If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485051904020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.148032,"lon":-114.706757,"icon":""}]} |
Location: 02/04-19-048-05W5/0 | |
Location Alias: 02/04-19-48-05 W5M | |
Location Alias 2: 02/04-19-048-05 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 05 | |
Section: 19 | |
County/Municipality: Brazeau County | |
Well Name: SDEL 102 HZ PEMBINA 4-19-48-5 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0447789 | |
License Date: 2012-08-15 | |
License Status: Suspension | |
Spud Date: 2012-08-27 | |
Final Drill Date: 2012-09-01 | |
Well Total Depth: 3120.00 m | |
Surface Hole Latitude: 53.148032 | |
Surface Hole Longitude: -114.706757 |
Date | Event |
---|---|
2012-08-15 | Obtained License |
2012-08-28 | Surface Casing Operation Performed |
2012-08-28 | Well Log Performed |
2012-08-29 | Direction Drilling Operation Performed - Deviate |
2012-08-29 | Kick Occurred |
2012-08-29 | Lost Circulation Occurred |
2012-08-30 | Direction Drilling Operation Performed - Horizontal |
2012-08-30 | Well Log Performed |
2012-09-01 | Finished Drilling |
2012-09-01 | Well Log Performed |
2012-09-01 | Well Mode changed to Drilled and Cased |
2012-09-03 | Production Casing Operation Performed |
2012-09-03 | Rig Released |
2012-09-10 | Well Log Performed |
2012-09-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-09-13 | Perforation Treatment Performed - Open-Hole Completion |
2012-09-13 | Well Began Production |
2012-09-13 | Well Fluid changed to Crude Oil |
2012-09-13 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-08-27 | Nabors Drilling Limited | 3 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-08-29 | 979.70 | Deviate (5 - 79 degrees) |
2012-08-30 | 1599.20 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-09-13 | Open Hole/Barefoot Completion | 3117.00 | 3120.00 | 0 |
2012-09-13 | Multi-Stage Fracture | 2495.70 | 2495.80 | 0 |
2012-09-13 | Multi-Stage Fracture | 2421.90 | 2422.00 | 0 |
2012-09-13 | Multi-Stage Fracture | 2348.10 | 2348.20 | 0 |
2012-09-13 | Multi-Stage Fracture | 2274.20 | 2274.30 | 0 |
2012-09-13 | Multi-Stage Fracture | 2200.10 | 2200.20 | 0 |
2012-09-13 | Multi-Stage Fracture | 2126.00 | 2126.10 | 0 |
2012-09-13 | Multi-Stage Fracture | 2051.80 | 2051.90 | 0 |
2012-09-13 | Multi-Stage Fracture | 1977.90 | 1978.00 | 0 |
2012-09-13 | Multi-Stage Fracture | 1903.60 | 1903.70 | 0 |
2012-09-13 | Multi-Stage Fracture | 1829.80 | 1829.90 | 0 |
2012-09-13 | Multi-Stage Fracture | 3082.60 | 3082.70 | 0 |
2012-09-13 | Multi-Stage Fracture | 1757.20 | 1757.30 | 0 |
2012-09-13 | Multi-Stage Fracture | 3013.60 | 3013.70 | 0 |
2012-09-13 | Multi-Stage Fracture | 2936.70 | 2936.80 | 0 |
2012-09-13 | Multi-Stage Fracture | 2865.70 | 2865.80 | 0 |
2012-09-13 | Multi-Stage Fracture | 2791.30 | 2791.40 | 0 |
2012-09-13 | Multi-Stage Fracture | 2717.70 | 2717.80 | 0 |
2012-09-13 | Multi-Stage Fracture | 2643.40 | 2643.50 | 0 |
2012-09-13 | Multi-Stage Fracture | 2569.80 | 2569.90 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 2465 | 0.0 | 0.0 | 0.0 |
2013 | 7788 | 0.0 | 0.0 | 0.0 |
2014 | 8335 | 0.0 | 0.0 | 0.0 |
2015 | 6467 | 0.0 | 0.0 | 0.0 |
2016 | 312 | 0.0 | 0.0 | 0.0 |
2017 | 660 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-08-29 | Lost Circulation | 1219.00 | 1219.00 |
2012-08-29 | Kick | 1219.00 | 1219.00 |
2012-09-18 | No Incident Encountered | 0.00 | 0.00 |
2013-02-14 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]