If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485050807000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.110212,"lon":-114.688331,"icon":""}]} |
Location: 00/07-08-048-05W5/0 | |
Location Alias: 00/07-08-48-05 W5M | |
Location Alias 2: 00/07-08-048-05 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 05 | |
Section: 08 | |
County/Municipality: Brazeau County | |
Well Name: BONTERRA HZ PEMBINA 7-8-48-5 | |
Operator Name: Bonterra Energy Corp. | |
License Number: 0479652 | |
License Date: 2016-06-14 | |
License Status: Amended | |
Spud Date: 2017-02-15 | |
Final Drill Date: 2017-02-20 | |
Well Total Depth: 3176.00 m | |
Surface Hole Latitude: 53.110212 | |
Surface Hole Longitude: -114.688331 |
Date | Event |
---|---|
2016-06-14 | Obtained License |
2017-02-16 | Surface Casing Operation Performed |
2017-02-17 | Direction Drilling Operation Performed - Deviate |
2017-02-17 | Direction Drilling Operation Performed - Horizontal |
2017-02-20 | Finished Drilling |
2017-02-20 | Production Casing Operation Performed |
2017-02-20 | Well Log Performed |
2017-02-20 | Well Mode changed to Drilled and Cased |
2017-02-21 | Production Casing Operation Performed |
2017-02-21 | Rig Released |
2017-03-17 | Well Log Performed |
2017-03-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-03-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-04-01 | Well Began Production |
2017-04-01 | Well Fluid changed to Crude Oil |
2017-04-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-02-15 | Ironhand Drilling Inc. | 1 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-02-17 | 1049.20 | Deviate (5 - 79 degrees) |
2017-02-17 | 1619.60 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-03-19 | Multi-Stage Fracture | 3140.10 | 3140.70 | 0 |
2017-03-19 | Multi-Stage Fracture | 2688.00 | 2689.90 | 0 |
2017-03-19 | Multi-Stage Fracture | 2637.00 | 2638.90 | 0 |
2017-03-19 | Multi-Stage Fracture | 2586.10 | 2588.00 | 0 |
2017-03-19 | Multi-Stage Fracture | 2535.30 | 2537.20 | 0 |
2017-03-19 | Multi-Stage Fracture | 2485.70 | 2487.60 | 0 |
2017-03-19 | Multi-Stage Fracture | 2434.60 | 2436.50 | 0 |
2017-03-20 | Multi-Stage Fracture | 2383.70 | 2385.60 | 0 |
2017-03-20 | Multi-Stage Fracture | 2332.60 | 2334.50 | 0 |
2017-03-20 | Multi-Stage Fracture | 2282.10 | 2284.00 | 0 |
2017-03-20 | Multi-Stage Fracture | 2231.80 | 2233.70 | 0 |
2017-03-19 | Multi-Stage Fracture | 3091.30 | 3093.20 | 0 |
2017-03-20 | Multi-Stage Fracture | 2181.00 | 2182.90 | 0 |
2017-03-20 | Multi-Stage Fracture | 2130.70 | 2132.60 | 0 |
2017-03-20 | Multi-Stage Fracture | 2080.00 | 2081.90 | 0 |
2017-03-20 | Multi-Stage Fracture | 2029.10 | 2031.00 | 0 |
2017-03-20 | Multi-Stage Fracture | 1979.20 | 1981.10 | 0 |
2017-03-20 | Multi-Stage Fracture | 1928.60 | 1930.50 | 0 |
2017-03-20 | Multi-Stage Fracture | 1878.30 | 1880.20 | 0 |
2017-03-20 | Multi-Stage Fracture | 1827.50 | 1829.40 | 0 |
2017-03-20 | Multi-Stage Fracture | 1777.20 | 1779.10 | 0 |
2017-03-20 | Multi-Stage Fracture | 1726.20 | 1728.10 | 0 |
2017-03-19 | Multi-Stage Fracture | 3040.50 | 3042.40 | 0 |
2017-03-20 | Multi-Stage Fracture | 1675.40 | 1677.30 | 0 |
2017-03-19 | Multi-Stage Fracture | 2990.30 | 2992.20 | 0 |
2017-03-19 | Multi-Stage Fracture | 2939.90 | 2941.80 | 0 |
2017-03-19 | Multi-Stage Fracture | 2889.10 | 2891.00 | 0 |
2017-03-19 | Multi-Stage Fracture | 2839.10 | 2841.00 | 0 |
2017-03-19 | Multi-Stage Fracture | 2788.30 | 2790.20 | 0 |
2017-03-19 | Multi-Stage Fracture | 2737.80 | 2739.70 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-03-19 | 2017-03-20 | 1,412 | 3,219 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | 7732-18-5 | 100 | 87.4348 | N/A | |||
Frac Sand - Regular | Iron Horse Energy Services | Crystalline Silica | 14808-60-7 | 100 | 6.1402 | N/A | ||
Tolcide PS75LT | Fusion Technologies Inc. | Bactericide/Biocide | Tetrakis(Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0435 | N/A | |
water | 7732-18-5 | 100 | 0.0435 | N/A | ||||
IH-CS-2 | Fusion Technologies Inc. | Clay Control | Non-Whimis Regulated | 64-18-6 | 100 | 0.0886 | N/A | |
IH-FR-1C | Fusion Technologies Inc. | Friction Reducer | Non-Whimis Regulated | Not Available | 100 | 0.0815 | N/A | |
IH-NE-7 | Fusion Technologies Inc. | Surfactant | 2-ethyhexanol | 104-76-7 | 100 | 0.0709 | N/A | |
EO-C7-9-iso. C8-rich alcohols | 78330-19-5 | 100 | 0.0709 | N/A | ||||
EO-C9-11-iso. C10-rich alcohols | 78330-20-8 | 100 | 0.0709 | N/A | ||||
Heavy aromatic naptha | 64742-94-5 | 100 | 0.0709 | N/A | ||||
Isopropanol | 67-63-0 | 100 | 0.0709 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0709 | N/A | ||||
Polyethylene glycol | 25322-68-3 | 100 | 0.0709 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-03-17 | 2017-03-18 | Surface Water - Runoff | 2400 |
2017-03-20 | 2017-03-21 | Surface Water - Runoff | 830 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 6387 | 0.0 | 0.0 | 0.0 |
2018 | 8480 | 0.0 | 0.0 | 0.0 |
2019 | 8631 | 0.0 | 0.0 | 0.0 |
2020 | 2173 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-02-21 | No Incident Encountered | 0.00 | 0.00 |
2017-03-20 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]