If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485071602020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.136044,"lon":-114.938045,"icon":""}]} |
Location: 02/02-16-048-07W5/0 | |
Location Alias: 02/02-16-48-07 W5M | |
Location Alias 2: 02/02-16-048-07 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 07 | |
Section: 16 | |
County/Municipality: Brazeau County | |
Well Name: BONTERRA 102 HZ PEMBINA 2-16-48-7 | |
Operator Name: Bonterra Energy Corp. | |
License Number: 0477249 | |
License Date: 2015-10-08 | |
License Status: Issued | |
Spud Date: 2015-11-16 | |
Final Drill Date: 2015-11-21 | |
Well Total Depth: 3030.00 m | |
Surface Hole Latitude: 53.136044 | |
Surface Hole Longitude: -114.938045 |
Date | Event |
---|---|
2015-10-08 | Obtained License |
2015-11-17 | Surface Casing Operation Performed |
2015-11-18 | Direction Drilling Operation Performed - Deviate |
2015-11-19 | Direction Drilling Operation Performed - Horizontal |
2015-11-21 | Finished Drilling |
2015-11-21 | Production Casing Operation Performed |
2015-11-21 | Well Log Performed |
2015-11-21 | Well Mode changed to Drilled and Cased |
2015-11-22 | Rig Released |
2015-12-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-12-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-01-19 | Well Began Production |
2016-01-19 | Well Fluid changed to Crude Oil |
2016-01-19 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2015-11-16 | Ironhand Drilling Inc. | 1 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2015-11-18 | 1010.70 | Deviate (5 - 79 degrees) |
2015-11-19 | 1590.40 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2015-12-17 | Multi-Stage Fracture | 2993.50 | 2993.80 | 0 |
2015-12-17 | Multi-Stage Fracture | 2493.20 | 2495.10 | 0 |
2015-12-17 | Multi-Stage Fracture | 2441.40 | 2443.30 | 0 |
2015-12-17 | Multi-Stage Fracture | 2389.70 | 2391.60 | 0 |
2015-12-18 | Multi-Stage Fracture | 2326.40 | 2328.20 | 0 |
2015-12-18 | Multi-Stage Fracture | 2274.50 | 2276.30 | 0 |
2015-12-18 | Multi-Stage Fracture | 2222.90 | 2224.70 | 0 |
2015-12-18 | Multi-Stage Fracture | 2159.20 | 2161.10 | 0 |
2015-12-18 | Multi-Stage Fracture | 2107.40 | 2109.30 | 0 |
2015-12-18 | Multi-Stage Fracture | 2055.50 | 2057.40 | 0 |
2015-12-18 | Multi-Stage Fracture | 1991.90 | 1993.80 | 0 |
2015-12-17 | Multi-Stage Fracture | 2943.50 | 2945.40 | 0 |
2015-12-18 | Multi-Stage Fracture | 1940.00 | 1941.90 | 0 |
2015-12-18 | Multi-Stage Fracture | 1888.10 | 1890.00 | 0 |
2015-12-18 | Multi-Stage Fracture | 1824.80 | 1826.70 | 0 |
2015-12-18 | Multi-Stage Fracture | 1772.90 | 1774.80 | 0 |
2015-12-18 | Multi-Stage Fracture | 1721.00 | 1722.90 | 0 |
2015-12-18 | Multi-Stage Fracture | 1657.40 | 1659.20 | 0 |
2015-12-18 | Multi-Stage Fracture | 1605.50 | 1607.40 | 0 |
2015-12-17 | Multi-Stage Fracture | 2891.70 | 2893.50 | 0 |
2015-12-17 | Multi-Stage Fracture | 2828.00 | 2829.90 | 0 |
2015-12-17 | Multi-Stage Fracture | 2776.10 | 2778.00 | 0 |
2015-12-17 | Multi-Stage Fracture | 2724.30 | 2726.10 | 0 |
2015-12-17 | Multi-Stage Fracture | 2660.60 | 2662.50 | 0 |
2015-12-17 | Multi-Stage Fracture | 2608.70 | 2610.60 | 0 |
2015-12-17 | Multi-Stage Fracture | 2556.80 | 2558.70 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-12-17 | 2015-12-18 | 1,455 | 2,201 | N/A |
2 | 2015-12-17 | 2015-12-17 | 1,455 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 84.5123 | N/A | |||
20/40 | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 10.0843 | N/A | ||
30/50 | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 5.0272 | N/A | ||
B-1008 | Sanjel | Bactericide/Biocide | BNPD | 52-51-7 | 100 | 0.0108 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.0108 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0108 | N/A | ||||
SCC-6L | Sanjel | Clay Control | 1.6-Hexanediamine dihydrochloride | 6055-52-3 | 100 | 0.1735 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.1735 | N/A | ||||
FRW-5 | Sanjel | Friction Reducer | Alcohols. C11-14 iso. C13-rich. ethoxylated | 78330-21-9 | 100 | 0.0871 | N/A | |
Distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0871 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0871 | N/A | ||||
NE-10 (LDP-F-3315) | Sanjel | Surfactant | Isopropanol | 67-63-0 | 100 | 0.0895 | N/A | |
Methanol | 67-56-1 | 100 | 0.0895 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0895 | N/A | ||||
Quaternary ammonium compound | 68607-28-3 | 100 | 0.0895 | N/A | ||||
2 | 40/70 | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 0.3888 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2015-07-15 | 2015-07-21 | Oilfield Produced Water | 252 |
2015-07-11 | 2015-07-19 | Oilfield Produced Water | 525 |
2015-07-09 | 2015-07-17 | Oilfield Produced Water | 1357 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2016 | 8147 | 0.0 | 0.0 | 0.0 |
2017 | 8318 | 0.0 | 0.0 | 0.0 |
2018 | 7496 | 0.0 | 0.0 | 0.0 |
2019 | 8711 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-11-22 | No Incident Encountered | 0.00 | 0.00 |
2015-12-18 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]