X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485062808000

Well Details

Well ID: 0485062808000
Loading map...
Location: 00/08-28-048-06W5/0
Location Alias: 00/08-28-48-06 W5M
Location Alias 2: 00/08-28-048-06 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 06
Section: 28
County/Municipality: Brazeau County
Well Name: IMP CDN SUP BUCK CREEK 8-28C-48-6
Operator Name: ARC Resources Ltd.
License Number: 0012959
License Date: 1957-01-18
License Status: Issued
Spud Date: 1957-01-23
Final Drill Date: 1957-02-06
Well Total Depth: 1414.30 m
Surface Hole Latitude: 53.168610
Surface Hole Longitude: -114.809972

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-01-18 Obtained License
1957-02-02 Drill Stem Test Performed
1957-02-06 Drill Stem Test Performed
1957-02-06 Finished Drilling
1957-02-06 Well Mode changed to Drilled and Cased
1957-02-07 Production Casing Operation Performed
1957-02-13 Perforation Treatment Performed - Fractured
1957-02-13 Perforation Treatment Performed - Jet Perforation
1957-03-07 Well Began Production
1957-03-07 Well Fluid changed to Crude Oil
1957-03-07 Well Mode changed to Flowing
1962-03-05 Well Fluid changed to Crude Oil
1962-03-05 Well Mode changed to Pumping
1972-07-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-12-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-06-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-11-01 Perforation Treatment Performed - Jet Perforation
1986-11-01 Well Log Performed
1986-11-03 Perforation Treatment Performed - Fractured
1989-11-17 Well Fluid changed to Crude Oil
1989-11-17 Well Mode changed to Suspended
1991-03-04 Well Fluid changed to Crude Oil
1991-03-04 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1957-02-13 Perforation 1386.50 1388.70 13
1957-02-13 Perforation 1389.60 1392.00 13
1957-02-13 Fracture 1386.50 1392.00 0
1972-07-06 Acid Treatment 1386.50 1392.00 0
1973-12-20 Acid Treatment 1386.50 1392.00 0
1974-06-28 Acid Treatment 1386.50 1392.00 0
1986-11-01 Perforation 1384.40 1394.00 7
1986-11-03 Fracture 1384.40 1394.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7845 0.0 0.0 0.0
1968 7860 0.0 0.0 0.0
1969 8303 0.0 0.0 0.0
1970 8759 0.0 0.0 0.0
1971 8759 0.0 0.0 0.0
1972 8483 0.0 0.0 0.0
1973 8751 0.0 0.0 0.0
1974 7326 0.0 0.0 0.0
1975 8092 0.0 0.0 0.0
1976 8579 0.0 0.0 0.0
1977 8491 0.0 0.0 0.0
1978 8633 0.0 0.0 0.0
1979 6935 0.0 0.0 0.0
1980 7902 0.0 0.0 0.0
1981 8258 0.0 0.0 0.0
1982 8030 0.0 0.0 0.0
1983 8475 0.0 0.0 0.0
1984 7375 0.0 0.0 0.0
1985 7504 0.0 0.0 0.0
1986 6321 0.0 0.0 0.0
1987 8727 0.0 0.0 0.0
1988 7986 0.0 0.0 0.0
1989 7515 0.0 0.0 0.0
1991 7117 0.0 0.0 0.0
1992 8188 0.0 0.0 0.0
1993 8636 0.0 0.0 0.0
1994 7292 0.0 0.0 0.0
1995 8651 0.0 0.0 0.0
1996 8518 0.0 0.0 0.0
1997 8394 0.0 0.0 0.0
1998 8655 0.0 0.0 0.0
1999 8707 0.0 0.0 0.0
2000 8711 0.0 0.0 0.0
2001 8284 0.0 0.0 0.0
2002 8007 0.0 0.0 0.0
2003 7721 0.0 0.0 0.0
2004 8103 0.0 0.0 0.0
2005 8636 0.0 0.0 0.0
2006 8615 0.0 0.0 0.0
2007 7705 0.0 0.0 0.0
2008 7716 0.0 0.0 0.0
2009 8728 0.0 0.0 0.0
2010 8245 0.0 0.0 0.0
2011 7562 0.0 0.0 0.0
2012 7797 0.0 0.0 0.0
2013 7233 0.0 0.0 0.0
2014 8717 0.0 0.0 0.0
2015 5972 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8413 0.0 0.0 0.0
2018 8367 0.0 0.0 0.0
2019 8754 0.0 0.0 0.0
2020 1888 0.0 0.0 0.0

For data sources see[5]

References