X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485071311000

Well Details

Well ID: 0485071311000
Loading map...
Location: 00/11-13-048-07W5/0
Location Alias: 00/11-13-48-07 W5M
Location Alias 2: 00/11-13-048-07 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 07
Section: 13
County/Municipality: Brazeau County
Well Name: ARC HZ PEMBINA 11-13-48-7
Operator Name: ARC Resources Ltd.
License Number: 0468394
License Date: 2014-07-23
License Status: Issued
Spud Date: 2014-10-10
Final Drill Date: 2014-10-17
Well Total Depth: 3502.00 m
Surface Hole Latitude: 53.142271
Surface Hole Longitude: -114.926743

For data sources see[1][2]

Well History

Date Event
2014-07-23 Obtained License
2014-10-11 Surface Casing Operation Performed
2014-10-12 Direction Drilling Operation Performed - Deviate
2014-10-13 Direction Drilling Operation Performed - Horizontal
2014-10-14 Intermediate Casing Operation Performed
2014-10-17 Finished Drilling
2014-10-17 Well Log Performed
2014-10-17 Well Mode changed to Drilled and Cased
2014-10-18 Liner Casing Operation Performed
2014-10-18 Perforation Treatment Performed - Open-Hole Completion
2014-10-19 Rig Released
2014-11-23 Perforation Treatment Performed - Multi-Stage Fracture
2015-01-08 Well Began Production
2015-01-08 Well Fluid changed to Crude Oil
2015-01-08 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-10-10 Excalibur Drilling Ltd. 9 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-10-12 1058.80 Deviate (5 - 79 degrees)
2014-10-13 1574.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-10-18 Open Hole/Barefoot Completion 3488.00 3502.00 0
2014-11-23 Multi-Stage Fracture 2773.70 2773.80 0
2014-11-23 Multi-Stage Fracture 2705.20 2705.30 0
2014-11-23 Multi-Stage Fracture 2625.10 2625.20 0
2014-11-23 Multi-Stage Fracture 2541.70 2541.80 0
2014-11-23 Multi-Stage Fracture 2459.30 2459.40 0
2014-11-23 Multi-Stage Fracture 2378.20 2378.30 0
2014-11-23 Multi-Stage Fracture 2296.20 2296.30 0
2014-11-23 Multi-Stage Fracture 2215.80 2215.90 0
2014-11-23 Multi-Stage Fracture 2121.10 2121.20 0
2014-11-23 Multi-Stage Fracture 2024.50 2024.60 0
2014-11-23 Multi-Stage Fracture 3483.40 3483.50 0
2014-11-23 Multi-Stage Fracture 1945.40 1945.50 0
2014-11-23 Multi-Stage Fracture 1864.10 1864.20 0
2014-11-23 Multi-Stage Fracture 1793.70 1793.80 0
2014-11-23 Multi-Stage Fracture 1725.60 1725.70 0
2014-11-23 Multi-Stage Fracture 1658.10 1658.20 0
2014-11-23 Multi-Stage Fracture 3408.60 3408.70 0
2014-11-23 Multi-Stage Fracture 3311.50 3311.60 0
2014-11-23 Multi-Stage Fracture 3216.30 3216.40 0
2014-11-23 Multi-Stage Fracture 3134.00 3134.10 0
2014-11-23 Multi-Stage Fracture 3050.60 3050.70 0
2014-11-23 Multi-Stage Fracture 2952.60 2952.70 0
2014-11-23 Multi-Stage Fracture 2856.10 2856.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-11-23 2014-11-23 1,434 2,736 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 86.8315 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 10.4325 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 3.4712 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 0.5937 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0128 N/A
dibromoacetonitrile 3252-43-5 100 0.0128 N/A
non-hazardous ingredients Not Available 100 0.0128 N/A
polyethylene glycol 25322-68-3 100 0.0128 N/A
sodium bromide 7647-15-6 100 0.0128 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.1873 N/A
water Not Available 100 0.1873 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0966 N/A
propylene glycol 57-55-6 100 0.0966 N/A
FR-8 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0477 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0477 N/A
non-hazardous ingredients Not Available 100 0.0477 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-11-19 2014-11-21 Surface Water - Runoff 2359
2014-11-22 2014-11-23 Surface Water - Runoff 377

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 6162 0.0 0.0 0.0
2016 8055 0.0 0.0 0.0
2017 7545 0.0 0.0 0.0
2018 6889 0.0 0.0 0.0
2019 7547 0.0 0.0 0.0
2020 2132 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-10-19 No Incident Encountered 0.00 0.00
2014-11-27 No Incident Encountered 0.00 0.00

For data sources see[10]

References