X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485070701020

Well Details

Well ID: 0485070701020
Loading map...
Location: 02/01-07-048-07W5/0
Location Alias: 02/01-07-48-07 W5M
Location Alias 2: 02/01-07-048-07 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 07
Section: 07
County/Municipality: Brazeau County
Well Name: ARC HZ PEMBINA 1-7-48-7
Operator Name: ARC Resources Ltd.
License Number: 0425793
License Date: 2010-11-12
License Status: Issued
Spud Date: 2010-11-21
Final Drill Date: 2010-11-29
Well Total Depth: 3017.00 m
Surface Hole Latitude: 53.133743
Surface Hole Longitude: -114.982129

For data sources see[1][2]

Well History

Date Event
2010-11-12 Obtained License
2010-11-21 Well Log Performed
2010-11-22 Surface Casing Operation Performed
2010-11-23 Direction Drilling Operation Performed - Horizontal
2010-11-25 Intermediate Casing Operation Performed
2010-11-29 Finished Drilling
2010-11-29 Liner Casing Operation Performed
2010-11-29 Well Log Performed
2010-11-29 Well Mode changed to Drilled and Cased
2010-11-30 Rig Released
2010-12-01 Well Log Performed
2010-12-12 Well Log Performed
2010-12-19 Perforation Treatment Performed - Multi-Stage Fracture
2010-12-20 Perforation Treatment Performed - Open-Hole Completion
2011-01-07 Well Began Production
2011-01-07 Well Fluid changed to Crude Oil
2011-01-07 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-11-23 1048.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-12-19 Multi-Stage Fracture 1639.50 1791.30 0
2010-12-19 Multi-Stage Fracture 1796.40 1958.30 0
2010-12-19 Multi-Stage Fracture 1963.40 2126.10 0
2010-12-19 Multi-Stage Fracture 2131.20 2282.60 0
2010-12-19 Multi-Stage Fracture 2287.70 2531.10 0
2010-12-19 Multi-Stage Fracture 2536.20 2790.50 0
2010-12-20 Open Hole/Barefoot Completion 1639.50 2790.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 8049 0.0 0.0 0.0
2012 8685 0.0 0.0 0.0
2013 8514 0.0 0.0 0.0
2014 8645 0.0 0.0 0.0
2015 8699 0.0 0.0 0.0
2016 7217 0.0 0.0 0.0
2017 8479 0.0 0.0 0.0
2018 7335 0.0 0.0 0.0
2019 8676 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References