X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485061715020

Well Details

Well ID: 0485061715020
Loading map...
Location: 02/15-17-048-06W5/0
Location Alias: 02/15-17-48-06 W5M
Location Alias 2: 02/15-17-048-06 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 06
Section: 17
County/Municipality: Brazeau County
Well Name: BONTERRA 102 HZ PEMBINA 15-17-48-6
Operator Name: Bonterra Energy Corp.
License Number: 0488711
License Date: 2018-04-03
License Status: Issued
Spud Date: 2018-07-13
Final Drill Date: 2018-07-17
Well Total Depth: 3055.00 m
Surface Hole Latitude: 53.132328
Surface Hole Longitude: -114.833783

For data sources see[1][2]

Well History

Date Event
2018-04-03 Obtained License
2018-07-13 Surface Casing Operation Performed
2018-07-14 Direction Drilling Operation Performed - Deviate
2018-07-15 Direction Drilling Operation Performed - Horizontal
2018-07-17 Finished Drilling
2018-07-17 Well Log Performed
2018-07-17 Well Mode changed to Drilled and Cased
2018-07-18 Production Casing Operation Performed
2018-07-18 Rig Released
2018-07-27 Well Log Performed
2018-08-01 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-15 Well Began Production
2018-08-15 Well Fluid changed to Crude Oil
2018-08-15 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-07-12 Ironhand Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-07-14 1079.00 Deviate (5 - 79 degrees)
2018-07-15 1625.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-08-01 Multi-Stage Fracture 3037.70 3037.80 0
2018-08-01 Multi-Stage Fracture 2655.20 2657.10 0
2018-08-01 Multi-Stage Fracture 2612.50 2614.40 0
2018-08-01 Multi-Stage Fracture 2569.80 2571.70 0
2018-08-01 Multi-Stage Fracture 2527.10 2529.00 0
2018-08-01 Multi-Stage Fracture 2484.40 2486.40 0
2018-08-01 Multi-Stage Fracture 2441.80 2443.80 0
2018-08-01 Multi-Stage Fracture 2399.10 2401.00 0
2018-08-01 Multi-Stage Fracture 2356.50 2358.40 0
2018-08-01 Multi-Stage Fracture 2302.10 2304.00 0
2018-08-01 Multi-Stage Fracture 2247.00 2248.90 0
2018-08-01 Multi-Stage Fracture 2996.80 2998.70 0
2018-08-01 Multi-Stage Fracture 2191.60 2193.50 0
2018-08-01 Multi-Stage Fracture 2137.50 2139.40 0
2018-08-01 Multi-Stage Fracture 2086.70 2088.70 0
2018-08-01 Multi-Stage Fracture 2036.00 2037.90 0
2018-08-01 Multi-Stage Fracture 1985.40 1987.30 0
2018-08-01 Multi-Stage Fracture 1934.40 1936.30 0
2018-08-01 Multi-Stage Fracture 1883.30 1885.20 0
2018-08-01 Multi-Stage Fracture 1832.20 1834.10 0
2018-08-01 Multi-Stage Fracture 1777.50 1779.40 0
2018-08-01 Multi-Stage Fracture 1727.10 1729.00 0
2018-08-01 Multi-Stage Fracture 2954.00 2955.90 0
2018-08-01 Multi-Stage Fracture 1672.60 1674.50 0
2018-08-01 Multi-Stage Fracture 2911.30 2913.20 0
2018-08-01 Multi-Stage Fracture 2868.60 2870.50 0
2018-08-01 Multi-Stage Fracture 2825.90 2827.80 0
2018-08-01 Multi-Stage Fracture 2783.40 2785.30 0
2018-08-01 Multi-Stage Fracture 2740.70 2742.60 0
2018-08-01 Multi-Stage Fracture 2697.90 2699.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-08-01 2018-08-01 1,445 2,615 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 84.5759 N/A
Sand - Tier 2 (20/40) Trican silica crystalline 14808-60-7 100 10.1516 N/A
Sand - Tier 2 (30/50) Trican silica crystalline 14808-60-7 100 5.0737 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0201 N/A
dibromoacetonitrile 3252-43-5 100 0.0201 N/A
non-hazardous ingredients Not Available 100 0.0201 N/A
polyethylene glycol 25322-68-3 100 0.0201 N/A
sodium bromide 7647-15-6 100 0.0201 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0903 N/A
water Not Available 100 0.0903 N/A
FR-22 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0469 N/A
distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0469 N/A
non-hazardous ingredients Not Available 100 0.0469 N/A
NMR-1 Trican Surfactant methanol 67-56-1 100 0.0412 N/A
non-hazardous ingredients Not Available 100 0.0412 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-07-29 2018-08-02 Surface Water - Runoff 2913

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 3227 0.0 0.0 0.0
2019 8372 0.0 0.0 0.0
2020 2153 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-07-18 No Incident Encountered 0.00 0.00
2018-08-01 No Incident Encountered 0.00 0.00

For data sources see[10]

References