If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485061015000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.111329,"lon":-114.784163,"icon":""}]} |
Location: 00/15-10-048-06W5/0 | |
Location Alias: 00/15-10-48-06 W5M | |
Location Alias 2: 00/15-10-048-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 06 | |
Section: 10 | |
County/Municipality: Brazeau County | |
Well Name: BONTERRA HZ PEMBINA 15-10-48-6 | |
Operator Name: Bonterra Energy Corp. | |
License Number: 0480016 | |
License Date: 2016-08-03 | |
License Status: Issued | |
Spud Date: 2016-08-06 | |
Final Drill Date: 2016-08-14 | |
Well Total Depth: 4005.00 m | |
Surface Hole Latitude: 53.111329 | |
Surface Hole Longitude: -114.784163 |
Date | Event |
---|---|
2016-08-03 | Obtained License |
2016-08-07 | Surface Casing Operation Performed |
2016-08-08 | Direction Drilling Operation Performed - Deviate |
2016-08-09 | Direction Drilling Operation Performed - Horizontal |
2016-08-14 | Finished Drilling |
2016-08-14 | Well Mode changed to Drilled and Cased |
2016-08-15 | Production Casing Operation Performed |
2016-08-16 | Rig Released |
2016-10-20 | Well Log Performed |
2016-10-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-10-31 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-11-11 | Well Began Production |
2016-11-11 | Well Fluid changed to Crude Oil |
2016-11-11 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2016-08-06 | Ironhand Drilling Inc. | 1 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2016-08-08 | 858.30 | Deviate (5 - 79 degrees) |
2016-08-09 | 1628.70 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2016-10-30 | Multi-Stage Fracture | 3966.90 | 3967.50 | 0 |
2016-10-30 | Multi-Stage Fracture | 3485.70 | 3487.60 | 0 |
2016-10-30 | Multi-Stage Fracture | 3432.00 | 3433.90 | 0 |
2016-10-30 | Multi-Stage Fracture | 3378.40 | 3380.20 | 0 |
2016-10-30 | Multi-Stage Fracture | 3324.70 | 3326.50 | 0 |
2016-10-30 | Multi-Stage Fracture | 3271.40 | 3273.20 | 0 |
2016-10-30 | Multi-Stage Fracture | 3217.90 | 3219.70 | 0 |
2016-10-30 | Multi-Stage Fracture | 3164.10 | 3165.90 | 0 |
2016-10-30 | Multi-Stage Fracture | 3110.00 | 3111.90 | 0 |
2016-10-30 | Multi-Stage Fracture | 3055.70 | 3057.50 | 0 |
2016-10-30 | Multi-Stage Fracture | 3002.50 | 3004.30 | 0 |
2016-10-30 | Multi-Stage Fracture | 3914.60 | 3916.50 | 0 |
2016-10-30 | Multi-Stage Fracture | 2948.60 | 2950.40 | 0 |
2016-10-30 | Multi-Stage Fracture | 2893.90 | 2895.80 | 0 |
2016-10-30 | Multi-Stage Fracture | 2839.60 | 2841.40 | 0 |
2016-10-30 | Multi-Stage Fracture | 2785.50 | 2787.40 | 0 |
2016-10-31 | Multi-Stage Fracture | 2732.20 | 2734.00 | 0 |
2016-10-31 | Multi-Stage Fracture | 2679.00 | 2680.80 | 0 |
2016-10-31 | Multi-Stage Fracture | 2625.40 | 2627.30 | 0 |
2016-10-31 | Multi-Stage Fracture | 2571.40 | 2573.20 | 0 |
2016-10-31 | Multi-Stage Fracture | 2518.50 | 2520.30 | 0 |
2016-10-31 | Multi-Stage Fracture | 2465.10 | 2466.90 | 0 |
2016-10-30 | Multi-Stage Fracture | 3860.30 | 3862.20 | 0 |
2016-10-31 | Multi-Stage Fracture | 2411.60 | 2413.40 | 0 |
2016-10-31 | Multi-Stage Fracture | 2359.60 | 2361.50 | 0 |
2016-10-31 | Multi-Stage Fracture | 2305.40 | 2307.20 | 0 |
2016-10-31 | Multi-Stage Fracture | 2251.00 | 2252.80 | 0 |
2016-10-31 | Multi-Stage Fracture | 2197.50 | 2199.30 | 0 |
2016-10-31 | Multi-Stage Fracture | 2143.80 | 2145.60 | 0 |
2016-10-31 | Multi-Stage Fracture | 2089.90 | 2091.70 | 0 |
2016-10-31 | Multi-Stage Fracture | 2036.80 | 2038.60 | 0 |
2016-10-31 | Multi-Stage Fracture | 1983.50 | 1985.40 | 0 |
2016-10-31 | Multi-Stage Fracture | 1929.80 | 1931.70 | 0 |
2016-10-30 | Multi-Stage Fracture | 3806.70 | 3808.50 | 0 |
2016-10-31 | Multi-Stage Fracture | 1875.50 | 1877.40 | 0 |
2016-10-31 | Multi-Stage Fracture | 1821.70 | 1823.50 | 0 |
2016-10-31 | Multi-Stage Fracture | 1768.10 | 1769.90 | 0 |
2016-10-31 | Multi-Stage Fracture | 1713.80 | 1715.70 | 0 |
2016-10-31 | Multi-Stage Fracture | 1660.40 | 1662.20 | 0 |
2016-10-30 | Multi-Stage Fracture | 3753.30 | 3755.20 | 0 |
2016-10-30 | Multi-Stage Fracture | 3700.00 | 3701.80 | 0 |
2016-10-30 | Multi-Stage Fracture | 3646.30 | 3648.10 | 0 |
2016-10-30 | Multi-Stage Fracture | 3592.70 | 3594.60 | 0 |
2016-10-30 | Multi-Stage Fracture | 3539.40 | 3541.20 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-10-30 | 2016-10-31 | 1,453 | 3,673 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 83.8657 | N/A | |||
Sand - Tier 2 (20/40) | Trican | silica crystalline | 14808-60-7 | 100 | 8.1531 | N/A | ||
Sand - Tier 2 (30/50) | Trican | silica crystalline | 14808-60-7 | 100 | 7.8093 | N/A | ||
AQUCAR DB20 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0099 | N/A | |
2-mercaptoethanol | 60-24-2 | 100 | 0.0099 | N/A | ||||
dibromoacetonitrile | 3252-43-5 | 100 | 0.0099 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0099 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0099 | N/A | ||||
CC-7 | Trican | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.0895 | N/A | |
water | Not Available | 100 | 0.0895 | N/A | ||||
DF-1 | Trican | Defoamer | non-hazardous ingredients | Not Available | 100 | 0.0041 | N/A | |
GNE-2 | Trican | Demulsifier | non-hazardous ingredients | Not Available | 100 | 0.0427 | N/A | |
propylene glycol | 57-55-6 | 100 | 0.0427 | N/A | ||||
GFR-5D | Trican | Friction Reducer | anionic polyacrylamide | Not Available | 100 | 0.0251 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2016-10-25 | 2016-10-31 | Oilfield Produced Water | 1791 |
2016-10-03 | 2016-10-05 | Surface Water - Runoff | 1959 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2016 | 1034 | 0.0 | 0.0 | 0.0 |
2017 | 8529 | 0.0 | 0.0 | 0.0 |
2018 | 8423 | 0.0 | 0.0 | 0.0 |
2019 | 8690 | 0.0 | 0.0 | 0.0 |
2020 | 2149 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-08-16 | No Incident Encountered | 0.00 | 0.00 |
2016-10-31 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]