If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485060710000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.143823,"lon":-114.858614,"icon":""}]} |
Location: 00/10-07-048-06W5/0 | |
Location Alias: 00/10-07-48-06 W5M | |
Location Alias 2: 00/10-07-048-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 06 | |
Section: 07 | |
County/Municipality: Brazeau County | |
Well Name: ARC HZ PEMBINA 10-7-48-6 | |
Operator Name: ARC Resources Ltd. | |
License Number: 0459870 | |
License Date: 2013-10-04 | |
License Status: Issued | |
Spud Date: 2013-12-11 | |
Final Drill Date: 2013-12-19 | |
Well Total Depth: 3243.00 m | |
Surface Hole Latitude: 53.143823 | |
Surface Hole Longitude: -114.858614 |
Date | Event |
---|---|
2013-10-04 | Obtained License |
2013-12-12 | Surface Casing Operation Performed |
2013-12-14 | Direction Drilling Operation Performed - Deviate |
2013-12-15 | Direction Drilling Operation Performed - Horizontal |
2013-12-16 | Intermediate Casing Operation Performed |
2013-12-19 | Finished Drilling |
2013-12-19 | Liner Casing Operation Performed |
2013-12-19 | Well Log Performed |
2013-12-19 | Well Mode changed to Drilled and Cased |
2013-12-20 | Perforation Treatment Performed - Open-Hole Completion |
2013-12-20 | Rig Released |
2013-12-30 | Well Log Performed |
2014-01-05 | Well Began Production |
2014-01-05 | Well Fluid changed to Crude Oil |
2014-01-05 | Well Mode changed to Flowing |
2014-01-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-02-08 | Well Fluid changed to Crude Oil |
2014-02-08 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-12-11 | Excalibur Drilling Ltd. | 8 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2013-12-14 | 1004.40 | Deviate (5 - 79 degrees) |
2013-12-15 | 1747.10 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-12-20 | Open Hole/Barefoot Completion | 3199.00 | 3243.00 | 0 |
2014-01-08 | Multi-Stage Fracture | 2532.50 | 2532.60 | 0 |
2014-01-08 | Multi-Stage Fracture | 2448.90 | 2449.00 | 0 |
2014-01-08 | Multi-Stage Fracture | 2364.60 | 2364.70 | 0 |
2014-01-08 | Multi-Stage Fracture | 2280.70 | 2280.80 | 0 |
2014-01-08 | Multi-Stage Fracture | 2197.00 | 2197.10 | 0 |
2014-01-08 | Multi-Stage Fracture | 2113.40 | 2113.50 | 0 |
2014-01-08 | Multi-Stage Fracture | 2043.40 | 2043.50 | 0 |
2014-01-08 | Multi-Stage Fracture | 1973.30 | 1973.40 | 0 |
2014-01-08 | Multi-Stage Fracture | 1903.00 | 1903.10 | 0 |
2014-01-08 | Multi-Stage Fracture | 3194.40 | 3194.50 | 0 |
2014-01-08 | Multi-Stage Fracture | 3120.50 | 3120.60 | 0 |
2014-01-08 | Multi-Stage Fracture | 3036.40 | 3036.50 | 0 |
2014-01-08 | Multi-Stage Fracture | 2952.20 | 2952.30 | 0 |
2014-01-08 | Multi-Stage Fracture | 2868.40 | 2868.50 | 0 |
2014-01-08 | Multi-Stage Fracture | 2784.70 | 2784.80 | 0 |
2014-01-08 | Multi-Stage Fracture | 2700.50 | 2700.60 | 0 |
2014-01-08 | Multi-Stage Fracture | 2616.60 | 2616.70 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-01-08 | 2014-01-08 | 1,468 | 542 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Nitrogen | 7727-37-9 | 100 | 18.6413 | N/A | |||
Water | Not Available | 100 | 48.664 | N/A | ||||
20/40 | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 30.5103 | N/A | ||
50/140 | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 1.5255 | N/A | ||
B-1008 | Sanjel | Bactericide/Biocide | BNPD | 52-51-7 | 100 | 0.0055 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.0055 | N/A | ||||
Breaker-1Z | Sanjel | Breaker | Cellulase enzyme | 9012-54-8 | 100 | 0.0076 | N/A | |
Ethylene Glycol | 107-21-1 | 100 | 0.0033 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0011 | N/A | ||||
Water | Not Available | 100 | 0.0013 | N/A | ||||
BUFFER-A | Sanjel | Buffer | Acetic Acid | 64-19-7 | 100 | 0.0974 | N/A | |
Water | Not Available | 100 | 0.0974 | N/A | ||||
SCC-6L | Sanjel | Clay Control | 1.6-Hexanediamine dihydrochloride | 6055-52-3 | 100 | 0.0974 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.0974 | N/A | ||||
FA-1 | Sanjel | Foamer | Ammonium C8-10 Alcohol | 68891-29-2 | 100 | 0.1833 | N/A | |
Ethanol | 64-17-5 | 100 | 0.1833 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.1833 | N/A | ||||
WG-6ZL | Sanjel | Gelling Agent | Polysaccharide Suspension | Not Available | 100 | 0.2494 | N/A | |
NE-5 | Sanjel | Surfactant | Alkyl benzenesulfonic acid | 68584-22-5 | 100 | 0.024 | N/A | |
Diethylenetriamine | 111-40-0 | 100 | 0.024 | N/A | ||||
Isopropyl Alcohol | 67-63-0 | 100 | 0.024 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.024 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-01-05 | 2014-01-06 | Surface Water - River | 152 |
2014-01-05 | 2014-01-06 | Surface Water - River | 366 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 7788 | 0.0 | 0.0 | 0.0 |
2015 | 8076 | 0.0 | 0.0 | 0.0 |
2016 | 7511 | 0.0 | 0.0 | 0.0 |
2017 | 8097 | 0.0 | 0.0 | 0.0 |
2018 | 7168 | 0.0 | 0.0 | 0.0 |
2019 | 7682 | 0.0 | 0.0 | 0.0 |
2020 | 2111 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-12-20 | No Incident Encountered | 0.00 | 0.00 |
2014-01-20 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]