310.00 2414.00 0
2011-10-01 Open Hole/Barefoot Completion 1644.00 2414.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1460 0.0 0.0 0.0
2012 8553 0.0 0.0 0.0
2013 8393 0.0 0.0 0.0
2014 8050 0.0 0.0 0.0
2015 8262 0.0 0.0 0.0
2016 7907 0.0 0.0 0.0
2017 8723 0.0 0.0 0.0
2018 8316 0.0 0.0 0.0
2019 8636 0.0 0.0 0.0
2020 2085 0.0 0.0 0.0

For data sources see[6]

References