If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485061016040 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.111328,"lon":-114.78379,"icon":""}]} |
Location: 04/16-10-048-06W5/0 | |
Location Alias: 04/16-10-48-06 W5M | |
Location Alias 2: 04/16-10-048-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 06 | |
Section: 10 | |
County/Municipality: Brazeau County | |
Well Name: BONTERRA 104 HZ PEMBINA 16-10-48-6 | |
Operator Name: Bonterra Energy Corp. | |
License Number: 0480015 | |
License Date: 2016-08-03 | |
License Status: Issued | |
Spud Date: 2016-08-25 | |
Final Drill Date: 2016-08-31 | |
Well Total Depth: 3876.00 m | |
Surface Hole Latitude: 53.111328 | |
Surface Hole Longitude: -114.783790 |
Date | Event |
---|---|
2016-08-03 | Obtained License |
2016-08-26 | Direction Drilling Operation Performed - Deviate |
2016-08-26 | Surface Casing Operation Performed |
2016-08-28 | Direction Drilling Operation Performed - Horizontal |
2016-08-31 | Finished Drilling |
2016-08-31 | Well Log Performed |
2016-08-31 | Well Mode changed to Drilled and Cased |
2016-09-02 | Production Casing Operation Performed |
2016-09-02 | Rig Released |
2016-10-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-10-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-11-11 | Well Began Production |
2016-11-11 | Well Fluid changed to Crude Oil |
2016-11-11 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2016-08-25 | Ironhand Drilling Inc. | 1 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2016-08-26 | 458.60 | Deviate (5 - 79 degrees) |
2016-08-28 | 1588.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2016-10-25 | Multi-Stage Fracture | 3819.40 | 3819.90 | 0 |
2016-10-25 | Multi-Stage Fracture | 3328.40 | 3330.30 | 0 |
2016-10-25 | Multi-Stage Fracture | 3274.80 | 3276.70 | 0 |
2016-10-25 | Multi-Stage Fracture | 3221.60 | 3223.50 | 0 |
2016-10-25 | Multi-Stage Fracture | 3168.20 | 3170.10 | 0 |
2016-10-25 | Multi-Stage Fracture | 3114.10 | 3116.00 | 0 |
2016-10-25 | Multi-Stage Fracture | 3059.30 | 3061.10 | 0 |
2016-10-25 | Multi-Stage Fracture | 3004.00 | 3005.90 | 0 |
2016-10-25 | Multi-Stage Fracture | 2948.80 | 2950.70 | 0 |
2016-10-25 | Multi-Stage Fracture | 2893.60 | 2895.50 | 0 |
2016-10-25 | Multi-Stage Fracture | 2838.20 | 2840.10 | 0 |
2016-10-25 | Multi-Stage Fracture | 3761.50 | 3763.40 | 0 |
2016-10-25 | Multi-Stage Fracture | 2782.80 | 2784.60 | 0 |
2016-10-25 | Multi-Stage Fracture | 2723.60 | 2725.50 | 0 |
2016-10-25 | Multi-Stage Fracture | 2666.30 | 2668.20 | 0 |
2016-10-25 | Multi-Stage Fracture | 2611.20 | 2613.10 | 0 |
2016-10-25 | Multi-Stage Fracture | 2554.00 | 2555.90 | 0 |
2016-10-25 | Multi-Stage Fracture | 2494.80 | 2496.60 | 0 |
2016-10-25 | Multi-Stage Fracture | 2448.90 | 2450.80 | 0 |
2016-10-26 | Multi-Stage Fracture | 2389.70 | 2391.60 | 0 |
2016-10-26 | Multi-Stage Fracture | 2332.40 | 2334.20 | 0 |
2016-10-26 | Multi-Stage Fracture | 2275.10 | 2277.00 | 0 |
2016-10-25 | Multi-Stage Fracture | 3704.20 | 3706.10 | 0 |
2016-10-26 | Multi-Stage Fracture | 2229.50 | 2231.40 | 0 |
2016-10-26 | Multi-Stage Fracture | 2170.30 | 2172.20 | 0 |
2016-10-26 | Multi-Stage Fracture | 2124.40 | 2126.30 | 0 |
2016-10-26 | Multi-Stage Fracture | 2065.20 | 2067.10 | 0 |
2016-10-26 | Multi-Stage Fracture | 2019.60 | 2021.40 | 0 |
2016-10-26 | Multi-Stage Fracture | 1960.30 | 1962.20 | 0 |
2016-10-26 | Multi-Stage Fracture | 1914.80 | 1916.70 | 0 |
2016-10-26 | Multi-Stage Fracture | 1855.40 | 1857.30 | 0 |
2016-10-26 | Multi-Stage Fracture | 1809.70 | 1811.60 | 0 |
2016-10-26 | Multi-Stage Fracture | 1763.90 | 1765.80 | 0 |
2016-10-25 | Multi-Stage Fracture | 3647.10 | 3649.00 | 0 |
2016-10-26 | Multi-Stage Fracture | 1718.30 | 1720.20 | 0 |
2016-10-26 | Multi-Stage Fracture | 1672.50 | 1674.40 | 0 |
2016-10-26 | Multi-Stage Fracture | 1628.80 | 1630.70 | 0 |
2016-10-26 | Multi-Stage Fracture | 1583.20 | 1585.10 | 0 |
2016-10-25 | Multi-Stage Fracture | 3593.90 | 3595.80 | 0 |
2016-10-25 | Multi-Stage Fracture | 3541.40 | 3543.30 | 0 |
2016-10-25 | Multi-Stage Fracture | 3488.10 | 3490.00 | 0 |
2016-10-25 | Multi-Stage Fracture | 3434.70 | 3436.60 | 0 |
2016-10-25 | Multi-Stage Fracture | 3381.30 | 3383.20 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-10-25 | 2016-10-26 | 1,448 | 5,004 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 87.6049 | N/A | |||
Sand - Tier 2 (20/40) | Trican | silica crystalline | 14808-60-7 | 100 | 4.494 | N/A | ||
Sand - Tier 2 (30/50) | Trican | silica crystalline | 14808-60-7 | 100 | 7.8261 | N/A | ||
AQUCAR DB20 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0104 | N/A | |
2-mercaptoethanol | 60-24-2 | 100 | 0.0104 | N/A | ||||
dibromoacetonitrile | 3252-43-5 | 100 | 0.0104 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0104 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0104 | N/A | ||||
CC-7 | Trican | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.0935 | N/A | |
water | Not Available | 100 | 0.0935 | N/A | ||||
DF-1 | Trican | Defoamer | non-hazardous ingredients | Not Available | 100 | 0.0043 | N/A | |
GNE-2 | Trican | Demulsifier | non-hazardous ingredients | Not Available | 100 | 0.0446 | N/A | |
propylene glycol | 57-55-6 | 100 | 0.0446 | N/A | ||||
GFR-5D | Trican | Friction Reducer | anionic polyacrylamide | Not Available | 100 | 0.0262 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2016-10-25 | 2016-10-31 | Surface Water - Runoff | 3335 |
2016-10-25 | 2016-10-31 | Oilfield Produced Water | 1791 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2016 | 1165 | 0.0 | 0.0 | 0.0 |
2017 | 8416 | 0.0 | 0.0 | 0.0 |
2018 | 8625 | 0.0 | 0.0 | 0.0 |
2019 | 8690 | 0.0 | 0.0 | 0.0 |
2020 | 2149 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-09-02 | No Incident Encountered | 0.00 | 0.00 |
2016-10-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]