If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485070103020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.107253,"lon":-114.924948,"icon":""}]} |
Location: 02/03-01-048-07W5/0 | |
Location Alias: 02/03-01-48-07 W5M | |
Location Alias 2: 02/03-01-048-07 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 07 | |
Section: 01 | |
County/Municipality: Brazeau County | |
Well Name: ARC 102 HZ PEMBINA 3-1-48-7 | |
Operator Name: ARC Resources Ltd. | |
License Number: 0451474 | |
License Date: 2012-12-06 | |
License Status: Issued | |
Spud Date: 2013-01-10 | |
Final Drill Date: 2013-01-18 | |
Well Total Depth: 3508.00 m | |
Surface Hole Latitude: 53.107253 | |
Surface Hole Longitude: -114.924948 |
Date | Event |
---|---|
2012-12-06 | Obtained License |
2013-01-10 | Surface Casing Operation Performed |
2013-01-12 | Direction Drilling Operation Performed - Deviate |
2013-01-13 | Direction Drilling Operation Performed - Horizontal |
2013-01-15 | Intermediate Casing Operation Performed |
2013-01-18 | Finished Drilling |
2013-01-18 | Well Log Performed |
2013-01-18 | Well Mode changed to Drilled and Cased |
2013-01-19 | Liner Casing Operation Performed |
2013-01-20 | Rig Released |
2013-02-03 | Well Log Performed |
2013-02-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-02-08 | Well Began Production |
2013-02-08 | Well Fluid changed to Crude Oil |
2013-02-08 | Well Mode changed to Flowing |
2013-03-10 | Well Fluid changed to Crude Oil |
2013-03-10 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-01-10 | Excalibur Drilling Ltd. | 8 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2013-01-12 | 964.00 | Deviate (5 - 79 degrees) |
2013-01-13 | 1637.90 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-02-08 | Multi-Stage Fracture | 1744.40 | 1744.50 | 0 |
2013-02-08 | Multi-Stage Fracture | 2476.10 | 2476.20 | 0 |
2013-02-08 | Multi-Stage Fracture | 2560.50 | 2560.60 | 0 |
2013-02-08 | Multi-Stage Fracture | 2646.00 | 2646.10 | 0 |
2013-02-08 | Multi-Stage Fracture | 2731.10 | 2731.20 | 0 |
2013-02-08 | Multi-Stage Fracture | 2817.20 | 2817.30 | 0 |
2013-02-08 | Multi-Stage Fracture | 2901.30 | 2901.40 | 0 |
2013-02-08 | Multi-Stage Fracture | 2985.40 | 2985.50 | 0 |
2013-02-08 | Multi-Stage Fracture | 3070.20 | 3070.30 | 0 |
2013-02-08 | Multi-Stage Fracture | 3153.10 | 3153.20 | 0 |
2013-02-08 | Multi-Stage Fracture | 3238.20 | 3238.30 | 0 |
2013-02-08 | Multi-Stage Fracture | 1815.50 | 1815.60 | 0 |
2013-02-08 | Multi-Stage Fracture | 3323.40 | 3323.50 | 0 |
2013-02-08 | Multi-Stage Fracture | 3408.30 | 3408.40 | 0 |
2013-02-08 | Multi-Stage Fracture | 3483.40 | 3483.50 | 0 |
2013-02-08 | Multi-Stage Fracture | 1898.00 | 1898.10 | 0 |
2013-02-08 | Multi-Stage Fracture | 1982.30 | 1982.40 | 0 |
2013-02-08 | Multi-Stage Fracture | 2064.80 | 2064.90 | 0 |
2013-02-08 | Multi-Stage Fracture | 2148.40 | 2148.50 | 0 |
2013-02-08 | Multi-Stage Fracture | 2230.70 | 2230.80 | 0 |
2013-02-08 | Multi-Stage Fracture | 2312.50 | 2312.60 | 0 |
2013-02-08 | Multi-Stage Fracture | 2391.80 | 2391.90 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-02-08 | 2013-02-08 | 1,504 | 3,155 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Nitrogen | 7727-37-9 | 100 | 4.6024 | N/A | |||
Water | Not Available | 100 | 80.6946 | N/A | ||||
30/50 | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 5.677 | N/A | ||
40/70 | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 8.0231 | N/A | ||
50/140 | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 0.6372 | N/A | ||
B-1008 | Sanjel | Bactericide/Biocide | BNPD | 52-51-7 | 100 | 0.0081 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.0081 | N/A | ||||
SCC-6L | Sanjel | Clay Control | 1.6-Hexanediamine dihydrochloride | 6055-52-3 | 100 | 0.3049 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.3049 | N/A | ||||
FRW-3 | Sanjel | Friction Reducer | Isoparaffinic Solvent | 64742-47-8 | 100 | 0.0451 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.0451 | N/A | ||||
Surfactant | 68131-40-8 | 100 | 0.0451 | N/A | ||||
NE-5 | Sanjel | Surfactant | Alkyl benzenesulfonic acid | 68584-22-5 | 100 | 0.0072 | N/A | |
Diethylenetriamine | 111-40-0 | 100 | 0.0072 | N/A | ||||
Isopropyl Alcohol | 67-63-0 | 100 | 0.0072 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0072 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-02-07 | 2013-02-07 | Surface Water - Runoff | 2555 |
2013-02-08 | 2013-02-08 | Surface Water - Runoff | 400 |
2013-02-07 | 2013-02-07 | Surface Water - Runoff | 449 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 6783 | 0.0 | 0.0 | 0.0 |
2014 | 8460 | 0.0 | 0.0 | 0.0 |
2015 | 7424 | 0.0 | 0.0 | 0.0 |
2016 | 7781 | 0.0 | 0.0 | 0.0 |
2017 | 2161 | 0.0 | 0.0 | 0.0 |
2018 | 3990 | 0.0 | 0.0 | 0.0 |
2019 | 6720 | 0.0 | 0.0 | 0.0 |
2020 | 2172 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-01-20 | No Incident Encountered | 0.00 | 0.00 |
2013-02-21 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]