X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485061511020

Well Details

Well ID: 0485061511020
Loading map...
Location: 02/11-15-048-06W5/0
Location Alias: 02/11-15-48-06 W5M
Location Alias 2: 02/11-15-048-06 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 06
Section: 15
County/Municipality: Brazeau County
Well Name: BONTERRA 102 HZ PEMBINA 11-15-48-6
Operator Name: Bonterra Energy Corp.
License Number: 0488603
License Date: 2018-03-16
License Status: Issued
Spud Date: 2018-03-27
Final Drill Date: 2018-04-02
Well Total Depth: 3860.00 m
Surface Hole Latitude: 53.147080
Surface Hole Longitude: -114.833271

For data sources see[1][2]

Well History

Date Event
2018-03-16 Obtained License
2018-03-28 Direction Drilling Operation Performed - Deviate
2018-03-28 Surface Casing Operation Performed
2018-03-29 Direction Drilling Operation Performed - Horizontal
2018-04-02 Finished Drilling
2018-04-02 Well Log Performed
2018-04-02 Well Mode changed to Drilled and Cased
2018-04-03 Production Casing Operation Performed
2018-04-03 Rig Released
2018-04-18 Perforation Treatment Performed - Multi-Stage Fracture
2018-04-19 Perforation Treatment Performed - Multi-Stage Fracture
2018-04-27 Well Began Production
2018-04-27 Well Fluid changed to Crude Oil
2018-04-27 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-03-27 Ironhand Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-03-28 730.10 Deviate (5 - 79 degrees)
2018-03-29 1597.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-04-18 Multi-Stage Fracture 3843.90 3844.50 0
2018-04-18 Multi-Stage Fracture 3391.80 3393.70 0
2018-04-18 Multi-Stage Fracture 3336.30 3338.20 0
2018-04-18 Multi-Stage Fracture 3281.00 3282.90 0
2018-04-18 Multi-Stage Fracture 3225.50 3227.40 0
2018-04-18 Multi-Stage Fracture 3170.10 3172.00 0
2018-04-18 Multi-Stage Fracture 3114.70 3116.60 0
2018-04-18 Multi-Stage Fracture 3059.30 3061.20 0
2018-04-18 Multi-Stage Fracture 3003.90 3005.80 0
2018-04-18 Multi-Stage Fracture 2948.40 2950.40 0
2018-04-18 Multi-Stage Fracture 2893.00 2894.90 0
2018-04-18 Multi-Stage Fracture 3829.60 3831.50 0
2018-04-18 Multi-Stage Fracture 2837.60 2839.50 0
2018-04-18 Multi-Stage Fracture 2782.10 2784.00 0
2018-04-18 Multi-Stage Fracture 2615.80 2617.70 0
2018-04-18 Multi-Stage Fracture 2560.40 2562.30 0
2018-04-18 Multi-Stage Fracture 2505.00 2506.90 0
2018-04-18 Multi-Stage Fracture 2449.60 2451.50 0
2018-04-18 Multi-Stage Fracture 2394.20 2396.10 0
2018-04-18 Multi-Stage Fracture 2338.80 2340.70 0
2018-04-18 Multi-Stage Fracture 2283.40 2285.30 0
2018-04-18 Multi-Stage Fracture 2228.00 2229.90 0
2018-04-18 Multi-Stage Fracture 3778.80 3780.80 0
2018-04-18 Multi-Stage Fracture 2172.60 2174.50 0
2018-04-18 Multi-Stage Fracture 2117.20 2119.10 0
2018-04-18 Multi-Stage Fracture 2061.80 2063.70 0
2018-04-18 Multi-Stage Fracture 2006.30 2008.20 0
2018-04-18 Multi-Stage Fracture 1950.90 1952.80 0
2018-04-18 Multi-Stage Fracture 1895.40 1897.30 0
2018-04-18 Multi-Stage Fracture 1840.00 1841.90 0
2018-04-19 Multi-Stage Fracture 1784.20 1786.10 0
2018-04-19 Multi-Stage Fracture 1728.70 1730.60 0
2018-04-19 Multi-Stage Fracture 1673.30 1675.20 0
2018-04-18 Multi-Stage Fracture 3724.40 3726.40 0
2018-04-19 Multi-Stage Fracture 1630.00 1631.90 0
2018-04-18 Multi-Stage Fracture 3669.00 3670.90 0
2018-04-18 Multi-Stage Fracture 3613.60 3615.50 0
2018-04-18 Multi-Stage Fracture 3558.10 3560.00 0
2018-04-18 Multi-Stage Fracture 3502.60 3504.60 0
2018-04-18 Multi-Stage Fracture 3447.20 3449.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-04-18 2018-04-19 1,429 3,339 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 83.9873 N/A
Sand - Tier 2 (20/40) Trican silica crystalline 14808-60-7 100 11.1315 N/A
Sand - Tier 2 (30/50) Trican silica crystalline 14808-60-7 100 5.0893 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0199 N/A
dibromoacetonitrile 3252-43-5 100 0.0199 N/A
non-hazardous ingredients Not Available 100 0.0199 N/A
polyethylene glycol 25322-68-3 100 0.0199 N/A
sodium bromide 7647-15-6 100 0.0199 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0897 N/A
water Not Available 100 0.0897 N/A
FR-22 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0466 N/A
distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0466 N/A
non-hazardous ingredients Not Available 100 0.0466 N/A
NMR-1 Trican Surfactant methanol 67-56-1 100 0.0409 N/A
non-hazardous ingredients Not Available 100 0.0409 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-04-16 2018-04-20 Surface Water - Runoff 3509

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 5443 0.0 0.0 0.0
2019 8347 0.0 0.0 0.0
2020 2149 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-04-03 No Incident Encountered 0.00 0.00
2018-04-19 No Incident Encountered 0.00 0.00

For data sources see[10]

References