If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485050813000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.110214,"lon":-114.707561,"icon":""}]} |
Location: 00/13-08-048-05W5/0 | |
Location Alias: 00/13-08-48-05 W5M | |
Location Alias 2: 00/13-08-048-05 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 05 | |
Section: 08 | |
County/Municipality: Brazeau County | |
Well Name: BONTERRA HZ PEMBINA 13-8-48-5 | |
Operator Name: Bonterra Energy Corp. | |
License Number: 0475586 | |
License Date: 2015-06-01 | |
License Status: Issued | |
Spud Date: 2015-06-03 | |
Final Drill Date: 2015-06-09 | |
Well Total Depth: 3902.00 m | |
Surface Hole Latitude: 53.110214 | |
Surface Hole Longitude: -114.707561 |
Date | Event |
---|---|
2015-06-01 | Obtained License |
2015-06-04 | Surface Casing Operation Performed |
2015-06-05 | Direction Drilling Operation Performed - Deviate |
2015-06-05 | Direction Drilling Operation Performed - Horizontal |
2015-06-09 | Finished Drilling |
2015-06-09 | Well Mode changed to Drilled and Cased |
2015-06-10 | Production Casing Operation Performed |
2015-06-11 | Rig Released |
2015-07-03 | Well Log Performed |
2015-07-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-07-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-07-17 | Well Began Production |
2015-07-17 | Well Fluid changed to Crude Oil |
2015-07-17 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2015-06-03 | Ironhand Drilling Inc. | 1 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2015-06-05 | 1112.90 | Deviate (5 - 79 degrees) |
2015-06-05 | 1560.60 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2015-07-09 | Multi-Stage Fracture | 3872.70 | 3874.20 | 0 |
2015-07-10 | Multi-Stage Fracture | 3373.60 | 3375.40 | 0 |
2015-07-10 | Multi-Stage Fracture | 3314.70 | 3316.50 | 0 |
2015-07-10 | Multi-Stage Fracture | 3255.80 | 3257.60 | 0 |
2015-07-10 | Multi-Stage Fracture | 3196.90 | 3198.80 | 0 |
2015-07-10 | Multi-Stage Fracture | 3151.50 | 3153.40 | 0 |
2015-07-10 | Multi-Stage Fracture | 3092.50 | 3094.40 | 0 |
2015-07-10 | Multi-Stage Fracture | 3033.70 | 3035.50 | 0 |
2015-07-10 | Multi-Stage Fracture | 2974.70 | 2976.60 | 0 |
2015-07-10 | Multi-Stage Fracture | 2915.80 | 2917.70 | 0 |
2015-07-10 | Multi-Stage Fracture | 2856.90 | 2858.80 | 0 |
2015-07-09 | Multi-Stage Fracture | 3829.30 | 3831.10 | 0 |
2015-07-10 | Multi-Stage Fracture | 2811.50 | 2813.40 | 0 |
2015-07-10 | Multi-Stage Fracture | 2752.60 | 2754.50 | 0 |
2015-07-10 | Multi-Stage Fracture | 2693.70 | 2695.60 | 0 |
2015-07-10 | Multi-Stage Fracture | 2634.80 | 2636.70 | 0 |
2015-07-10 | Multi-Stage Fracture | 2575.90 | 2577.80 | 0 |
2015-07-10 | Multi-Stage Fracture | 2517.00 | 2518.90 | 0 |
2015-07-10 | Multi-Stage Fracture | 2474.90 | 2476.80 | 0 |
2015-07-10 | Multi-Stage Fracture | 2416.00 | 2417.90 | 0 |
2015-07-10 | Multi-Stage Fracture | 2357.20 | 2359.10 | 0 |
2015-07-10 | Multi-Stage Fracture | 2298.40 | 2300.30 | 0 |
2015-07-09 | Multi-Stage Fracture | 3770.40 | 3772.30 | 0 |
2015-07-10 | Multi-Stage Fracture | 2239.60 | 2241.40 | 0 |
2015-07-10 | Multi-Stage Fracture | 2180.70 | 2182.50 | 0 |
2015-07-10 | Multi-Stage Fracture | 2135.30 | 2137.20 | 0 |
2015-07-10 | Multi-Stage Fracture | 2076.50 | 2078.40 | 0 |
2015-07-10 | Multi-Stage Fracture | 2019.90 | 2021.80 | 0 |
2015-07-10 | Multi-Stage Fracture | 1961.00 | 1962.80 | 0 |
2015-07-10 | Multi-Stage Fracture | 1902.10 | 1904.00 | 0 |
2015-07-10 | Multi-Stage Fracture | 1843.20 | 1845.10 | 0 |
2015-07-10 | Multi-Stage Fracture | 1797.80 | 1799.70 | 0 |
2015-07-10 | Multi-Stage Fracture | 1738.90 | 1740.80 | 0 |
2015-07-09 | Multi-Stage Fracture | 3711.50 | 3713.40 | 0 |
2015-07-10 | Multi-Stage Fracture | 1679.90 | 1681.80 | 0 |
2015-07-10 | Multi-Stage Fracture | 1634.60 | 1636.40 | 0 |
2015-07-10 | Multi-Stage Fracture | 1593.30 | 1595.20 | 0 |
2015-07-09 | Multi-Stage Fracture | 3653.70 | 3655.60 | 0 |
2015-07-09 | Multi-Stage Fracture | 3594.80 | 3596.70 | 0 |
2015-07-09 | Multi-Stage Fracture | 3535.90 | 3537.80 | 0 |
2015-07-10 | Multi-Stage Fracture | 3490.50 | 3492.40 | 0 |
2015-07-10 | Multi-Stage Fracture | 3432.40 | 3434.30 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-07-09 | 2015-07-10 | 1,426 | 3,442 | N/A |
2 | 2015-07-09 | 2015-07-09 | 1,426 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 83.9859 | N/A | |||
Sand - Tier 2 (20/40) | Trican | silica crystalline | 14808-60-7 | 100 | 10.6801 | N/A | ||
Sand - Tier 2 (30/50) | Trican | silica crystalline | 14808-60-7 | 100 | 4.9976 | N/A | ||
Busan 94 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0104 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0104 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0104 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0104 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0104 | N/A | ||||
CC-8 | Trican | Clay Control | choline chloride | 67-48-1 | 100 | 0.1847 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.1847 | N/A | ||||
GNE-2 | Trican | Demulsifier | non-hazardous ingredients | Not Available | 100 | 0.0428 | N/A | |
propylene glycol | 57-55-6 | 100 | 0.0428 | N/A | ||||
FR-12 | Trican | Friction Reducer | ammonium chloride | 12125-02-9 | 100 | 0.0886 | N/A | |
anionic polyacrylamide copolymer | 25987-30-8 | 100 | 0.0886 | N/A | ||||
distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0886 | N/A | ||||
2 | Sand - Tier 2 (40/70) | Trican | silica crystalline | 14808-60-7 | 100 | 0.4039 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2015-07-09 | 2015-07-11 | Surface Water - Lake | 2900 |
2015-06-06 | 2015-07-10 | Recycled Fracturing Water (treated at well site) | 542 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2015 | 3693 | 0.0 | 0.0 | 0.0 |
2016 | 8739 | 0.0 | 0.0 | 0.0 |
2017 | 8631 | 0.0 | 0.0 | 0.0 |
2018 | 8533 | 0.0 | 0.0 | 0.0 |
2019 | 8582 | 0.0 | 0.0 | 0.0 |
2020 | 2161 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-06-11 | No Incident Encountered | 0.00 | 0.00 |
2015-07-10 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]