X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485051601020

Well Details

Well ID: 0485051601020
Loading map...
Location: 02/01-16-048-05W5/0
Location Alias: 02/01-16-48-05 W5M
Location Alias 2: 02/01-16-048-05 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 05
Section: 16
County/Municipality: Brazeau County
Well Name: SDEL HZ PEMBINA 1-16-48-5
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0443328
License Date: 2012-01-25
License Status: Issued
Spud Date: 2012-02-01
Final Drill Date: 2012-02-07
Well Total Depth: 2467.00 m
Surface Hole Latitude: 53.137433
Surface Hole Longitude: -114.680745

For data sources see[1][2]

Well History

Date Event
2012-01-25 Obtained License
2012-02-01 Well Log Performed
2012-02-02 Surface Casing Operation Performed
2012-02-04 Direction Drilling Operation Performed - Horizontal
2012-02-07 Finished Drilling
2012-02-07 Well Log Performed
2012-02-07 Well Mode changed to Drilled and Cased
2012-02-09 Production Casing Operation Performed
2012-02-09 Rig Released
2012-02-21 Well Log Performed
2012-03-04 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-04 Perforation Treatment Performed - Open-Hole Completion
2012-03-08 Well Began Production
2012-03-08 Well Fluid changed to Crude Oil
2012-03-08 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-01 Nabors Drilling Limited 3 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-04 1057.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-04 Open Hole/Barefoot Completion 2462.00 2467.00 0
2012-03-04 Multi-Stage Fracture 1971.00 1971.10 0
2012-03-04 Multi-Stage Fracture 1915.30 1915.40 0
2012-03-04 Multi-Stage Fracture 1859.20 1859.30 0
2012-03-04 Multi-Stage Fracture 1803.70 1803.80 0
2012-03-04 Multi-Stage Fracture 1747.70 1747.80 0
2012-03-04 Multi-Stage Fracture 1678.00 1678.10 0
2012-03-04 Multi-Stage Fracture 1620.30 1620.40 0
2012-03-04 Multi-Stage Fracture 1563.30 1563.40 0
2012-03-04 Multi-Stage Fracture 2439.50 2439.60 0
2012-03-04 Multi-Stage Fracture 2375.40 2375.50 0
2012-03-04 Multi-Stage Fracture 2320.50 2320.60 0
2012-03-04 Multi-Stage Fracture 2262.60 2262.70 0
2012-03-04 Multi-Stage Fracture 2206.40 2206.50 0
2012-03-04 Multi-Stage Fracture 2150.30 2150.40 0
2012-03-04 Multi-Stage Fracture 2095.30 2095.40 0
2012-03-04 Multi-Stage Fracture 2027.20 2027.30 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6888 0.0 0.0 0.0
2013 8627 0.0 0.0 0.0
2014 8697 0.0 0.0 0.0
2015 8639 0.0 0.0 0.0
2016 8565 0.0 0.0 0.0
2017 8735 0.0 0.0 0.0
2018 8532 0.0 0.0 0.0
2019 3014 0.0 0.0 0.0

For data sources see[7]

References