X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485062914002

Well Details

Well ID: 0485062914002
Loading map...
Location: 00/14-29-048-06W5/2
Location Alias: 00/14-29-48-06 W5M
Location Alias 2: 00/14-29-048-06 W5/02
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 06
Section: 29
County/Municipality: Brazeau County
Well Name: IMP CDN-SUP PEMBINA 14-29BR-48-6
Operator Name: ARC Resources Ltd.
License Number: 0007113
License Date: 1953-09-29
License Status: Abandoned
Spud Date: 1953-10-25
Final Drill Date: 1954-05-27
Well Total Depth: 3146.10 m
Surface Hole Latitude: 53.176431
Surface Hole Longitude: -114.845703

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-09-29 Obtained License
1953-11-02 Drill Stem Test Performed
1953-11-08 Drill Stem Test Performed
1953-11-09 Drill Stem Test Performed
1953-11-11 Drill Stem Test Performed
1953-11-13 Drill Stem Test Performed
1953-11-14 Drill Stem Test Performed
1953-11-15 Drill Stem Test Performed
1953-11-16 Drill Stem Test Performed
1953-11-23 Drill Stem Test Performed
1953-11-24 Drill Stem Test Performed
1953-11-25 Drill Stem Test Performed
1953-11-29 Drill Stem Test Performed
1953-12-01 Drill Stem Test Performed
1953-12-16 Drill Stem Test Performed
1953-12-17 Drill Stem Test Performed
1954-01-12 Production Casing Operation Performed
1954-01-26 Drill Stem Test Performed
1954-01-28 Drill Stem Test Performed
1954-02-01 Drill Stem Test Performed
1954-02-06 Drill Stem Test Performed
1954-02-10 Drill Stem Test Performed
1954-02-18 Drill Stem Test Performed
1954-03-14 Drill Stem Test Performed
1954-03-21 Drill Stem Test Performed
1954-03-28 Drill Stem Test Performed
1954-04-04 Drill Stem Test Performed
1954-05-19 Drill Stem Test Performed
1954-05-23 Drill Stem Test Performed
1954-05-27 Drill Stem Test Performed
1954-05-27 Finished Drilling
1954-05-27 Well Mode changed to Drilled and Cased
1954-06-08 Perforation Treatment Performed - Bullet Perforation
1954-06-08 Perforation Treatment Performed - Jet Perforation
1954-06-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-06-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1954-06-13 Perforation Treatment Performed - Bullet Perforation
1954-06-13 Perforation Treatment Performed - Jet Perforation
1954-06-28 Perforation Treatment Performed - Fractured
1994-07-28 Perforation Treatment Performed - Cement Squeeze
1994-07-28 Plug Back Performed
1994-07-28 Well Log Performed
1994-07-30 Perforation Treatment Performed - Jet Perforation
1994-07-30 Well Log Performed
1994-08-01 Well Began Production
1994-08-01 Well Fluid changed to Gas
1994-08-01 Well Mode changed to Flowing
1995-10-01 Well Fluid changed to Gas
1995-10-01 Well Mode changed to Suspended
1999-08-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-08-27 Perforation Treatment Performed - Jet Perforation
1999-08-27 Plug Back Performed
1999-08-27 Well Fluid changed to Gas
1999-08-27 Well Log Performed
1999-08-27 Well Mode changed to Abandoned Zone
2000-10-27 Perforation Treatment Performed - Remedial Casing
2001-07-23 Well Abandoned
2001-07-23 Well Fluid changed to Gas
2001-07-23 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-06-08 Bullet Perforation 1412.40 1417.30 13
1994-07-30 Perforation 876.00 878.00 13
1994-07-30 Perforation 884.00 887.00 13
1994-07-30 Perforation 893.70 896.70 13
1999-08-27 Packing Device Capped w/Cement 812.00 862.00 0
1999-08-27 Perforation 337.30 338.30 13
2000-10-27 Remedial Casing Cementing 337.30 338.30 0
1954-06-08 Perforation 1412.40 1417.30 13
1954-06-09 Acid Treatment 1412.40 1417.30 0
1954-06-13 Packing Device Capped w/Cement 1115.00 1115.00 0
1954-06-13 Bullet Perforation 1095.50 1100.90 13
1954-06-13 Perforation 1095.50 1100.90 13
1954-06-13 Acid Treatment 1095.50 1100.90 0
1954-06-28 Fracture 1095.50 1100.90 0
1994-07-28 Cement Squeeze 1095.50 1100.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 744 0.0 0.0 0.0
1995 2598 0.0 0.0 0.0

For data sources see[5]

References