X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485051814020

Well Details

Well ID: 0485051814020
Loading map...
Location: 02/14-18-048-05W5/0
Location Alias: 02/14-18-48-05 W5M
Location Alias 2: 02/14-18-048-05 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 05
Section: 18
County/Municipality: Brazeau County
Well Name: BAYTEX HZ PEMBINA 14-18-48-5
Operator Name: Baytex Energy Ltd.
License Number: 0415366
License Date: 2009-12-09
License Status: Amended
Spud Date: 2009-12-29
Final Drill Date: 2010-01-08
Well Total Depth: 2599.00 m
Surface Hole Latitude: 53.144226
Surface Hole Longitude: -114.706936

For data sources see[1][2]

Well History

Date Event
2009-12-09 Obtained License
2009-12-29 Surface Casing Operation Performed
2010-01-01 Direction Drilling Operation Performed - Horizontal
2010-01-04 Well Log Performed
2010-01-05 Intermediate Casing Operation Performed
2010-01-05 Well Log Performed
2010-01-08 Finished Drilling
2010-01-08 Well Log Performed
2010-01-08 Well Mode changed to Drilled and Cased
2010-01-21 Liner Casing Operation Performed
2010-01-23 Rig Released
2010-02-01 Perforation Treatment Performed - Fractured
2010-02-01 Perforation Treatment Performed - Jet Perforation
2010-02-01 Perforation Treatment Performed - Multi-Stage Fracture
2010-08-14 Well Began Production
2010-08-14 Well Fluid changed to Crude Oil
2010-08-14 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-01-01 987.90 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-02-01 Perforation 1717.80 2590.00 1
2010-02-01 Multi-Stage Fracture 1885.90 1886.00 0
2010-02-01 Multi-Stage Fracture 1795.40 1795.50 0
2010-02-01 Multi-Stage Fracture 1717.70 1717.80 0
2010-02-01 Fracture 1717.80 2590.00 0
2010-02-01 Multi-Stage Fracture 2590.00 2590.10 0
2010-02-01 Multi-Stage Fracture 2493.20 2493.30 0
2010-02-01 Multi-Stage Fracture 2400.00 2400.10 0
2010-02-01 Multi-Stage Fracture 2291.20 2291.30 0
2010-02-01 Multi-Stage Fracture 2201.20 2201.30 0
2010-02-01 Multi-Stage Fracture 2096.00 2096.10 0
2010-02-01 Multi-Stage Fracture 1979.20 1979.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 2822 0.0 0.0 0.0
2011 7203 0.0 0.0 0.0
2012 8655 0.0 0.0 0.0
2013 8651 0.0 0.0 0.0
2014 7847 0.0 0.0 0.0
2015 7458 0.0 0.0 0.0
2016 8280 0.0 0.0 0.0
2017 8168 0.0 0.0 0.0
2018 8321 0.0 0.0 0.0
2019 7213 0.0 0.0 0.0
2020 1981 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-02-10 No Incident Encountered 0.00 0.00

For data sources see[7]

References