X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485050716020

Well Details

Well ID: 0485050716020
Loading map...
Location: 02/16-07-048-05W5/0
Location Alias: 02/16-07-48-05 W5M
Location Alias 2: 02/16-07-048-05 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 05
Section: 07
County/Municipality: Brazeau County
Well Name: BONTERRA 102 HZ PEMBINA 16-7-48-5
Operator Name: Bonterra Energy Corp.
License Number: 0474362
License Date: 2015-01-23
License Status: Issued
Spud Date: 2015-02-15
Final Drill Date: 2015-02-21
Well Total Depth: 4040.00 m
Surface Hole Latitude: 53.110434
Surface Hole Longitude: -114.723333

For data sources see[1][2]

Well History

Date Event
2015-01-23 Obtained License
2015-02-16 Direction Drilling Operation Performed - Deviate
2015-02-16 Direction Drilling Operation Performed - Horizontal
2015-02-16 Surface Casing Operation Performed
2015-02-21 Finished Drilling
2015-02-21 Well Mode changed to Drilled and Cased
2015-02-23 Production Casing Operation Performed
2015-02-24 Rig Released
2015-05-27 Well Log Performed
2015-06-03 Perforation Treatment Performed - Multi-Stage Fracture
2015-06-04 Perforation Treatment Performed - Multi-Stage Fracture
2015-06-26 Well Began Production
2015-06-26 Well Fluid changed to Crude Oil
2015-06-26 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-02-15 Ironhand Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-02-16 518.10 Deviate (5 - 79 degrees)
2015-02-16 1802.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-06-03 Multi-Stage Fracture 4015.00 4015.80 0
2015-06-03 Multi-Stage Fracture 3508.60 3510.50 0
2015-06-03 Multi-Stage Fracture 3445.60 3447.50 0
2015-06-03 Multi-Stage Fracture 3394.20 3396.10 0
2015-06-03 Multi-Stage Fracture 3331.30 3333.20 0
2015-06-03 Multi-Stage Fracture 3280.20 3282.10 0
2015-06-04 Multi-Stage Fracture 3217.80 3219.70 0
2015-06-04 Multi-Stage Fracture 3166.50 3168.40 0
2015-06-04 Multi-Stage Fracture 3103.50 3105.40 0
2015-06-04 Multi-Stage Fracture 3052.40 3054.30 0
2015-06-04 Multi-Stage Fracture 2989.50 2991.40 0
2015-06-03 Multi-Stage Fracture 3965.50 3967.40 0
2015-06-04 Multi-Stage Fracture 2938.00 2939.90 0
2015-06-04 Multi-Stage Fracture 2875.30 2877.20 0
2015-06-04 Multi-Stage Fracture 2824.30 2826.20 0
2015-06-04 Multi-Stage Fracture 2761.30 2763.20 0
2015-06-04 Multi-Stage Fracture 2710.00 2711.90 0
2015-06-04 Multi-Stage Fracture 2647.00 2648.90 0
2015-06-04 Multi-Stage Fracture 2595.60 2597.50 0
2015-06-04 Multi-Stage Fracture 2532.70 2534.60 0
2015-06-04 Multi-Stage Fracture 2481.50 2483.40 0
2015-06-04 Multi-Stage Fracture 2418.60 2420.50 0
2015-06-03 Multi-Stage Fracture 3902.60 3904.50 0
2015-06-04 Multi-Stage Fracture 2367.30 2369.20 0
2015-06-04 Multi-Stage Fracture 2304.30 2306.20 0
2015-06-04 Multi-Stage Fracture 2253.00 2254.90 0
2015-06-04 Multi-Stage Fracture 2190.20 2192.10 0
2015-06-04 Multi-Stage Fracture 2139.00 2140.90 0
2015-06-04 Multi-Stage Fracture 2087.70 2089.60 0
2015-06-04 Multi-Stage Fracture 2036.30 2038.10 0
2015-06-04 Multi-Stage Fracture 1985.00 1986.80 0
2015-06-04 Multi-Stage Fracture 1933.60 1935.50 0
2015-06-04 Multi-Stage Fracture 1882.20 1884.10 0
2015-06-03 Multi-Stage Fracture 3851.20 3853.10 0
2015-06-04 Multi-Stage Fracture 1831.00 1832.90 0
2015-06-03 Multi-Stage Fracture 3788.20 3790.10 0
2015-06-03 Multi-Stage Fracture 3737.00 3738.80 0
2015-06-03 Multi-Stage Fracture 3674.30 3676.20 0
2015-06-03 Multi-Stage Fracture 3623.00 3624.90 0
2015-06-03 Multi-Stage Fracture 3560.10 3562.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-06-03 2015-06-04 1,433 3,256 N/A
2 2015-06-03 2015-06-03 1,433 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 83.8445 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 10.7748 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 5.0409 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0104 N/A
dibromoacetonitrile 3252-43-5 100 0.0104 N/A
non-hazardous ingredients Not Available 100 0.0104 N/A
polyethylene glycol 25322-68-3 100 0.0104 N/A
sodium bromide 7647-15-6 100 0.0104 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1844 N/A
non-hazardous ingredients Not Available 100 0.1844 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0461 N/A
propylene glycol 57-55-6 100 0.0461 N/A
FR-12 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0884 N/A
anionic polyacrylamide copolymer 25987-30-8 100 0.0884 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0884 N/A
2 Sand 40/70 Trican silica crystalline 14808-60-7 100 0.4069 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-06-03 2015-06-04 Surface Water - Lake 2506
2015-05-31 2015-06-05 Recycled Fracturing Water (treated at well site) 750

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 3621 0.0 0.0 0.0
2016 8739 0.0 0.0 0.0
2017 8643 0.0 0.0 0.0
2018 8460 0.0 0.0 0.0
2019 8678 0.0 0.0 0.0
2020 2149 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-02-24 No Incident Encountered 0.00 0.00
2015-06-04 No Incident Encountered 0.00 0.00

For data sources see[10]

References