X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485060913000

Well Details

Well ID: 0485060913000
Loading map...
Location: 00/13-09-048-06W5/0
Location Alias: 00/13-09-48-06 W5M
Location Alias 2: 00/13-09-048-06 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 06
Section: 09
County/Municipality: Brazeau County
Well Name: SHINEBK PEM 13-9-48-6
Operator Name: TAQA North Ltd.
License Number: 0199043
License Date: 1997-03-06
License Status: Suspension
Spud Date: 1998-01-09
Final Drill Date: 1998-01-15
Well Total Depth: 2007.00 m
Surface Hole Latitude: 53.130599
Surface Hole Longitude: -114.825160

For data sources see[1][2]

Well History

Date Event
1997-03-06 Obtained License
1998-01-09 Surface Casing Operation Performed
1998-01-15 Finished Drilling
1998-01-15 Well Mode changed to Drilled and Cased
1998-01-16 Well Log Performed
1998-01-18 Drill Stem Test Performed
1998-01-19 Drill Stem Test Performed
1998-01-21 Production Casing Operation Performed
1998-01-21 Rig Released
1998-03-24 Well Log Performed
1998-03-25 Perforation Treatment Performed - Jet Perforation
1998-03-25 Well Log Performed
1998-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-03-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-03-31 Perforation Treatment Performed - Jet Perforation
1998-03-31 Plug Back Performed
1998-03-31 Well Log Performed
1998-04-02 Perforation Treatment Performed - Fractured
1998-04-04 Well Began Production
1998-04-04 Well Fluid changed to Crude Oil
1998-04-04 Well Mode changed to Flowing
2017-02-01 Well Fluid changed to Crude Oil
2017-02-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-03-25 Perforation 1963.00 1965.00 17
1998-03-25 Perforation 1975.00 1976.00 17
1998-03-28 Acid Treatment 1963.00 1976.00 0
1998-03-31 Packing Device Capped w/Cement 1952.00 1960.00 0
1998-03-31 Perforation 1913.00 1915.00 17
1998-04-02 Fracture 1913.00 1915.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 5075 0.0 0.0 0.0
1999 7102 0.0 0.0 0.0
2000 4157 0.0 0.0 0.0
2001 8658 0.0 0.0 0.0
2002 8554 0.0 0.0 0.0
2003 7944 0.0 0.0 0.0
2004 8780 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8726 0.0 0.0 0.0
2007 8390 0.0 0.0 0.0
2008 6600 0.0 0.0 0.0
2009 7712 0.0 0.0 0.0
2010 8748 0.0 0.0 0.0
2011 6383 0.0 0.0 0.0
2012 8055 0.0 0.0 0.0
2013 8592 0.0 0.0 0.0
2014 8472 0.0 0.0 0.0
2015 6503 0.0 0.0 0.0

For data sources see[5]

References