If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485061511020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.14708,"lon":-114.833271,"icon":""}]} |
Location: 02/11-15-048-06W5/0 | |
Location Alias: 02/11-15-48-06 W5M | |
Location Alias 2: 02/11-15-048-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 06 | |
Section: 15 | |
County/Municipality: Brazeau County | |
Well Name: BONTERRA 102 HZ PEMBINA 11-15-48-6 | |
Operator Name: Bonterra Energy Corp. | |
License Number: 0488603 | |
License Date: 2018-03-16 | |
License Status: Issued | |
Spud Date: 2018-03-27 | |
Final Drill Date: 2018-04-02 | |
Well Total Depth: 3860.00 m | |
Surface Hole Latitude: 53.147080 | |
Surface Hole Longitude: -114.833271 |
Date | Event |
---|---|
2018-03-16 | Obtained License |
2018-03-28 | Direction Drilling Operation Performed - Deviate |
2018-03-28 | Surface Casing Operation Performed |
2018-03-29 | Direction Drilling Operation Performed - Horizontal |
2018-04-02 | Finished Drilling |
2018-04-02 | Well Log Performed |
2018-04-02 | Well Mode changed to Drilled and Cased |
2018-04-03 | Production Casing Operation Performed |
2018-04-03 | Rig Released |
2018-04-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-04-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-04-27 | Well Began Production |
2018-04-27 | Well Fluid changed to Crude Oil |
2018-04-27 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-03-27 | Ironhand Drilling Inc. | 1 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-03-28 | 730.10 | Deviate (5 - 79 degrees) |
2018-03-29 | 1597.90 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-04-18 | Multi-Stage Fracture | 3843.90 | 3844.50 | 0 |
2018-04-18 | Multi-Stage Fracture | 3391.80 | 3393.70 | 0 |
2018-04-18 | Multi-Stage Fracture | 3336.30 | 3338.20 | 0 |
2018-04-18 | Multi-Stage Fracture | 3281.00 | 3282.90 | 0 |
2018-04-18 | Multi-Stage Fracture | 3225.50 | 3227.40 | 0 |
2018-04-18 | Multi-Stage Fracture | 3170.10 | 3172.00 | 0 |
2018-04-18 | Multi-Stage Fracture | 3114.70 | 3116.60 | 0 |
2018-04-18 | Multi-Stage Fracture | 3059.30 | 3061.20 | 0 |
2018-04-18 | Multi-Stage Fracture | 3003.90 | 3005.80 | 0 |
2018-04-18 | Multi-Stage Fracture | 2948.40 | 2950.40 | 0 |
2018-04-18 | Multi-Stage Fracture | 2893.00 | 2894.90 | 0 |
2018-04-18 | Multi-Stage Fracture | 3829.60 | 3831.50 | 0 |
2018-04-18 | Multi-Stage Fracture | 2837.60 | 2839.50 | 0 |
2018-04-18 | Multi-Stage Fracture | 2782.10 | 2784.00 | 0 |
2018-04-18 | Multi-Stage Fracture | 2615.80 | 2617.70 | 0 |
2018-04-18 | Multi-Stage Fracture | 2560.40 | 2562.30 | 0 |
2018-04-18 | Multi-Stage Fracture | 2505.00 | 2506.90 | 0 |
2018-04-18 | Multi-Stage Fracture | 2449.60 | 2451.50 | 0 |
2018-04-18 | Multi-Stage Fracture | 2394.20 | 2396.10 | 0 |
2018-04-18 | Multi-Stage Fracture | 2338.80 | 2340.70 | 0 |
2018-04-18 | Multi-Stage Fracture | 2283.40 | 2285.30 | 0 |
2018-04-18 | Multi-Stage Fracture | 2228.00 | 2229.90 | 0 |
2018-04-18 | Multi-Stage Fracture | 3778.80 | 3780.80 | 0 |
2018-04-18 | Multi-Stage Fracture | 2172.60 | 2174.50 | 0 |
2018-04-18 | Multi-Stage Fracture | 2117.20 | 2119.10 | 0 |
2018-04-18 | Multi-Stage Fracture | 2061.80 | 2063.70 | 0 |
2018-04-18 | Multi-Stage Fracture | 2006.30 | 2008.20 | 0 |
2018-04-18 | Multi-Stage Fracture | 1950.90 | 1952.80 | 0 |
2018-04-18 | Multi-Stage Fracture | 1895.40 | 1897.30 | 0 |
2018-04-18 | Multi-Stage Fracture | 1840.00 | 1841.90 | 0 |
2018-04-19 | Multi-Stage Fracture | 1784.20 | 1786.10 | 0 |
2018-04-19 | Multi-Stage Fracture | 1728.70 | 1730.60 | 0 |
2018-04-19 | Multi-Stage Fracture | 1673.30 | 1675.20 | 0 |
2018-04-18 | Multi-Stage Fracture | 3724.40 | 3726.40 | 0 |
2018-04-19 | Multi-Stage Fracture | 1630.00 | 1631.90 | 0 |
2018-04-18 | Multi-Stage Fracture | 3669.00 | 3670.90 | 0 |
2018-04-18 | Multi-Stage Fracture | 3613.60 | 3615.50 | 0 |
2018-04-18 | Multi-Stage Fracture | 3558.10 | 3560.00 | 0 |
2018-04-18 | Multi-Stage Fracture | 3502.60 | 3504.60 | 0 |
2018-04-18 | Multi-Stage Fracture | 3447.20 | 3449.10 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-04-18 | 2018-04-19 | 1,429 | 3,339 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 83.9873 | N/A | |||
Sand - Tier 2 (20/40) | Trican | silica crystalline | 14808-60-7 | 100 | 11.1315 | N/A | ||
Sand - Tier 2 (30/50) | Trican | silica crystalline | 14808-60-7 | 100 | 5.0893 | N/A | ||
AQUCAR DB20 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0199 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0199 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0199 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0199 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0199 | N/A | ||||
CC-7 | Trican | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.0897 | N/A | |
water | Not Available | 100 | 0.0897 | N/A | ||||
FR-22 | Trican | Friction Reducer | alcohols. C10-16. ethoxylated | 68002-97-1 | 100 | 0.0466 | N/A | |
distillates (petroleum). hydrotreated light naphthenic | 64742-53-6 | 100 | 0.0466 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0466 | N/A | ||||
NMR-1 | Trican | Surfactant | methanol | 67-56-1 | 100 | 0.0409 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.0409 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-04-16 | 2018-04-20 | Surface Water - Runoff | 3509 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 5443 | 0.0 | 0.0 | 0.0 |
2019 | 8347 | 0.0 | 0.0 | 0.0 |
2020 | 2149 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-04-03 | No Incident Encountered | 0.00 | 0.00 |
2018-04-19 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]