X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485050716030

Well Details

Well ID: 0485050716030
Loading map...
Location: 03/16-07-048-05W5/0
Location Alias: 03/16-07-48-05 W5M
Location Alias 2: 03/16-07-048-05 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 05
Section: 07
County/Municipality: Brazeau County
Well Name: BONTERRA 103 HZ PEMBINA 16-7-48-5
Operator Name: Bonterra Energy Corp.
License Number: 0474703
License Date: 2015-02-24
License Status: Issued
Spud Date: 2015-05-25
Final Drill Date: 2015-06-01
Well Total Depth: 3901.00 m
Surface Hole Latitude: 53.110214
Surface Hole Longitude: -114.707710

For data sources see[1][2]

Well History

Date Event
2015-02-24 Obtained License
2015-05-26 Surface Casing Operation Performed
2015-05-27 Direction Drilling Operation Performed - Deviate
2015-05-28 Direction Drilling Operation Performed - Horizontal
2015-06-01 Finished Drilling
2015-06-01 Well Mode changed to Drilled and Cased
2015-06-02 Production Casing Operation Performed
2015-06-03 Rig Released
2015-07-03 Well Log Performed
2015-07-14 Perforation Treatment Performed - Multi-Stage Fracture
2015-07-15 Perforation Treatment Performed - Multi-Stage Fracture
2015-07-19 Well Began Production
2015-07-19 Well Fluid changed to Crude Oil
2015-07-19 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-05-25 Ironhand Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-05-27 633.70 Deviate (5 - 79 degrees)
2015-05-28 1559.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-07-14 Multi-Stage Fracture 3871.70 3873.10 0
2015-07-14 Multi-Stage Fracture 3395.70 3397.60 0
2015-07-15 Multi-Stage Fracture 3350.30 3352.20 0
2015-07-15 Multi-Stage Fracture 3291.40 3293.30 0
2015-07-15 Multi-Stage Fracture 3232.50 3234.40 0
2015-07-15 Multi-Stage Fracture 3176.60 3178.40 0
2015-07-15 Multi-Stage Fracture 3131.20 3133.00 0
2015-07-15 Multi-Stage Fracture 3072.20 3074.10 0
2015-07-15 Multi-Stage Fracture 3013.40 3015.20 0
2015-07-15 Multi-Stage Fracture 2954.50 2956.40 0
2015-07-15 Multi-Stage Fracture 2909.10 2911.00 0
2015-07-14 Multi-Stage Fracture 3828.10 3830.00 0
2015-07-15 Multi-Stage Fracture 2853.20 2855.10 0
2015-07-15 Multi-Stage Fracture 2794.30 2796.20 0
2015-07-15 Multi-Stage Fracture 2735.40 2737.30 0
2015-07-15 Multi-Stage Fracture 2676.50 2678.30 0
2015-07-15 Multi-Stage Fracture 2617.60 2619.40 0
2015-07-15 Multi-Stage Fracture 2560.50 2562.40 0
2015-07-15 Multi-Stage Fracture 2504.60 2506.50 0
2015-07-15 Multi-Stage Fracture 2445.70 2447.60 0
2015-07-15 Multi-Stage Fracture 2386.70 2388.60 0
2015-07-15 Multi-Stage Fracture 2327.80 2329.70 0
2015-07-14 Multi-Stage Fracture 3782.80 3784.60 0
2015-07-15 Multi-Stage Fracture 2269.00 2270.80 0
2015-07-15 Multi-Stage Fracture 2210.00 2211.90 0
2015-07-15 Multi-Stage Fracture 2151.10 2153.00 0
2015-07-15 Multi-Stage Fracture 2094.00 2095.90 0
2015-07-15 Multi-Stage Fracture 2035.20 2037.10 0
2015-07-15 Multi-Stage Fracture 1976.30 1978.20 0
2015-07-15 Multi-Stage Fracture 1917.20 1919.10 0
2015-07-15 Multi-Stage Fracture 1858.30 1860.20 0
2015-07-15 Multi-Stage Fracture 1802.50 1804.40 0
2015-07-15 Multi-Stage Fracture 1743.70 1745.60 0
2015-07-14 Multi-Stage Fracture 3723.80 3725.70 0
2015-07-15 Multi-Stage Fracture 1685.60 1687.50 0
2015-07-14 Multi-Stage Fracture 3664.90 3666.80 0
2015-07-14 Multi-Stage Fracture 3605.90 3607.80 0
2015-07-14 Multi-Stage Fracture 3560.60 3562.40 0
2015-07-14 Multi-Stage Fracture 3501.70 3503.50 0
2015-07-14 Multi-Stage Fracture 3445.70 3447.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-07-14 2015-07-15 1,425 3,290 N/A
2 2015-07-14 2015-07-14 1,425 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 83.3108 N/A
Sand - Tier 2 (20/40) Trican silica crystalline 14808-60-7 100 11.3418 N/A
Sand - Tier 2 (30/50) Trican silica crystalline 14808-60-7 100 5.0138 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0104 N/A
dibromoacetonitrile 3252-43-5 100 0.0104 N/A
non-hazardous ingredients Not Available 100 0.0104 N/A
polyethylene glycol 25322-68-3 100 0.0104 N/A
sodium bromide 7647-15-6 100 0.0104 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1832 N/A
non-hazardous ingredients Not Available 100 0.1832 N/A
GNE-2 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0424 N/A
propylene glycol 57-55-6 100 0.0424 N/A
FR-12 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0878 N/A
anionic polyacrylamide copolymer 25987-30-8 100 0.0878 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0878 N/A
2 Sand - Tier 2 (40/70) Trican silica crystalline 14808-60-7 100 0.3718 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-07-09 2015-07-11 Surface Water - Lake 2709
2015-06-08 2015-07-08 Recycled Fracturing Water (treated at well site) 580

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 3577 0.0 0.0 0.0
2016 8597 0.0 0.0 0.0
2017 8631 0.0 0.0 0.0
2018 8235 0.0 0.0 0.0
2019 8478 0.0 0.0 0.0
2020 2173 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-06-03 No Incident Encountered 0.00 0.00
2015-07-15 No Incident Encountered 0.00 0.00

For data sources see[10]

References