X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485070106020

Well Details

Well ID: 0485070106020
Loading map...
Location: 02/06-01-048-07W5/0
Location Alias: 02/06-01-48-07 W5M
Location Alias 2: 02/06-01-048-07 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 07
Section: 01
County/Municipality: Brazeau County
Well Name: ARC 102 HZ PEMBINA 6-1-48-7
Operator Name: ARC Resources Ltd.
License Number: 0451475
License Date: 2012-12-06
License Status: Issued
Spud Date: 2013-01-21
Final Drill Date: 2013-01-29
Well Total Depth: 3599.00 m
Surface Hole Latitude: 53.107374
Surface Hole Longitude: -114.924948

For data sources see[1][2]

Well History

Date Event
2012-12-06 Obtained License
2013-01-22 Surface Casing Operation Performed
2013-01-23 Direction Drilling Operation Performed - Deviate
2013-01-25 Direction Drilling Operation Performed - Horizontal
2013-01-26 Intermediate Casing Operation Performed
2013-01-29 Finished Drilling
2013-01-29 Well Log Performed
2013-01-29 Well Mode changed to Drilled and Cased
2013-01-31 Liner Casing Operation Performed
2013-02-01 Perforation Treatment Performed - Open-Hole Completion
2013-02-01 Rig Released
2013-02-03 Well Log Performed
2013-02-06 Perforation Treatment Performed - Multi-Stage Fracture
2013-02-07 Well Began Production
2013-02-07 Well Fluid changed to Crude Oil
2013-02-07 Well Mode changed to Flowing
2013-03-10 Well Fluid changed to Crude Oil
2013-03-10 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-01-21 Excalibur Drilling Ltd. 8 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-01-23 859.10 Deviate (5 - 79 degrees)
2013-01-25 1777.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-02-01 Open Hole/Barefoot Completion 3575.00 3599.00 0
2013-02-06 Multi-Stage Fracture 2538.40 2538.50 0
2013-02-06 Multi-Stage Fracture 2618.90 2619.00 0
2013-02-06 Multi-Stage Fracture 2699.70 2699.80 0
2013-02-06 Multi-Stage Fracture 2780.50 2780.60 0
2013-02-06 Multi-Stage Fracture 2861.40 2861.50 0
2013-02-06 Multi-Stage Fracture 2942.20 2942.30 0
2013-02-06 Multi-Stage Fracture 3023.30 3023.40 0
2013-02-06 Multi-Stage Fracture 3104.20 3104.30 0
2013-02-06 Multi-Stage Fracture 3185.00 3185.10 0
2013-02-06 Multi-Stage Fracture 3265.80 3265.90 0
2013-02-06 Multi-Stage Fracture 1881.40 1881.50 0
2013-02-06 Multi-Stage Fracture 3346.50 3346.60 0
2013-02-06 Multi-Stage Fracture 3427.10 3427.20 0
2013-02-06 Multi-Stage Fracture 3508.10 3508.20 0
2013-02-06 Multi-Stage Fracture 3570.40 3570.50 0
2013-02-06 Multi-Stage Fracture 1973.40 1973.50 0
2013-02-06 Multi-Stage Fracture 2053.90 2054.00 0
2013-02-06 Multi-Stage Fracture 2134.70 2134.80 0
2013-02-06 Multi-Stage Fracture 2215.40 2215.50 0
2013-02-06 Multi-Stage Fracture 2296.10 2296.20 0
2013-02-06 Multi-Stage Fracture 2376.90 2377.00 0
2013-02-06 Multi-Stage Fracture 2457.60 2457.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-02-06 2013-02-06 1,503 510 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Nitrogen 7727-37-9 100 17.8192 N/A
Water Not Available 100 48.0074 N/A
20/40 Sanjel Crystalline Silica 14808-60-7 100 31.2519 N/A
50/140 Sanjel Crystalline Silica 14808-60-7 100 2.0709 N/A
B-1008 Sanjel Bactericide/Biocide BNPD 52-51-7 100 0.0047 N/A
Methyl Alcohol 67-56-1 100 0.0047 N/A
Breaker-1Z Sanjel Breaker Water Not Available 100 0.0461 N/A
BUFFER-A Sanjel Buffer Acetic Acid 64-19-7 100 0.0894 N/A
Water Not Available 100 0.0894 N/A
SCC-6L Sanjel Clay Control 1.6-Hexanediamine dihydrochloride 6055-52-3 100 0.1845 N/A
Non-Hazardous Ingredients Not Available 100 0.1845 N/A
DF-3 Sanjel Defoamer Secondary alcohol ethoxylate 84133-50-6 100 0.0037 N/A
Severely hydrotreated. hydroisomerized. hydrocarbon fluid Not Available 100 0.0037 N/A
FA-1 Sanjel Foamer Ammonium C8-10 Alcohol 68891-29-2 100 0.1873 N/A
Ethanol 64-17-5 100 0.1873 N/A
Non-Hazardous Ingredients Not Available 100 0.1873 N/A
WG-6ZL Sanjel Gelling Agent Polysaccharide Suspension Not Available 100 0.2889 N/A
NE-5 Sanjel Surfactant Alkyl benzenesulfonic acid 68584-22-5 100 0.0456 N/A
Diethylenetriamine 111-40-0 100 0.0456 N/A
Isopropyl Alcohol 67-63-0 100 0.0456 N/A
Non-Hazardous Ingredients Not Available 100 0.0456 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-02-07 2013-02-07 Surface Water - Runoff 500
2013-02-13 2013-02-13 Oilfield Produced Water 20

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 7411 0.0 0.0 0.0
2014 8568 0.0 0.0 0.0
2015 8609 0.0 0.0 0.0
2016 8510 0.0 0.0 0.0
2017 2051 0.0 0.0 0.0
2018 8692 0.0 0.0 0.0
2019 8036 0.0 0.0 0.0
2020 2015 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-02-01 No Incident Encountered 0.00 0.00
2013-02-14 No Incident Encountered 0.00 0.00

For data sources see[10]

References