X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485051812000

Well Details

Well ID: 0485051812000
Loading map...
Location: 00/12-18-048-05W5/0
Location Alias: 00/12-18-48-05 W5M
Location Alias 2: 00/12-18-048-05 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 05
Section: 18
County/Municipality: Brazeau County
Well Name: BAYTEX HZ PEMBINA 12-18-48-5
Operator Name: Baytex Energy Ltd.
License Number: 0422243
License Date: 2010-07-28
License Status: Issued
Spud Date: 2011-01-28
Final Drill Date: 2011-02-06
Well Total Depth: 3006.00 m
Surface Hole Latitude: 53.144081
Surface Hole Longitude: -114.706942

For data sources see[1][2]

Well History

Date Event
2010-07-28 Obtained License
2011-01-29 Surface Casing Operation Performed
2011-01-30 Well Log Performed
2011-01-31 Direction Drilling Operation Performed - Horizontal
2011-02-03 Intermediate Casing Operation Performed
2011-02-03 Well Log Performed
2011-02-06 Finished Drilling
2011-02-06 Well Mode changed to Drilled and Cased
2011-02-07 Liner Casing Operation Performed
2011-02-08 Rig Released
2011-02-25 Perforation Treatment Performed - Multi-Stage Fracture
2011-03-15 Well Began Production
2011-03-15 Well Fluid changed to Crude Oil
2011-03-15 Well Mode changed to Flowing
2011-06-02 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-01-31 1002.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-02-25 Multi-Stage Fracture 3000.30 3000.40 0
2011-02-25 Multi-Stage Fracture 2102.90 2103.00 0
2011-02-25 Multi-Stage Fracture 2003.80 2003.90 0
2011-02-25 Multi-Stage Fracture 1906.50 1906.60 0
2011-02-25 Multi-Stage Fracture 1794.80 1794.90 0
2011-02-25 Multi-Stage Fracture 1696.60 1696.70 0
2011-02-25 Multi-Stage Fracture 1626.50 1626.60 0
2011-02-25 Multi-Stage Fracture 2901.70 2901.80 0
2011-02-25 Multi-Stage Fracture 2804.20 2804.30 0
2011-02-25 Multi-Stage Fracture 2693.90 2694.00 0
2011-02-25 Multi-Stage Fracture 2598.50 2598.60 0
2011-02-25 Multi-Stage Fracture 2503.80 2503.90 0
2011-02-25 Multi-Stage Fracture 2405.80 2405.90 0
2011-02-25 Multi-Stage Fracture 2294.50 2294.60 0
2011-02-25 Multi-Stage Fracture 2200.50 2200.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 6386 0.0 0.0 0.0
2012 8708 0.0 0.0 0.0
2013 8627 0.0 0.0 0.0
2014 8085 0.0 0.0 0.0
2015 7306 0.0 0.0 0.0
2016 8306 0.0 0.0 0.0
2017 8383 0.0 0.0 0.0
2018 8449 0.0 0.0 0.0
2019 7515 0.0 0.0 0.0
2020 2072 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-03-10 No Incident Encountered 0.00 0.00

For data sources see[7]

References